Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-00018
StatusFinaled
Name CAMCO CONSTRUCTION INC
Site Address 356 N MILWAUKEE ST
Project NameTALBOTS BTS
Customer Number 
ePlanReviewNo
Description
(TALBOTS RETAIL STORE AT BOISE TOWNE SQUARE - SHELL ONLY) - To construct a new 3,900 square foot, one story, steel framed, retail shell building addition to the south side of the Towne Square Mall between Macy's retail and the Old Chicago restaurant. This building is not attached to the mall, but is considered an addition for unlimited area considerations of the mall. This is a shell permit only and no occupancy is allowed under this permit. A separate tenant improvement permit will be required to finish this building for occupancy. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/200712/21/2007 DONE
Second Notice has not been responded to.
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice10/10/200710/10/200711/13/2007 DONE
DetailsMike Jordan
BLD-Final10/10/200710/10/200710/10/2007PPASS
DetailsMike Jordan
DOC - Permit Finaled10/10/200710/10/200710/10/2007PPASS
DetailsMike Jordan
Received Final Aff. letter from Camco. Letter of Completion issued.
BLD-Final10/8/200710/9/200710/9/2007PPART
DetailsMike Jordan
kent Phone #: ###-####. Everything ok, requested final aff. letter from special insp. agency from Camco. Once letter is recieved and no issues noted, will issue letter of completion.
FIRE-Final Inspection10/8/200710/9/200710/9/2007APASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final10/5/200710/8/200710/8/2007PNR
DetailsMike Jordan
Kent Phone #: ###-####
FIRE-Final Inspection10/5/200710/8/200710/8/2007AFAIL
DetailsTroy Cobbley
No approved plans on site.
BLD-Final10/5/200710/5/200710/5/2007PCANC
DetailsJim Storey
kent - around 4:00 if possib le Phone #: ###-#### no insp.
BLD-Final9/17/20079/18/20079/18/2007ANR
DetailsMike Jordan
kent Phone #: ###-####. Needs fir/life/safety.
Code Occupancy Approval9/11/20079/11/20079/12/2007PPASS
DetailsScott M.Brown
SHELL ONLY OK, TENANT MAKEING CHANGES TO OUT SIDE, I NEED TO VERIFY.
BLD-Final7/30/20078/1/20078/1/2007ANR
DetailsMike Jordan
kent Phone #: ###-####. Spoke to contractor, needs other trades finaled.
BLD-Final7/26/20077/26/20077/26/2007PNR
DetailsTom Arcoraci
kent Phone #: ###-#### no acess no ans 0n phone
BLD-Framing/Rough-in5/24/20075/25/20075/25/2007APASS
DetailsMike Jordan
ken; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Store front framing ok. EIFS work has begun. Noted to contractor that I need the approved submittals for the EIFS system.
BLD-Framing/Rough-in5/9/20075/11/20075/11/2007PPASS
DetailsMike Jordan
kent ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Exterior steel stud walls. Also reviewed special insp. reports.
BLD-Footing3/27/20073/28/20073/28/2007PPART
DetailsMike Jordan
kent; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. wip on perimeter footings. Special insp. will take place.
(F) Reprint permit  3/5/2007  
Issue PAID IN FULL permit  3/2/2007 DONE
Inspection Record Card- Bld  3/1/2007 DONE
Telephone call  3/1/2007 DONE
t/c w kent at ###-#### - permit ready and fees given
Permit Ready to Issue  3/1/2007  
Telephone call  2/23/2007 DONE
left vm for steven yearsley at ###-#### to call back regarding the ACHD plans
Telephone call  2/23/2007 DONE
t/c w steven yearsley - he got the plans to ada county and is waiting the for impact fees
Telephone call  2/15/2007 DONE
called Steven yearsley at ###-#### to discuss the ACHD plans and he is out of the office till monday - called nan at ACHD ###-#### - she said they needed the plans - called the architect david hoffman at ###-#### -he is out of the office so i left a voice message for him to return my call - 2/15/07 ps
Telephone call  2/15/2007 DONE
spoke with cameron treat at camco construction ###-#### - he gave me the revised cert of value numbers and said that he knew nothing about the ACHD issue - said to call steven yearsley
///2/14/07ps
Routing - PLAN CHECK1/24/2007 2/14/2007 PASS
Plan Reviewer's activity  2/14/2007 PASS
Reviewed and approved structural and nonstructural revisions. JCM
PLANS/APPL TAKEN TO FRONT DESK  2/14/2007 DONE
Plan assigned to (JCM)1/8/2007 2/14/2007 PASS
2/14/2007 11:25:23 JCM - activity updated through activity BLDA022 from case BLD07-00018.
Plan resubmittals received  2/12/2007  
Received 1 plan review response (3pgs), 3 copies of e-mail regarding piping materials, 1 copy of project start up special inspections, 1 copy of materials testing & inspection-geotech report, 3 copies of joist loading information sheets (J1-J17), 3 copies of parpapet return calcs (D10-D16), 3 copies of partial plumbing plan sheet (P3), 3 copies S2, 3 copies of A1 and taken to John Menard
Routing - FIRE1/22/2007 1/24/2007 PASS
Attached review comments to plans.
Plan resubmittals requested  1/24/2007 DONE
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
1st review completed  1/24/2007 FAIL
Failed structural.
Routing Off Site - STRUCTURAL1/8/2007 1/23/2007 FAIL
Called Action Courier for pick up @ 8:55am on 1/8/07 BAS - Received comment letter from the consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK1/22/2007 1/22/2007 FAIL
John Menard
Routing - PLANNING1/19/2007 1/22/2007 PASS
Approved per CUP04-00090 and DRH04-00219 Mods 1-3
Routing - PLUMBING1/11/2007 1/19/2007 PASS
verify that existing services under building have been upgraded to materials approved with in a building.
Plan resubmittals requested  1/12/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - Erosion and Sediment1/10/2007 1/11/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS1/8/2007 1/10/2007 PASS
Routing - PLANNING Land Div1/8/2007 1/8/2007 PASS
Parcel larger than 5 acres
Plans ACCEPTED BY PLAN TECH  1/8/2007  
Plan routing begun/NEW & ADDTN  1/8/2007  
Recd Pcfee & Taken To Pln CK  1/5/2007 DONE
Application received  1/4/2007