Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-03521
StatusFinaled
Name ROYAL PLAZA MASTER CONDO OA INC
Site Address 1112 W MAIN ST Unit: 504
Project NameROYAL PLAZA
Customer Number 
ePlanReviewNo
Description
(ROYAL PLAZA - ANDREA CONDOS - RESIDENTIAL SUITE 504) This building is fire sprinklered for high-rise. To create a 2,790 square foot residential condominium unit on the 5th story of a high-rise building. Work is to include 1-hr fire-resistance-rated dwelling unit separation walls, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. The 1-hr fire-resistance-rated corridor was constructed under permit BLD06-03528. Work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/1/2018 DONE
BLD-Final5/31/20185/31/20185/31/2018PPASS
DetailsBob Archibald
Chrisitna Phone #: ###-####. Affidavit of agreement, # 2###-####10, filed with Ada County. Ok to final.
BLD-Aging Inspection11/3/201511/3/201511/6/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection8/4/20158/4/20158/7/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection5/5/20155/5/20155/5/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection2/3/20152/3/20152/3/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection11/4/201411/4/201411/4/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection8/4/20148/4/20148/5/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection4/16/20144/16/20144/18/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection1/15/20141/15/20141/17/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection10/15/201310/15/201310/15/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection7/16/20137/16/20137/24/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection4/16/20134/16/20134/17/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection1/14/20131/14/20131/14/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection10/5/201210/5/201210/5/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection7/6/20127/6/20127/9/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection4/6/20124/6/20124/9/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection1/6/20121/6/20121/11/2012 FAIL
DetailsDave Hannah
needs final
BLD-Aging Inspection10/7/201110/7/201110/10/2011 FAIL
DetailsDave Hannah
needs final
BLD-Aging Inspection7/8/20117/8/20117/15/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection3/30/20113/30/20113/31/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection1/25/20111/25/20111/25/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection11/23/201011/23/201011/23/2010 DEFR
DetailsDave Hannah
BLD-Aging Inspection9/22/20109/22/20109/22/2010 DONE
DetailsDave Hannah
see history
BLD-Aging Inspection7/20/20107/20/20107/20/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection5/18/20105/18/20105/18/2010 DEFR
DetailsDave Hannah
FIRE-Final Inspection3/11/20083/12/20083/12/2008PPASS
DetailsForrest France
Noted correction items verified for completion, fire life safety finaled.
FIRE-Final Inspection3/6/20083/6/20083/6/2008PFAIL
DetailsForrest France
Missing smoke seal at the back exit, need to adjust the closure at the trash chute door in the common corridor.
BLD-Framing/Rough-in9/10/20079/11/20079/12/2007APASS
DetailsDave Hannah
justin Phone #: ###-####
BLD-Framing/Rough-in8/23/20078/24/20078/24/2007APASS
DetailsDave Hannah
jerry Phone #: ###-#### ok to cover ceiling
BLD-Framing/Rough-in8/17/20078/20/20078/21/2007PPART
DetailsDave Hannah
Inspection to cover overhead on Terrace / West Wall Fire Rating Phone #: ###-#### Internet Inspection Request from: Justin Palm ok to cover terrace
BLD-Framing/Rough-in8/13/20078/14/20078/14/2007APART
DetailsDave Hannah
justin Phone #: ###-#### ok to cover terrace but need to finish 2hr wall and walls
BLD-Framing/Rough-in8/13/20078/13/20078/14/2007PDONE
DetailsDave Hannah
###-#### - Justin
BLD-Footing8/9/20078/10/20078/13/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/9/2007 at 5:06:26 PM. Contact: ###-####.
CHANGE STATUS TO (ISS)  8/9/2007 DONE
(F) Reprint permit  8/9/2007 DONE
Plan assigned to (CJW)5/14/2007 8/8/2007 PASS
8/8/2007 07:55:33 CJW - activity updated through activity BLDA022 from case BLD06-03521.
PLANS/APPL TAKEN TO FRONT DESK  8/8/2007 DONE
Permit Ready to Issue  8/8/2007 DONE
Print Occupancy Form  8/8/2007 DONE
Telephone call  8/8/2007 DONE
Called Brandi and told her permit is ready & fees///8/8/07 @10:48am BAS
Routing - PLAN CHECK5/14/2007 8/7/2007 PASS
6-12-07) Modified drawings did not show compliance with applicable standards. E-mailed the Architect's representative asking for revised drawings. (8-7-07) Revised modified drawings reviewed and approved.
Plan resubmittals received  7/30/2007  
received 1 comment and 2 copys of sheet A2.1 taken to Carl W.
Plan resubmittals received  5/14/2007 DONE
received 1 letter and 2 copys of sheets A2.1,A2.2,A2.3,A3.1 taken to Carl W this permit was issued 3-30-07 ///dld
(F) Reprint permit  5/9/2007  
Issue PAID IN FULL permit  3/30/2007 DONE
Plan assigned to (CJW)12/22/2006 3/8/2007 PASS
3/8/2007 11:44:47 CJW - activity updated through activity BLDA022 from case BLD06-03521.
Routing - PLAN CHECK3/7/2007 3/8/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/8/2007 DONE
Print Occupancy Form  3/8/2007 DONE
CHANGE STATUS TO (RDY)  3/8/2007 DONE
Routing - FIRE3/6/2007 3/7/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK1/18/2007 3/5/2007 PASS
Completed resubmittal review. Drawings approved.
Plan resubmittals received  2/8/2007  
rec'd copy of letter from DC Engineering to Habitec - 2 sets of sheet#s E0.1, E0.2, E1.0L, E1.0P - taken to Carl Westfall
Plan resubmittals received  1/30/2007  
rec'd response letter from Habitec, response letter from DC Engineering, Plan Review Report, Fire Code Reivew - 2 sets of of sheet #s A2.1, A3.1, M0.2, M1.1, E0.1, E0.2, E1.0L, E1.0P, P1.1, P1.2, P1.3 - taken to Carl Westfall
Routing - FIRE1/13/2007 1/18/2007 FAIL
Emailed resubmittal item to architect and inserted fire review comments into plans.
1st review completed  1/18/2007 FAIL
Failed plan check and fire.
Routing - PLAN CHECK12/27/2006 1/13/2007 FAIL
The IBC plan review was started and finished on January 13, 2007. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS12/22/2006 12/27/2006 PASS
Routing - Addressing12/26/2006 12/26/2006 PASS
Pending Assignment by MYS12/15/2006 12/22/2006 DONE
12/22/2006 16:05:44 MYS - activity updated through activity BLDA172 from case BLD06-03521.
Plans ACCEPTED BY PLAN TECH  12/15/2006  
Recd Pcfee & Taken To Pln CK  12/15/2006 DONE
Application received  12/14/2006