Permit Information
Permit NumberBLD07-00007
StatusFinaled
Name CM COMPANY
Site Address 3101 W CASSIA ST
Project NameSOUTH JUNIOR HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(SOUTH JUNIOR HIGH SCHOOL) To construct a 140, 546 sq. ft. two story fully fire sprinkled middle school building. Other work includes all site work, paving and landscaping per approved plans and attachements. Note: This project has phases which include demo of the existing school and a new ampitheater which will be done under separate permits. Fire sprinklers used for area. Building has 2 hour fire walls dividing the building into three separate buildings of Type IIA and IIB construction. Total area 1st floor 90,786 sq. ft. 2nd floor 49,760 sq. ft. 11-6-09 FINAL CERT OF VALUE PER GC $ 22,844,327.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/24/20098/5/2009 DONE
First Notice 4/22/20097/24/2009 DONE
Permanent Occupancy  4/22/2009 DONE
FIRE-Final Inspection4/15/20094/16/20094/16/2009APASS
DetailsForrest France
Project related fire permits finaled, fire life safety approved for final.
FIRE-Conference4/15/20094/15/20094/15/2009PDONE
DetailsForrest France
Regarding items needed for permit final.
BLD-Final4/14/20094/14/20094/14/2009PPASS
DetailsTom Arcoraci
bryan Phone #: ###-#### ok for perm
Zoning Approval4/7/20094/7/20094/7/2009 PASS
DetailsSue Cummings
OK to issue OC. 4/8/09 sac
BLD-Conference3/25/20093/25/20093/25/2009PPASS
DetailsTom Arcoraci
BLD-Aging Inspection3/25/20093/25/20093/25/2009 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in1/23/20091/23/20091/23/2009PCANC
DetailsTom Arcoraci
brian Phone #: ###-####
BLD-Conference12/23/200812/23/200812/23/2008PCANC
DetailsTom Arcoraci
Zoning Approval12/16/200812/16/200812/16/2008 FAIL
DetailsDavid Moser
Talked with Brian onsite at ###-#### and can not approve Final Occ. sign off until front amphitheater is complete as per CUP06-00080. PDS will sign off on the completed project to confirm it was built as planned. DEM
Permit EXTENDED  12/3/2008 DONE
DetailsBarbara Stitt
Extended permit per Jenifer Gilliland see attached document
BLD-Conference10/29/200810/29/200810/29/2008PDONE
DetailsDave Hannah
brian Phone #: ###-#### can not remove fire proofing from columns
BLD-Final10/14/200810/15/200810/15/2008PPART
DetailsDave Hannah
brian Phone #: ###-#### ok for temp occ on rest of school after all ext work is completed ok for perm occ
FIRE-Final Inspection10/14/200810/15/200810/14/2008APART
DetailsForrest France
All corrections made per last inspection. Could not final until fire alarm permit is finaled. KR
Reopen Permit (ISS)  10/14/2008 DONE
error on permit - was final by mistake
FIRE-Final Inspection10/10/200810/13/200810/13/2008AFAIL
DetailsForrest France
Project related fire alarm permit needs to pass final inspection prior to building life safety approval. Also noted 2 EM lights and one exit sign in need of repair, provide one fire extinguisher for the 2nd level prop storage area, missing drop ceilings at three vestibules, one missing sprinkler escutcheon at the south hall, noted two exit signs at the stage area above doors with locking hardware at the egress side.
BLD-Final10/10/200810/13/200810/13/2008PNR
DetailsDave Hannah
brian Phone #: ###-#### needs fire finals first
DOC - Permit Finaled10/13/200810/13/200810/13/2008PPASS
DetailsDave Hannah
BLD-Final8/20/20088/20/20088/20/2008PPART
DetailsJim Storey
greg Note: Phone #: ###-#### Please call to meet with fire guy forrest for inspection temp ok with fire dept agreements by d henaman for occ of all but adatorermam. si final report pending 1 idem from engineer of record.
Temporary Occupancy UNPAID FEE  8/20/2008 DONE
DetailsTisha Gallop
Print Occupancy Form  8/20/2008 DONE
DetailsTisha Gallop
FIRE-Final Inspection8/15/20088/15/20088/15/2008PPART
DetailsForrest France
See notice of violation for corrections made. KR
BLD-Final8/11/20088/11/20088/13/2008PPART
DetailsDave Hannah
brian Phone #: ###-#### ok to use to west side of bldg fire has oking fire watch exiting is all in place
FIRE-Final Inspection8/11/20088/11/20088/12/2008PPART
DetailsForrest France
Tested remainder of EM lighting and exit signs-noted two exit signs and two EM lights to be repaired, also noted exit discharge lights at three locations are not functional at areas E,F,&B. See 12 item correction notice left on site for a list of life safety issues to be completed prior to final occupancy approval. Also issued correction notices for fire alarm and sprinkler permits including 8 items for FA and 3 items for FS. Per agreement with the contractor and Deputy Chief D. Hanneman school registration may take place provided the fire watch for area "A" auditorium is maintained and limited access to the remainder of the building is provided.
BLD-Final8/8/20088/11/20088/11/2008APART
DetailsDave Hannah
brian Phone #: ###-#### stell need fires ok talked with tom A about project he has done several walks with brian most everything is in good shape
FIRE-Final Inspection8/7/20088/8/20088/8/2008PNR
DetailsForrest France
Project is not in condition for final life safety at this time due to construction/finish work in progress, area A is not complete, both elevators are not functional, kitchen hood is not ready for final inspection and testing, site work still underway, noted temporary address and max occupant load signs, tested exit signs and EM lights for areas B, C, and D first floor-noted five exit signs in need of repair. Hydrants, fire extinguishers, and door hardware appear acceptable for areas inspected to date. Discussed project schedule.
Code Occupancy Approval Temp8/6/20088/6/20088/6/2008PPASS
DetailsDena Gambrel
8-6-08 TEMPORARY OCCUPANCY ONLY. Bond was received for the parking lot and remaining landscaping.
Office Staff conference/action  8/5/2008 DONE
DetailsBarbara Stitt
Received performance bond (BND08-00070)
Code Occupancy Approval Temp8/4/20088/4/20088/4/2008PFAIL
DetailsDena Gambrel
8-1-08 Failed. Need to post bond for remaining landscaping in phase 1 and then bond for the parking lot and landscaping for phase 2. Correction notice issued.
BLD-Final7/31/20088/1/20088/1/2008PPART
DetailsTom Arcoraci
ok for staff to fit up class rooms admin cafe and gym pending ok from fire dept
BLD-Final7/31/20088/1/20088/1/2008APART
DetailsTom Arcoraci
looked at half of building minor discrepancy
BLD-Final7/31/20087/31/20087/31/2008PNR
DetailsTom Arcoraci
Brian Phone #: ###-#### discussed final insp issues
PubWorks Occupancy Approval8/4/20088/4/20087/31/2008 DONE
Signed off Phase 1 of project. R. Anderson
BLD-Wall cover7/16/20087/17/20087/17/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/16/2008 at 4:34:50 PM. Contact: ###-####.
BLD-Framing/Rough-in6/19/20086/19/20086/19/2008PPART
DetailsTony Young
bryan - ceiling cover Phone #: ###-####
classroom coridoors 1st and 2nd floor ok area H and D,, also music room ok
BLD-Other5/21/20085/22/20085/22/2008APASS
DetailsTom Arcoraci
brian Note: overhead for cover Phone #: ###-#### grid ok wip
BLD-Framing/Rough-in5/7/20085/8/20085/8/2008APART
DetailsTom Arcoraci
byran - overhead to cover Phone #: ###-#### wip ok
Received Certificate of Value  4/4/2008 DONE
DetailsTisha Gallop
4/4/08 - Revised cert of value to seperate the amphitheater into seperate permit Bld08-00229; new project value for this permit is $20,015,546; ele $2,319,659; plm w/mech; mech $2,939,068; fire sprinkler $313,893; fire alarm w/elec.//4/4/08 LEG
BLD-Framing/Rough-in2/15/20082/19/20082/19/2008APART
DetailsTom Arcoraci
byran Phone #: ###-#### wip ok
BLD-Framing/Rough-in1/28/20081/28/20081/28/2008PPART
DetailsTom Arcoraci
bryan Phone #: ###-#### wip ok
BLD-Aging Inspection1/16/20081/16/20081/16/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection11/15/200711/15/200711/15/2007 PASS
DetailsTom Arcoraci
wip ok spec insp on site
Second Notice BLD10/1/200710/1/200710/30/2007 DONE
First Notice has not been responded to.
First Notice9/13/20079/13/200710/1/2007 DONE
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  9/19/2007 DONE
tom arcoraci called - he doc finaled this permit by mistake
BLD-Foundation9/12/20079/13/20079/13/2007APASS
DetailsTom Arcoraci
bryan Phone #: ###-####
DOC - Permit Finaled9/13/20079/13/20079/13/2007PPASS
DetailsTom Arcoraci
BLD-Foundation9/6/20079/6/20079/7/2007PCANC
DetailsTom Arcoraci
BLD-Foundation9/5/20079/6/20079/6/2007APASS
DetailsTom Arcoraci
Brian; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Foundation8/27/20078/28/20078/28/2007APART
DetailsTom Arcoraci
bryan Phone #: ###-####
BLD-Other8/15/20078/16/20078/16/2007APASS
DetailsTom Arcoraci
bryan Note: concrete slap wire mess Phone #: ###-####
BLD-Footing8/10/20078/13/20078/13/2007APART
DetailsMike Jordan
brian Phone #: ###-####. Special insp.
BLD-Foundation8/3/20078/6/20078/6/2007APART
DetailsTom Arcoraci
Ryan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Other8/1/20078/2/20078/2/2007PPASS
DetailsTom Arcoraci
bryan Note: wire mess reinforcement for slap Phone #: ###-#### specc insp
BLD-Footing7/30/20077/31/20077/31/2007APART
DetailsTom Arcoraci
bryan Phone #: ###-#### spec insp
BLD-Foundation7/23/20077/24/20077/24/2007APASS
DetailsTom Arcoraci
bryan Phone #: ###-####
BLD-Foundation7/17/20077/18/20077/19/2007APART
DetailsTom Arcoraci
brian Phone #: ###-####
BLD-Footing7/10/20077/11/20077/11/2007APART
DetailsTom Arcoraci
brian Phone #: ###-####
BLD-Footing7/2/20077/3/20077/3/2007APASS
DetailsTom Arcoraci
brian - re-bar Phone #: ###-####
BLD-Footing6/26/20076/27/20076/28/2007PPART
DetailsTom Arcoraci
brian Note: rebar Phone #: ###-####
Plan resubmittals received  5/25/2007 DONE
received via fax 1 materials & testing inspection sheet put in Tom A. box///dld
(F) Reprint permit  5/16/2007  
Issue PAID IN FULL permit  5/14/2007 DONE
Print Occupancy Form  4/5/2007 DONE
CHANGE STATUS TO (RDY)  4/5/2007 DONE
Telephone call  4/5/2007 DONE
Called left message for Dennis permit ready and fee given , Also need ACHD ///DLD
Plan assigned to (MLO)1/4/20071/4/20074/4/2007 PASS
4/4/2007 10:34:41 MYS - activity updated through activity BLDA022 from case BLD07-00007.
PLANS/APPL TAKEN TO FRONT DESK  4/4/2007 DONE
Routing - PLAN CHECK3/22/2007 4/4/2007 PASS
Routing Off Site - STRUCTURAL3/26/2007 4/2/2007 PASS
Called Action Courier for pick up on 3/26/07 @ 2:57pm BAS
Telephone call  3/30/2007 DONE
called stapley eng. to check on status of resubs and not done as of 3/30.. MLO
Plan resubmittals received  3/26/2007 DONE
rec'd transmittal letter - (2)response to permit review - (2)structural calculations - 3 sets of sheet #s S1.1, S2.1B, S2.2G, S2.2H, S2.2J, S2.3G - taken to Mike Otto
Routing - PLANNING3/20/2007 3/22/2007 PASS
Goal post along the southern property line is required to be set back 10' for boundary as required by Boise City Parks and Recreation. Redlined on Sheet L-1.80 (Planting Plan)
Plan resubmittals requested  3/21/2007 DONE
structural corrections
Routing Off Site - STRUCTURAL3/14/2007 3/21/2007 FAIL
Called Action Courier for pick up on 3/14/07 @ 11:15am BAS corrections sent to architect
Routing - FIRE3/14/2007 3/19/2007 PASS
Attached updated review comments to plans.
Plan resubmittals received  3/19/2007 DONE
Received 1 transmittal letter,& 2 copys of sheets L1.10 taken to Mike Otto
Plan resubmittals requested  3/16/2007 PEND
Waiting for resubmitted site plan sheet showing approved fire department access roadways during constructions phases.
Routing - PLAN CHECK3/6/2007 3/14/2007 PASS
Plan resubmittals received  3/6/2007 DONE
Received 1 transmittal,3 response, 2 letters ,3 structural calcs,and 3 copys of sheets A2.01,A2..02,A2.1A,A2.1B,A2.2B,A6.1A,A2.1F,S1.0,S1.1,S2.1AS2.1E,S2.1F,S2.2C,S2.2H,S2.2J,S2.3H,S2.31,S2.3J,S3.3,S4.1,S4.2,S4.3,S5.1,S5.2,FP1.1,M1.2J,M1.1A,E2.16L,E2.11L, AND 5 COPYS OF SHEETS QT1.1A,QT4.1A,TA6.1 taken to Mike Otto
1st review completed  2/21/2007 FAIL
Failed plan check, planning and fire.
Routing - PLAN CHECK2/21/2007 2/21/2007  
Plan resubmittals received  2/21/2007 DONE
Recieved faxed document from Scott Henson regarding HMIS evaluation.
Routing - FIRE2/14/2007 2/21/2007 FAIL
Emailed fire code review resubmittal items to architect. Attached fire code review comments to plans.
Plan resubmittals requested  2/14/2007 DONE
IBC corrections
Routing Off Site - STRUCTURAL1/4/2007 2/14/2007 FAIL
Called Action Courier for pick up on 1/4/07 @ 1:40 BAS Corrections sent to architect
Routing - PLAN CHECK1/22/2007 2/14/2007 FAIL
corrections sent to architect.
Routing - PLANNING1/19/2007 1/22/2007 FAIL
CUP06-00080 Coddy Riddle

A CU Modification will be required for changes to the site/landscape plan. Faxed School District & Architect today.
Routing - PLUMBING1/11/2007 1/19/2007 PASS
civil needs to increase 4" roof drain line at grids 10/D to 6" per plumbing plans. address water services to future portables prior to final grading. 120 deg. max hot water to hand sinks in the kitchen. PVB required on the can wash.
Routing - Erosion and Sediment1/10/2007 1/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS1/5/2007 1/10/2007 PASS
Plan resubmittals received  1/9/2007  
Received cover transmittal and 1 copy of L1.10BP and taken to Mike Otto
Routing - PLANNING Land Div1/4/2007 1/5/2007 PASS
parcel larger than 5 acres
Plan routing begun/NEW & ADDTN  1/4/2007  
Plans ACCEPTED BY PLAN TECH  1/4/2007  
Application received  1/3/2007