BLD-Conference | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 9/24/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 9/21/2007 | 9/24/2007 | 9/24/2007 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/21/2007 at 3:45:58 PM. Contact: ###-####. issued c of o
|
BLD-Final | 9/20/2007 | 9/20/2007 | 9/20/2007 | P | NR |
Tony Young
|
|
|
Bob
|
BLD-Final | 9/19/2007 | 9/20/2007 | 9/20/2007 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/19/2007 at 2:16:49 PM. Contact: ###-####. c/n posted
|
BLD-Grading Inspection | 9/19/2007 | 9/19/2007 | 9/19/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Wall cover | 6/15/2007 | 6/18/2007 | 6/18/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/15/2007 at 12:52:22 PM. Contact: ###-####. insulation ok c/n items complted ok to cover
|
BLD-Wall cover | 6/14/2007 | 6/14/2007 | 6/14/2007 | P | NR |
Mike Jordan
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. wip on insul.
|
BLD-Wall cover | 6/14/2007 | 6/14/2007 | 6/14/2007 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/14/2007 at 7:14:35 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/7/2007 at 3:06:17 PM. Contact: ###-####. c/n on back of sign off sheet
|
BLD-Framing/Rough-in | 6/5/2007 | 6/5/2007 | 6/5/2007 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/5/2007 at 9:38:33 AM. Contact: ###-####. need mech 1st, conf walk through
|
BLD-Foundation | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | PART |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus wip
|
BLD-Footing | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PART |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ftg ok
|
PubWorks Subgrade Approval | 3/27/2007 | 3/27/2007 | 3/27/2007 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Footing | 3/26/2007 | 3/26/2007 | 3/26/2007 | P | NR |
Jim Sly
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|
Issue PAID IN FULL permit | | | 2/13/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 2/12/2007 | 2/12/2007 | 2/12/2007 | | PASS |
|
|
|
2/12/2007 14:35:53 SRZ - activity updated through activity BLDA022 from case BLD06-03631.
|
Case Summary (BLD) | | | 2/12/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/12/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2007 | | DONE |
|
|
|
called ###-#### and told Linda that permit is ready and fees $6,094.81, and this does not include sewer because not in our district
|
Pending Assignment by SRZ | 12/29/2006 | | 2/12/2007 | | DONE |
|
|
|
2/12/2007 14:09:26 SRZ - activity updated through activity BLDA160 from case BLD06-03631.
|
Routing - PLAN CHECK | 1/5/2007 | | 2/12/2007 | | PASS |
|
|
|
|
Telephone call | | | 2/12/2007 | | DONE |
|
|
|
Linda from Gabrielli Builds inquired to status of permit. Told her still with plan check and not know when will be ready, will tell plan reviewer she called.
|
Telephone call | | | 2/5/2007 | | DONE |
|
|
|
contractor called wanted to know status of permit, told her another 3-4 days per Sam Z.
|
Attached Document | | | 1/5/2007 | | |
|
|
|
scanned and attached application
|
Routing - FIRE | 1/4/2007 | | 1/5/2007 | | PASS |
|
|
|
No fire sprinklers are required (Highlands Hackberry Sub #4).
|
Routing - Erosion and Sediment | 1/3/2007 | | 1/4/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 1/3/2007 | | 1/3/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 1/3/2007 | | 1/3/2007 | | PASS |
|
|
|
Plat note #2 requires roof drain to be connected to the provided roof drain system of the subdivision.
|
Routing - PUBLIC WORKS | 1/3/2007 | | 1/3/2007 | | PASS |
|
|
|
Approved as Category 3
|
Application received | | | 12/29/2006 | | |
|
|
|
|
Routing - Addressing | 12/29/2006 | | 12/29/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 12/29/2006 | | | | |
|
|
|
Routed to T.R. Hillside 12/29
|