Permit Information
Permit NumberBLD06-03472
StatusFinaled
Name HIGH DESERT CONSTRUCTION
Site Address 433 S WHISPERWOOD WY
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR CALVIN HIATT REGISTRATION NUMBER RCE-5204" To construct a 2132 sq.ft. Two Story Townhouse on a zero lot line (1732sq.ft. Main floor / 400sq.ft. Upper floor Bonus room) with a 15 sq.ft. Covered front porch, a 48sq.ft. Covered patio, and a 561 sq.ft. Two car Attached garage per approved plans, all red-lining, and Plan review report. THE CONSTRUCTION OF THE DWELLING UNIT SEPERATION WALLS ARE DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. R-2D zoniong district, building setbacks, CUP03-0001, and DRH06-0528 per J.W. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/14/20076/15/20076/15/2007APASS
DetailsMike Jordan
calvin; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
DOC - Permit Finaled6/15/20076/15/20076/15/2007PPASS
DetailsMike Jordan
Code Occupancy Approval Temp6/14/20076/14/20076/14/2007PCANC
DetailsScott M.Brown
TEMP OK
BLD-Other6/13/20076/14/20076/14/2007ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/13/2007 at 6:14:41 PM. Contact: ###-####.
BLD-Final6/8/20076/8/20076/8/2007PCANC
DetailsMike Jordan
Calvin; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Energy code compliance3/29/20073/29/20073/29/2007PPASS
DetailsTom Arcoraci
dwayne; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in3/26/20073/27/20073/27/2007APASS
DetailsTom Arcoraci
duane ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection3/6/20073/7/20073/7/2007ADONE
DetailsJim Sly
Calvin pls call prior 30 min ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
Met with Contr.....Arch to provide new detail for 2hr wall......not built per appr plan.
BLD-Foundation2/14/20072/14/20072/14/2007PPASS
DetailsJim Sly
Pouring at 2 p.m. Inspection at 1 p,m. Call Ben with questions. Phone #: ###-####
BLD-Footing2/12/20072/13/20072/13/2007APART
DetailsMike Jordan
Will be ready for inspection at 11 a.m., pouring at noon. Please call Ben with questions. Phone #: ###-####
Issue PAID IN FULL permit  1/31/2007 DONE
Plan assigned to (SRZ)1/30/20071/30/20071/30/2007 PASS
1/30/2007 09:47:40 SRZ - activity updated through activity BLDA022 from case BLD06-03472.
PLANS/APPL TAKEN TO FRONT DESK  1/30/2007 DONE
Inspection Record Card- Bld  1/30/2007 DONE
CHANGE STATUS TO (RDY)  1/30/2007 DONE
Telephone call  1/30/2007 DONE
CALLED PERMIT READY FAXED FEES ,LOT/BLOCK & BLD OVER///DLD
Pending Assignment by SRZ12/11/2006 1/30/2007 DONE
1/30/2007 09:41:54 SRZ - activity updated through activity BLDA160 from case BLD06-03472.
Routing - PLAN CHECK1/16/2007 1/30/2007 PASS
Case Summary (BLD)  1/30/2007  
Plan resubmittals received  1/26/2007  
rec'd 1 set of sheet #s A-0.1, A-1.0, A-2.0, - A-2.1 (2) , A-3.0, A-4.0, A-5.0, A-5.1, A-7.0 - taken to Sam Zahorka
Routing - PUBLIC WORKS1/12/2007 1/12/2007 PASS
Routing - PLANNING1/12/2007 1/12/2007 PASS
Approved per DRH06-00528
Application received  12/11/2006  
Routing - Addressing12/11/2006 12/11/2006 PASS
Routing - PLANNING12/11/2006   FAIL
Routed to Josh W. 1/8/07 drh06-528 Needs Design Review approval