Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03574
StatusFinaled
Name JORDAN-WILCOMB CONST INC
Site Address 403 S 11TH ST Unit: 210
Project Name11th & Myrtle Prof Center
Customer Number 
ePlanReviewNo
Description
(BT MEDICAL OFFICE - 11TH & MYRTLE - 2ND FLR) To remodel a new 2,139 sq.ft. tenant space located on the 2nd floor for a new medical office per approved plans. Work to include, construction of interior partitions to create exam rooms, accessible restroom, accessible shower, breakroom, & reception area, installation of new suspended ceiling and related lighting, new HVAC system, related counters, cabinets and sinks, miscellaneous related interior finishes. This building is fully fire sprinkeled any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD7/23/20077/23/20072/27/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Telephone call  10/5/2007  
tlk to jordan wilcomb concerning the cov that have not been filled out since 7/23/2007 she asked me to fax the bld permit back bld06-03674/bld07-000436 to fill out 12:20 pm
Second Notice BLD7/12/20077/12/20077/23/2007 DONE
First Notice has not been responded to.
First Notice 6/28/20077/12/2007 DONE
Permanent occupancy UNPAID FEE  6/28/2007 DONE
Perm. Occ. Cert. # 11681 issued 6-28-07 to the BT Medical Office.
BLD-Final6/26/20076/27/20076/27/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/26/2007 at 3:15:50 PM. Contact: ###-####. ok for perm occ
FIRE-Final Inspection6/26/20076/27/20076/27/2007APASS
DetailsForrest France
Building final fire life safety inspection passed.
Permanent Occupancy 6/27/20076/27/2007 DONE
Details
BLD-Final6/25/20076/26/20076/26/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/25/2007 at 3:33:51 PM. Contact: ###-####.
FIRE-Final Inspection6/26/20076/26/20076/26/2007PNR
DetailsForrest France
Building life safety final pending project related fire sprinkler permit final, one emergency light has been repaired.
BLD-Final6/22/20076/25/20076/26/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/22/2007 at 2:07:19 PM. Contact: ###-####.
FIRE-Final Inspection6/22/20076/25/20076/25/2007AFAIL
DetailsForrest France
Need to repair one emergency light at the waiting area, one fire sprinkler head in a storage closet is cut in too high, need to have the project related fire alarm and fire sprinkler permits called in for final prior to life safety sign off, also need to post suite address numbers.
BLD-Other6/9/20076/11/20076/14/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/9/2007 at 11:39:02 AM. Contact: ###-####. ceiling grid need to finsih wireing lights and need to check door way framing
BLD-Energy code compliance4/18/20074/18/20074/18/2007PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/18/2007 at 9:27:05 AM. Contact: ###-####.
BLD-Framing/Rough-in4/13/20074/16/20074/17/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/13/2007 at 12:58:50 PM. Contact: ###-####.
Issue PAID IN FULL permit  3/26/2007  
Plan assigned to (R_H)12/22/2006 3/6/2007 PASS
3/6/2007 10:58:00 CMC - activity updated through activity BLDA022 from case BLD06-03574.
Routing - PLAN CHECK3/5/2007 3/6/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/6/2007  
Print Occupancy Form  3/6/2007  
CHANGE STATUS TO (RDY)  3/6/2007 DONE
Telephone call  3/6/2007 DONE
Called permit ready and fee given ///dld
Routing - PLUMBING3/2/2007 3/5/2007 PASS
ox lines are being piped to defusers not to wall outlets. ox concentrator is portable.
Routing - PLAN CHECK2/27/2007 3/2/2007 PEND
Routed plans back to Plumbing
Plan resubmittals received  3/1/2007  
Received 1 copy of cover transmital, 1 copy of Plumbing plan review, 3 copies of sheets- M-0, M-1, M-2, M-3, M-4, P-1, P-2, P-3 and taken to Ron Hill
1st review completed  2/16/2007 PASS
Routing - FIRE2/13/2007 2/16/2007 PASS
Attached IFC review comments to plans.
Case Summary (BLD)  2/13/2007 DONE
Routing - PLAN CHECK12/26/2006 2/13/2007 PEND
No corrections required by building department
Routing - PUBLIC WORKS12/22/2006 12/26/2006 PASS
Routing - Addressing12/26/2006 12/26/2006 PASS
Pending Assignment by MYS12/19/2006 12/22/2006 DONE
12/22/2006 12:17:12 MYS - activity updated through activity BLDA175 from case BLD06-03574.
Recd Pcfee & Taken To Pln CK  12/19/2006  
Plans ACCEPTED BY PLAN TECH  12/19/2006  
Application received  12/19/2006