Permit Information
Permit NumberBLD06-03518
StatusFinaled
Name ROYAL PLAZA MASTER CONDO OA INC
Site Address 1112 W MAIN ST Unit: 501
Project NameROYAL PLAZA
Customer Number 
ePlanReviewNo
Description
(ROYAL PLAZA - ANDREA CONDOS - RESIDENTIAL SUITE 501) This building is fire sprinklered for high-rise. To create a 3,177 square foot residential condominium unit on the 5th story of a high-rise building. Work is to include 1-hr fire-resistance-rated dwelling unit separation walls, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. The 1-hr fire-resistance-rated corridor was constructed under permit BLD06-03528. Work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/1/2018 DONE
BLD-Final5/31/20185/31/20185/31/2018PPASS
DetailsBob Archibald
Chrisitna Phone #: ###-####. Affidavit of agreement, # 2###-####10, filed with Ada County. Ok to final.
BLD-Aging Inspection4/30/20184/30/20185/1/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection2/26/20182/26/20182/26/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection12/25/201712/25/201712/26/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/23/201710/23/201710/23/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection8/21/20178/21/20178/22/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection6/19/20176/19/20176/19/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection4/17/20174/17/20174/17/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection2/13/20172/13/20172/13/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/12/201612/12/201612/12/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection10/10/201610/10/201610/10/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/8/20168/8/20168/9/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection6/6/20166/6/20166/6/2016 PASS
DetailsDave Hannah
BLD-Aging Inspection4/4/20164/4/20164/4/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection2/1/20162/1/20162/1/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection11/30/201511/30/201511/30/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection9/28/20159/28/20159/29/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection7/27/20157/27/20157/30/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection5/25/20155/25/20156/1/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection3/23/20153/23/20153/23/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection1/19/20151/19/20151/20/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection11/17/201411/17/201411/17/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection9/15/20149/15/20149/15/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection7/14/20147/14/20147/14/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection5/12/20145/12/20145/12/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection3/10/20143/10/20143/17/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection1/6/20141/6/20141/6/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection11/4/201311/4/201311/4/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection9/2/20139/2/20139/3/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection7/1/20137/1/20137/1/2013 PASS
DetailsDave Hannah
BLD-Aging Inspection4/30/20134/30/20134/30/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection2/25/20132/25/20132/25/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection12/24/201212/24/201212/24/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection10/22/201210/22/201210/22/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection8/20/20128/20/20128/20/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection6/18/20126/18/20126/19/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection4/16/20124/16/20124/16/2012 DEFR
DetailsDave Hannah
BLD-Aging Inspection2/13/20122/13/20122/14/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection12/14/201112/14/201112/16/2011 DEFR
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection10/5/201110/5/201110/5/2011 DEFR
DetailsDave Hannah
see history temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection8/3/20118/3/20118/3/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection6/1/20116/1/20116/1/2011 PEND
DetailsDave Hannah
temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection3/29/20113/29/20113/29/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection1/25/20111/25/20111/25/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection11/23/201011/23/201011/23/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection9/21/20109/21/20109/21/2010 DEFR
DetailsDave Hannah
BLD-Aging Inspection7/20/20107/20/20107/20/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection5/14/20105/14/20105/14/2010 DEFR
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Final1/22/20081/22/20081/25/2008PPART
DetailsDave Hannah
todd Phone #: ###-#### ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
Temporary Occupancy1/23/20084/22/20081/23/2008 DONE
DetailsCathy Weisshaupt
FIRE-Final Inspection1/22/20081/22/20081/22/2008PPART
DetailsForrest France
Fire life safety is satisfactory pending shell and core building final.
BLD-Final1/8/20081/8/20081/8/2008PNR
DetailsDave Hannah
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final1/4/20081/8/20081/8/2008ANR
DetailsDave Hannah
Tod; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
FIRE-Final Inspection1/4/20081/7/20081/7/2008AFAIL
DetailsForrest France
Need project related fire alarm and fire sprinkler permit inspections, approvals and finals prior to life safety final.
BLD-Framing/Rough-in9/11/20079/12/20079/12/2007APASS
DetailsDave Hannah
Justin; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Framing/Rough-in9/10/20079/11/20079/12/2007APASS
DetailsDave Hannah
justin Phone #: ###-####
BLD-Conference8/17/20078/20/20078/21/2007PPART
DetailsDave Hannah
Unit 501 / Overhead Inspection to Cover / Applicable Terraces Phone #: ###-#### Internet Inspection Request from: Justin Palm ok to cover terrace needs to seal around beams ect
BLD-Framing/Rough-in8/13/20078/14/20078/14/2007APART
DetailsDave Hannah
justin Phone #: ###-#### ok to cover terrace and int walls
BLD-Framing/Rough-in8/3/20078/6/20078/6/2007AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/3/2007 at 4:46:09 PM. Contact: ###-####. fire proofing not complet
BLD-Aging Inspection7/11/20077/11/20077/13/2007 PASS
DetailsDave Hannah
(F) Reprint permit  7/10/2007 DONE
CHANGE STATUS TO (ISS)  7/10/2007 DONE
Routing - PLAN CHECK5/14/2007 6/15/2007 PASS
Review of modified drawings completed. Drawings approved.
PLANS/APPL TAKEN TO FRONT DESK  6/15/2007 DONE
Print Occupancy Form  6/15/2007 DONE
Permit Ready to Issue  6/15/2007 DONE
Telephone call  6/15/2007 DONE
called Darrell at McAlvain Const. and told him permit is ready and fee
(F) Reprint permit  5/9/2007  
Issue PAID IN FULL permit  3/30/2007 DONE
Routing - PLAN CHECK3/7/2007 3/8/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/8/2007 DONE
Print Occupancy Form  3/8/2007 DONE
Telephone call  3/8/2007 DONE
t/c w randy at ###-#### - permit ready and fees given
Permit Ready to Issue  3/8/2007  
Plan assigned to (CJW)12/22/2006 3/8/2007 PASS
3/8/2007 11:09:52 CJW - activity updated through activity BLDA022 from case BLD06-03518.
Routing - FIRE3/2/2007 3/7/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK1/17/2007 3/2/2007 PASS
Completed resubmittal review. Drawings approved.
Plan resubmittals received  1/30/2007  
rec'd response letter from Habitec, response letter from DC Engineering, Plan Review Report, Fire Code Reivew - 2 sets of of sheet #s A2.1, A3.1, M0.2, M1.1, E0.1, E0.2, E1.0L, E1.0P, P1.1, P1.2, P1.3 - taken to Carl Westfall
Routing - FIRE1/11/2007 1/17/2007 FAIL
Emailed resubmittal items to architect. Inserted review comments to plans.
1st review completed  1/17/2007 FAIL
Failed fire and plan check.
Routing - PLAN CHECK12/27/2006 1/11/2007 FAIL
The IBC plan review was started and finished on January 11, 2007. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS12/22/2006 12/27/2006 PASS
Routing - Addressing12/26/2006 12/26/2006 PASS
Pending Assignment by MYS12/15/2006 12/22/2006 DONE
12/22/2006 14:56:44 MYS - activity updated through activity BLDA172 from case BLD06-03518.
Plans ACCEPTED BY PLAN TECH  12/15/2006  
Recd Pcfee & Taken To Pln CK  12/15/2006 DONE
Application received  12/14/2006