Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03599
StatusFinaled
Name BOISE CITY BUILDING COMPANY
Site Address 961 W IOWA ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR DAVID HALE REGISTRATION NUMBER RCE-527" To construct a Six unit Townhome on zero lot lines. Unit 1 and Unit 6 are 1345 sq.ft. Two story Townhomes (823 sq.ft. First floors / 522 sq.ft. Second floors) with 41 sq.ft. Covered front porches, 37 sq.ft. Covered rear patios, and 220 sq.ft. Detached garages. Unit 2 thru 5 are 1390 sq.ft. Two story Townhomes (823 sq.ft. First floors / 567 sq.ft. Second floors) with 44 sq.ft. Covered front porches, 32 sq.ft. Covered rear patios, and 220 sq.ft. Detached garages. All work as per approved plans, all red-lining, Engineering and Plan review reports. THE CONSTRUCTION OF THE DWELLING UNIT SEPARATION WALLS ARE DESIGNED TO MEET TOWNHOUSE CONSTRUCTION. R-1MD zoning district, building setbacks, and DRH06-00141 per G.J. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/19/2013  
Letter of compliance  4/23/2009 DONE
CHANGE STATUS TO (FNL)  4/23/2009 DONE
BLD-Final8/29/20078/30/20078/30/2007APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: James MacIsaac-Ok for perm once everyone else finals
Temporary Occupancy8/29/200711/27/20078/29/2007 DONE
Code Occupancy Approval  8/29/2007 DONE
BLD-Conference6/20/20076/20/20076/20/2007PPART
DetailsJim Storey
review garage framing and firewall. Phone #: ###-#### Internet Inspection Request from: James MacIsaac fist layer ok for gyp assemblie.
BLD-Foundation6/6/20076/7/20076/7/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2007 at 10:33:01 PM. Contact: ###-####.
BLD-Footing6/5/20076/5/20076/5/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/5/2007 at 7:42:55 AM. Contact: ###-####.
BLD-Framing/Rough-in4/26/20074/27/20074/27/2007APASS
DetailsJim Storey
James; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in4/17/20074/18/20074/18/2007AFAIL
DetailsDave Hannah
james; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesc/n items rebuild stairs, fire blocking of fur downs, need arc to look at how they are insulating the roof/ceiling becouse of lack of ventalion , point loads at flooor line ok to insulate
BLD-Foundation2/26/20072/27/20072/27/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/26/2007 at 10:46:27 PM. Contact: ###-####.
BLD-Footing2/22/20072/23/20072/23/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 2/22/2007 at 8:38:30 PM. Contact: ###-####.
Telephone call  2/20/2007 DONE
t/c w andy peterson at ###-#### - permit ready and fees given
Permit Ready to Issue  2/20/2007  
Issue PAID IN FULL permit  2/20/2007 DONE
Inspection Record Card- Bld  2/16/2007 DONE
Plan assigned to (SRZ)2/14/20072/14/20072/14/2007 PASS
2/14/2007 15:35:33 SRZ - activity updated through activity BLDA022 from case BLD06-03599.
PLANS/APPL TAKEN TO FRONT DESK  2/14/2007 DONE
Pending Assignment by SRZ12/26/2006 2/14/2007 DONE
2/14/2007 09:35:22 SRZ - activity updated through activity BLDA160 from case BLD06-03599.
Routing - PLAN CHECK1/12/2007 2/14/2007 PASS
Telephone call  2/1/2007 DONE
left message.
Routing - PLANNING12/27/2006 1/12/2007 PASS
Approved per DRH06-00141
Routing - PUBLIC WORKS1/12/2007 1/12/2007 PASS
Routing - Addressing12/26/2006 12/27/2006 PASS
Application received  12/26/2006