Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-03523
StatusFinaled
Name ROYAL PLAZA MASTER CONDO OA INC
Site Address 1112 W MAIN ST Unit: 601
Project NameROYAL PLAZA
Customer Number 
ePlanReviewNo
Description
(ROYAL PLAZA - ANDREA CONDOS - RESIDENTIAL SUITE 601) This building is fire sprinklered for high-rise. To create a 3,177 square foot residential condominium unit on the 6th story of a high-rise building. Work is to include 1-hr fire-resistance-rated dwelling unit separation walls, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. The 1-hr fire-resistance-rated corridor was constructed under permit BLD06-03529. Work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/1/2018 DONE
BLD-Final5/31/20185/31/20185/31/2018PPASS
DetailsBob Archibald
Chrisitna Phone #: ###-####. Affidavit of agreement, # 2###-####10, filed with Ada County. Ok to final.
BLD-Aging Inspection4/30/20184/30/20185/1/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection2/26/20182/26/20182/26/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection12/25/201712/25/201712/26/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/23/201710/23/201710/23/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection8/21/20178/21/20178/22/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection6/19/20176/19/20176/19/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection4/17/20174/17/20174/17/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection2/13/20172/13/20172/13/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/12/201612/12/201612/12/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection10/10/201610/10/201610/10/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/8/20168/8/20168/9/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection6/6/20166/6/20166/6/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection4/4/20164/4/20164/4/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection2/1/20162/1/20162/1/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection11/30/201511/30/201511/30/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection9/28/20159/28/20159/29/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection7/27/20157/27/20157/30/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection5/25/20155/25/20156/1/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection3/23/20153/23/20153/23/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection1/19/20151/19/20151/20/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection11/17/201411/17/201411/17/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection9/15/20149/15/20149/15/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection7/14/20147/14/20147/14/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection5/12/20145/12/20145/12/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection3/10/20143/10/20143/17/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection1/6/20141/6/20141/6/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection11/4/201311/4/201311/4/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection9/2/20139/2/20139/3/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection7/1/20137/1/20137/1/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection4/30/20134/30/20134/30/2013 DEFR
DetailsDave Hannah
BLD-Aging Inspection2/25/20132/25/20132/25/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection12/24/201212/24/201212/24/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection10/22/201210/22/201210/22/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection8/20/20128/20/20128/20/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection6/18/20126/18/20126/19/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection4/16/20124/16/20124/16/2012 DEFR
DetailsDave Hannah
BLD-Aging Inspection2/15/20122/15/20122/15/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection12/16/201112/16/201112/16/2011 DEFR
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection10/10/201110/10/201110/10/2011 DEFR
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection8/8/20118/8/20118/8/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection6/6/20116/6/20116/6/2011 PEND
DetailsDave Hannah
ok for temp occ needs two hour fire rated infill wall on east wall also needs shell and core finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection4/4/20114/4/20114/4/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection1/31/20111/31/20111/31/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection11/29/201011/29/201011/30/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection9/28/20109/28/20109/29/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection7/26/20107/26/20107/26/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection5/25/20105/25/20105/25/2010 DEFR
DetailsDave Hannah
FIRE-Final Inspection3/6/20083/6/20083/6/2008PPASS
DetailsForrest France
Fire life safety finaled.
Temporary Occupancy2/13/20085/13/20082/13/2008 DONE
DetailsCathy Weisshaupt
BLD-Final2/11/20082/12/20082/12/2008APART
DetailsDave Hannah
justin Phone #: ###-####ok for temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Final2/8/20082/11/20082/11/2008AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/8/2008 at 6:54:34 AM. Contact: ###-####. no inspection per bruce c
FIRE-Final Inspection2/8/20082/8/20082/8/2008APART
DetailsForrest France
Fire life safety is approved for final pending shell and core building permit final.
FIRE-Final Inspection2/6/20082/7/20082/7/2008ACANC
DetailsForrest France
justin Phone #: ###-####
BLD-Framing/Rough-in9/18/20079/19/20079/19/2007APASS
DetailsDave Hannah
justin Phone #: ###-#### ok to cover int wall and insulate ext wall after elec has oked r/i
BLD-Framing/Rough-in9/17/20079/18/20079/19/2007PFAIL
DetailsDave Hannah
justin Phone #: ###-####
BLD-Framing/Rough-in9/10/20079/11/20079/12/2007APASS
DetailsDave Hannah
justin Phone #: ###-####
BLD-Framing/Rough-in8/13/20078/14/20078/14/2007APART
DetailsDave Hannah
justin Phone #: ###-#### ok to cover terrace
BLD-Aging Inspection7/12/20077/12/20077/13/2007 PASS
DetailsDave Hannah
(F) Reprint permit  7/10/2007 DONE
CHANGE STATUS TO (ISS)  7/10/2007 DONE
Routing - PLAN CHECK5/14/2007 7/5/2007 PASS
(6-13-07) The modified drawings were reviewed but NOT approved. Waiting for revised drawings. (7-5-07) The resubmitted modified drawings were reviewed and approved with 'red lines'.
PLANS/APPL TAKEN TO FRONT DESK  7/5/2007 DONE
Print Occupancy Form  7/5/2007 DONE
Permit Ready to Issue  7/5/2007 DONE
Telephone call  7/5/2007  
called and left voice mail for Brandi Johns that permit is ready and fee
Plan resubmittals received  7/3/2007  
received 1 comments and 2 copys of sheets A2.1,A2.2 taken to Carl W.
Plan resubmittals received  5/14/2007  
received 1 letter and 2 copys of sheets A2.1,A2.2,A2.3,A3.1 taken to Carl W this permit was issued 3-30-07 ///dld
(F) Reprint permit  5/9/2007  
Issue PAID IN FULL permit  3/30/2007 DONE
Plan assigned to (CJW)12/22/2006 3/8/2007 PASS
3/8/2007 11:15:43 CJW - activity updated through activity BLDA022 from case BLD06-03523.
Routing - PLAN CHECK3/7/2007 3/8/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/8/2007 DONE
Print Occupancy Form  3/8/2007 DONE
CHANGE STATUS TO (RDY)  3/8/2007 DONE
Routing - FIRE3/2/2007 3/7/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK1/17/2007 3/2/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  2/8/2007  
rec'd response letter from Habitec - copy of letter from DC Engineering to Habitec - 2 sets of sheet# A2.1 - 3 sets of sheet #s E0.1, E0.2, E1.0L, E1.0P - taken to Carl Westfall
Plan resubmittals received  1/30/2007  
rec'd response letter from Habitec, response letter from DC Engineering, Plan Review Report, Fire Code Reivew - 2 sets of of sheet #s A2.1, A3.1, M0.2, M1.1, E0.1, E0.2, E1.0L, E1.0P, P1.1, P1.2, P1.3 - taken to Carl Westfall
Routing - FIRE1/11/2007 1/17/2007 FAIL
Emailed resubmittal items to architect. Inserted review comments into plans.
1st review completed  1/17/2007 FAIL
Failed plan check and fire.
Routing - PLAN CHECK12/27/2006 1/11/2007 FAIL
The IBC plan review was started and finished on January 1, 2007. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS12/22/2006 12/27/2006 PASS
Routing - Addressing12/26/2006 12/26/2006 PASS
Pending Assignment by MYS12/18/2006 12/22/2006 DONE
12/22/2006 15:47:54 MYS - activity updated through activity BLDA172 from case BLD06-03523.
Plans ACCEPTED BY PLAN TECH  12/18/2006  
Recd Pcfee & Taken To Pln CK  12/18/2006 DONE
Application received  12/14/2006