Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00047
StatusFinaled
Name THE CHRISTENSEN CORP
Site Address 950 W BANNOCK ST Unit: 400
Project Name10TH & BANNOCK
Customer Number 
ePlanReviewNo
Description
(IDAHO POWER COMPANY - BANNER BANK BLDG - SUITE 400) This building is fire sprinklered because it is a high-rise. To construct a 13,884 square foot whole floor office tenant space on the 4th story of a high-rise building. Five area were considered separately for the application of egress requirements. Work is to include interior Nordwall demountable nonbearing partitions, doors, sidelights, millwork, finishes, 1-hr corridor walls, and smoke- and draft-control doors in 1-hr corridor walls. Additional work, including the installation and structural support of heavy equipment, will be done under a future permit. The access floor system, the suspended ceilings, and most of the 1-hr fire-resistance-rated corridors were installed under permit BLD05-02939. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice BLD10/30/200710/30/20071/18/2008 DONE
DetailsRita DeYoung
Second Notice has not been responded to.
Second Notice BLD10/1/200710/1/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/18/200710/1/2007 DONE
Permanent Occupancy  9/18/2007 DONE
FIRE-Final Inspection8/6/20078/6/20078/6/2007PPASS
DetailsForrest France
Required corrections are complete, fire life safety passed final inspection.
FIRE-Final Inspection8/1/20078/2/20078/2/2007PFAIL
DetailsForrest France
Missing handle at one PFE cabinet, door hardware needs repair at the exit from the server room-is not operable at this time.
BLD-Final7/25/20077/25/20077/31/2007PNR
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang needs other trades to sign off
BLD-Final5/9/20075/10/20075/10/2007PPASS
DetailsDave Hannah
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for btemp occ ok for perm after fire oks for perm and ele
FIRE-Final Inspection5/4/20075/7/20075/7/2007APART
DetailsForrest France
Final pending project related FA monitoring for the clean agent suppression system in the data room, noted missing handle at one PFE cabinet in the west hallway, emergency lights/exit signs tested okay.
BLD-Framing/Rough-in3/22/20073/26/20073/26/2007APASS
DetailsDave Hannah
mario; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover walls
BLD-Framing/Rough-in2/8/20072/8/20072/8/2007PPART
DetailsDave Hannah
mario; Phone #: ###-#### Internet Inspection Request from: Victoria Beall framing around doors in corr
Issue PAID IN FULL permit  2/7/2007 DONE
Routing - PLAN CHECK2/5/2007 2/6/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/6/2007 DONE
Print Occupancy Form  2/6/2007 DONE
CHANGE STATUS TO (RDY)  2/6/2007 DONE
Telephone call  2/6/2007 DONE
Called Gary left message permit ready and fee given ///DLD
Plan assigned to (CJW)1/12/2007 2/6/2007 PASS
2/6/2007 11:16:52 CJW - activity updated through activity BLDA022 from case BLD07-00047.
Routing - PLAN CHECK1/16/2007 2/5/2007 PASS
The IBC plan review was started on February 2, 2007 and was finished on February 5, 2007. The drawings were approved with the attached plan review report. See the plan review report.
Routing - FIRE2/5/2007 2/5/2007 PASS
Attached review comments to plans.
1st review completed  2/5/2007 PASS
Routing - PUBLIC WORKS1/12/2007 1/16/2007 PASS
Pending Assignment by MYS1/5/2007 1/12/2007 DONE
1/12/2007 12:04:36 MYS - activity updated through activity BLDA172 from case BLD07-00047.
Plans ACCEPTED BY PLAN TECH  1/8/2007  
Application received  1/5/2007  
Recd Pcfee & Taken To Pln CK  1/5/2007