Permit NumberBLD06-03540
StatusFinaled
Name SEVENTH SUN DEVELOPMENT
Site Address 300 E MALLARD DR Unit: 180
Project Name 
Customer Number 
ePlanReviewNo
Description
*(National Business Center)** To remodel an existing 1,690 sq ft office space located on the first floor per approved plans. Work to include, removal of existing nonbearing partitions and finishes. Construction of new noncombustible partitions to create offices, small conference room, work room and break room, installation of new rated door in existing corridor wall, relocate lighting and HVAC diffusers as needed, miscellaneous related interior finishes. This Building is fully fire sprinkled any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed and maintained per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/30/200710/30/200710/23/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD10/17/200710/17/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/25/200710/17/2007 DONE
Permanent Occupancy UNPAID FEE  9/25/2007 DONE
BLD-Final9/21/20079/24/20079/24/2007APASS
DetailsJim Storey
sunny Phone #: ###-####
FIRE-Final Inspection9/21/20079/21/20079/21/2007PPASS
DetailsForrest France
Fire life safety final inspection passed.
BLD-Final8/22/20078/23/20078/23/2007ANR
DetailsJim Storey
sunny Phone #: ###-#### fire failled no insp. proformed
FIRE-Final Inspection8/22/20078/23/20078/23/2007AFAIL
DetailsTroy Cobbley
LIfe safety items are ok but the problems with the sprinkler permit have not been addressed nor was it called in for inspection.
BLD-Final8/6/20078/7/20078/6/2007PCANC
DetailsJim Storey
sunny Phone #: ###-#### Inspection cancelled from web by: Cathy Weisshaupt
FIRE-Final Inspection8/6/20078/7/20078/6/2007ACANC
DetailsForrest France
sunny Phone #: ###-#### Inspection cancelled from web by: Cathy Weisshaupt
BLD-Framing/Rough-in6/20/20076/21/20076/21/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/20/2007 at 10:57:40 AM. Contact: ###-####.
BLD-Framing/Rough-in6/15/20076/18/20076/18/2007PPART
DetailsJim Storey
sunny ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need plm permit and patch rated cost. per note 7.
Issue PAID IN FULL permit  6/7/2007 DONE
Telephone call  2/13/2007 DONE
left mess for matt rhees at ###-#### that permit is ready
Plan assigned to (R_H)12/15/200612/15/200612/18/2006 PASS
12/18/2006 10:48:43 RMH - activity updated through activity BLDA022 from case BLD06-03540.
Routing - PLAN CHECK12/18/2006 12/18/2006 PASS
Routing - FIRE12/18/2006 12/18/2006 PASS
minor remodel / Field Verify
Case Summary (BLD)  12/18/2006 DONE
1st review completed  12/18/2006  
PLANS/APPL TAKEN TO FRONT DESK  12/18/2006 DONE
Print Occupancy Form  12/18/2006 DONE
Telephone call  12/18/2006  
tlk to matt rhees ###-#### that permit and fees are ready to be picked up but needs GC/RCE
Permit Ready to Issue  12/18/2006 DONE
Application received  12/15/2006  
Recd Pcfee & Taken To Pln CK  12/15/2006 DONE
Plans ACCEPTED BY PLAN TECH  12/15/2006