Permit Information
Permit NumberBLD06-03571
StatusFinaled
Name CREEKSIDE CUSTOM HOMES
Site Address 419 S 8TH ST Unit: 306
Project NameO W SMITH/R GREY BLDG
Customer Number 
ePlanReviewNo
Description
(SMITH/GREY BLDG - RESIDENTIAL STE 306) The fire sprinkler system substitutes for the 1-hr fire-resistance-rated construction of the building. To construct interior tenant improvements within a new 1,442 square foot dwelling unit located on the 3rd story of a new 3 story with basement building. Work is to include interior nonbearing walls, ceilings, millwork, and finishes. The 1-hr fire-resistance-rated corridor system and the 1-hr fire-resistance-rated dwelling unit separation walls were constructed under the shell permit (BLD06-00845). The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Prior to sale of this unit a condominium plat must be recorded. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/20/20095/21/20095/21/2009PPASS
DetailsDave Hannah
Marva- Phone #: ###-####
FIRE-Final Inspection5/20/20095/21/20095/21/2009APASS
DetailsForrest France
Fire life safety final status approved.
Permanent Occupancy  5/21/2009 DONE
DetailsAlexandra L. DeYoung
BLD-Final5/4/20095/5/20095/6/2009PNR
DetailsDave Hannah
marva Phone #: ###-####
FIRE-Final Inspection5/4/20095/5/20095/5/2009PPART
DetailsForrest France
Final pending completion of building shell permit correction notice items.
Case Summary (BLD)  12/19/2008  
BLD-Framing/Rough-in5/30/20076/1/20076/1/2007ACANC
DetailsDave Hannah
BLD06-03572 also Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in6/1/20076/1/20076/1/2007PPASS
DetailsDave Hannah
BLD06-03572 also Phone #: ###-#### Internet Inspection Request from: Alex Monge
BLD-Framing/Rough-in5/2/20075/2/20075/3/2007PCANC
DetailsDave Hannah
This is for shafts fireplace and mec ok to cover
Issue PAID IN FULL permit  4/20/2007 DONE
Telephone call  4/13/2007 DONE
t/c w amy hellmund at ###-#### - permit ready - will e-mail the fee amount (since there are 16 permits with the set of plans)
Permit Ready to Issue  4/13/2007 DONE
Print Occupancy Form  4/12/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/11/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/11/2007 DONE
Plan assigned to (CJW)12/22/2006 4/11/2007 PASS
4/11/2007 07:49:00 CJW - activity updated through activity BLDA022 from case BLD06-03571.
Routing - PLAN CHECK2/1/2007 4/10/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  3/14/2007  
received transmittal from doug cooper & "3" pages of letter from architecture & urban design & AO.1, A2.O,A2.1, A3.O, A3.1, A3.2, A3.3, A3.4, A3.5, A3.6, A3.7, A5.O, A5.1, A6.O, A6.1, A7.O, A7.1, A7.2, A7.3, A7.4, A7.5, A8.O, A8.1, M1.O, M1.1, M1.2, M1.3, M2.0, M2.1, M2.2, M2.3, M3.O, M4.O, M5.O, P1.O, P1.1, P1.2, P1.3, P2.O, P2.1, P2.2, P2.3, P3.O, E6.1, E6.2, E6.3, E6.4, E6.5, E6.6, E6.7, E6.8, E7.0--plans taken to Carl Westfall
Routing - FIRE1/30/2007 2/1/2007 PASS
Attached review comments to plans.
1st review completed  2/1/2007 FAIL
Routing - PLAN CHECK12/27/2006 1/30/2007 FAIL
The IBC plan review was started and finished on January 30, 2007. This tenant space is identical to Ste. 206 located directly below it. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS12/22/2006 12/27/2006 PASS
Routing - Addressing12/26/2006 12/26/2006 PASS
Pending Assignment by MYS12/20/2006 12/22/2006 DONE
12/22/2006 17:11:46 MYS - activity updated through activity BLDA172 from case BLD06-03571.
Plans ACCEPTED BY PLAN TECH  12/20/2006  
Recd Pcfee & Taken To Pln CK  12/20/2006 DONE
Application received  12/19/2006  
First Notice 5/21/2009