Second Notice BLD | 1/9/2008 | 1/9/2008 | 1/15/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/30/2007 | 1/9/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/30/2007 | | |
|
|
|
|
BLD-Final | 11/27/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/27/2007 at 4:32:00 PM. Contact: ###-####.
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, c/n items are complete except approved door hardware at two locations (wash bay and SE mech. room) to be installed as discussed prior to structural final, also noted one exit sign to be removed at the east side of the truckers lounge.
|
PubWorks Occupancy Approval | 11/30/2007 | 11/30/2007 | 11/28/2007 | | DONE |
|
|
|
|
BLD-Conference | 11/27/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Jim Storey
|
|
|
greg Phone #: ###-####
|
FIRE-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | P | FAIL |
Forrest France
|
|
|
Need to provide approved door hardware at several locations, missing signage at the FACP room door, need to test EM lighting at next inspection.
|
BLD-Framing/Rough-in | 11/9/2007 | 11/13/2007 | 11/13/2007 | A | NH |
Jim Storey
|
|
|
greg Phone #: ###-#### need wire support on returns and supplys.
|
Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found that the landscaping has been completed according to approved City plans - PASS
|
BLD-Framing/Rough-in | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Jim Storey
|
|
|
greg Phone #: ###-#### fist floor framing ok
|
BLD-Framing/Rough-in | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PART |
Mike Jordan
|
|
|
greg Phone #: ###-####furouts on exterior walls only, minus plumbing wall, 1st and 2nd floors.
|
BLD-Footing | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PASS |
Jim Storey
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
Plan resubmittals received | | | 5/31/2007 | | |
|
|
|
Received 1 copy of sheet P2.0 and taken to plumbing's review box///5/31/07 @ 3:05 pm BAS
|
BLD-Footing | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Jim Storey
|
|
|
gregg ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Other | 5/14/2007 | 5/15/2007 | 5/15/2007 | A | PART |
Jim Storey
|
|
|
craig Note: rebar - 1st thing in morning; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesse ft
|
BLD-Footing | 5/10/2007 | 5/10/2007 | 5/11/2007 | P | FAIL |
Jim Sly
|
|
|
Greg; Phone #: ###-#### Internet Inspection Request from: Darla Downs NR........Walked job....pointed out discontinuous horiz. rebar and no pre-formed corners at perimeter footing.
|
BLD-Footing | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 5:12:23 PM. Contact: ###-####.
|
BLD-Footing | 4/30/2007 | 4/30/2007 | 4/30/2007 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 7:18:32 AM. Contact: ###-####.
|
BLD-Footing | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PART |
Jim Sly
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 80% interior footing pads OK........will pour others later. No special insp Req. Called Engineer.....2500 psi design (although not noted on appr plan). MTI approval on subgrade, at areas of Fill.
|
BLD-Footing | 4/20/2007 | 4/23/2007 | 4/23/2007 | A | CANC |
Jim Storey
|
|
|
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
(F) Reprint permit | | | 4/6/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/5/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
t/c w pete rockwell at ###-#### - permit ready and fees given - also needs gc name and rce#, rp, and take care of ACHD
|
Permit Ready to Issue | | | 3/29/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/28/2007 | | DONE |
|
|
|
|
Routing - FIRE | 3/27/2007 | | 3/28/2007 | | PASS |
|
|
|
Attached updated review comments to plans with HMIS. Emailed architect and owner current review comments.
|
Plan assigned to (MLO) | 1/4/2007 | | 3/28/2007 | | PASS |
|
|
|
3/28/2007 13:38:20 MLO - activity updated through activity BLDA022 from case BLD07-00017.
|
Routing - PLAN CHECK | 3/5/2007 | | 3/27/2007 | | PASS |
|
|
|
Plans held for modification request which was approved on 3/26/2007 by G. Slane, Building Official.
|
Plan resubmittals received | | | 3/22/2007 | | |
|
|
|
Received letter of transmittal, 1pg. response letter, and 2 copies of pages A-1.1, A-4.3; taken to Mike Otto
|
Plan resubmittals received | | | 3/21/2007 | | |
|
|
|
Received transmital letter and 2 copies of the following: E2.0F, E2.0L, E2.0MP, E2.0P, E2.0S; taken to Mike Otto
|
Routing Off Site - STRUCTURAL | 3/15/2007 | | 3/19/2007 | | PASS |
|
|
|
|
Telephone call | | | 3/13/2007 | | DONE |
|
|
|
Called Peter Rockwell 3/13/07 @ 9:56 and told him that we need a 3rd set of the sheets to be able to send out and that none of the ones that were brought in were stamped & signed so need new ones of those also///BAS
|
Plan resubmittals received | | | 3/13/2007 | | |
|
|
|
Received 2 copies of sheets CVR, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-4.1, A-4.2, A-4.3, A-5.1, 3 copies of sheets S-1.1, S-2.1, S-2.2, S-3.1, S-3.2, S-4.1, S-4.1A, S-4.2, S-5.1, S-6.1, S-6.2, S-7.3, S-7.4, S-7.5, 2 copies of sheets M1.1, PO.1, P1.1, P1.2, P3.0, E2.0L, E2.0MP, E2.0P, E2.0S And taken to Mike Otto
|
Plan resubmittals received | | | 3/5/2007 | | |
|
|
|
Received 1 cover transmittal, 1- 3 page plan review comments letter, 1-2 page sheet addressing the "lube pit" from Glancey-Rockwell, 1-1 page sheet from Pinnacle Engineers, 1-2 page sheets from ICC Bulletin Board, 1- (6 pages) addressing the proposed hazardous material storage, 3 copies of Calcs, 2 copies of sheets-CVR, A-1.1, A-1.2, A-1.3, A-2.1, A-3.1, A-3.2, A-3.3, A-4.1, A-4.2, A-4.3, A-5.1, S-1.1, S-2.1, S-2.2, S-3.1, S-3.2, S-4.1, S-4.1a, S-4.2, S-5.1, S-6.1, S-6.2, S-7.3, S-7.4, S-7.5, M1.1, P0.1, P1.1, P1.2, P3.0, E2.0L, E2.0MP, E2.0P, E2.0S and taken to Mike otto
|
1st review completed | | | 1/30/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 1/29/2007 | | 1/30/2007 | | FAIL |
|
|
|
Emailed architect resubmittal items. Attached review comments to plans.
|
Routing Off Site - STRUCTURAL | 1/4/2007 | | 1/29/2007 | | FAIL |
|
|
|
corrections sent to architect.
|
Routing - PLAN CHECK | 1/22/2007 | | 1/29/2007 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 1/29/2007 | | DONE |
|
|
|
IBC corrections
|
Plan resubmittals received | | | 1/24/2007 | | |
|
|
|
Received 1 cover transmittal, 3 copies of sheets C3.0 and taken to Mike Otto
|
Routing - PLANNING | 1/18/2007 | | 1/19/2007 | | PASS |
|
|
|
Approved per DRH06-00087 Greg Johnson
|
Routing - PLUMBING | | | 1/18/2007 | | PASS |
|
|
|
USE boise city approved flammable liquids interceptor detail- attached. r.p. required on the 1 1/2" water line to the shop water. 120 deg. max. hot water to public lavs. shock absorbers required for flushometer valves.
|
Routing - Erosion and Sediment | 1/11/2007 | | 1/11/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 1/5/2007 | | 1/11/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/5/2007 | | 1/5/2007 | | PASS |
|
|
|
Parcel greater than 5 acres in size
|
(F) Reprint permit | | | 1/5/2007 | | DONE |
|
|
|
|
Application received | | | 1/4/2007 | | |
|
|
|
|
Pending Assignment by MYS | 1/4/2007 | | 1/4/2007 | | DONE |
|
|
|
1/4/2007 13:41:58 JCM - activity updated through activity BLDA174 from case BLD07-00017.
|
Telephone call | | | 1/4/2007 | | DONE |
|
|
|
called Action Couriers for pick up and deliver to AHJ Engineers
|
Plans ACCEPTED BY PLAN TECH | | | 1/4/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/4/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 3/28/2007 | | | | |
|
|
|
|