DOC - Permit Expired | 4/19/2011 | 4/19/2011 | 4/19/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/18/2011 | 4/18/2011 | 4/19/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 1/7/2011 | 1/7/2011 | 1/13/2011 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/12/2008 | 2/12/2008 | 2/15/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety passed.
|
BLD-Final | 2/12/2008 | 2/12/2008 | 2/13/2008 | P | PART |
Dave Hannah
|
|
|
walt Phone #: ###-#### ok to occ. two offices on east side of project still working on rest of project
|
FIRE-Final Inspection | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | PART |
Forrest France
|
|
|
Missing one exit sign at the north exit stairway door- see approved plans for annotations regarding location, also need to final aging fire alarm pemit for elevator recall prior to final occupancy approval.
|
FIRE-Final Inspection | 2/7/2008 | 2/7/2008 | 2/7/2008 | A | PART |
Kenneth R Roule
|
|
|
When testing fire alarm, permit# FIR08-00046. Found that doors to elevator lobbys when released upon a fire alarm did not close correctly. Also found an aging permit #FIR03-00788 has not been finaled. This permit is for elevator recall, in duct detection with dampers and heat detection in elevator room. This building permit can't be finaled until FIR03-00788 is finaled do to life safety.Also found many sprinkler heads on 2nd floor covered with tape due to painting.Tape will also have to be removed before final inspection.
|
BLD-Framing/Rough-in | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | PART |
Dave Hannah
|
|
|
walt Phone #: ###-####ok to cover walls on to west side of hall
|
FIRE-Final Inspection | 12/17/2007 | 12/18/2007 | 12/18/2007 | A | FAIL |
Forrest France
|
|
|
A fire alarm permit will be required for alteration and extension of the existing building FA system to include notification within this tenant remodel-see fire code review comments and notes attatched to the approved plan set, also noted the scope of work as indicated is not complete- missing walls, doors and finishes at several locations particularly on the west side of the corridor.
|
BLD-Final | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | FAIL |
Dave Hannah
|
|
|
Walt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire inspections and install glass
|
BLD-Framing/Rough-in | 11/15/2007 | 11/15/2007 | 11/16/2007 | P | PART |
Dave Hannah
|
|
|
walt Phone #: ###-#### ok to cover walls on east side of project
|
BLD-Framing/Rough-in | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | FAIL |
Dave Hannah
|
|
|
walt Phone #: ###-#### no city set of plans on site
|
(F) Reprint permit | | | 11/14/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/6/2007 | 11/6/2007 | 11/9/2007 | | PASS |
|
|
|
11/9/2007 13:50:21 CJW - activity updated through activity BLDA022 from case BLD07-00052.
|
Routing - PLAN CHECK | 11/6/2007 | | 11/9/2007 | | PASS |
|
|
|
Finished the review of the plan modification. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2007 | | DONE |
|
|
|
called ###-#### and told Kasey that permit is ready and fee
|
Permit Ready to Issue | | | 11/9/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2007 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/6/2007 | | |
|
|
|
Plan modification accepted for Bld07-00052 to expose exterior wall to see brick veneer, exposing beams in celings, install sound barrier on floor and widening existing hallway. Submitted on page A2.1 and CCD no.1; routed to Carl Westfall
|
BLD-Aging Inspection | 9/6/2007 | 9/6/2007 | 9/10/2007 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 6/7/2007 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 6/7/2007 | | |
|
|
|
re-issued on 11/13/07 by mistake
|
Telephone call | | | 6/4/2007 | | DONE |
|
|
|
left mess w kasey lindsay at ###-#### -that permit is ready
|
Telephone call | | | 2/22/2007 | | DONE |
|
|
|
t/c w kasey lindsay at ###-#### - told him the permit was ready - he said to call nathan combs at CSHQA -###-#### - left vm for nathan re: permit ready and fees given - also told him we needed the name of the GC and the RCE#
|
Permit Ready to Issue | | | 2/22/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/21/2007 | | DONE |
|
|
|
lft vm with jim murray ###-#### for the general contractor and final value 11:35 pm
|
Print Occupancy Form | | | 2/21/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/12/2007 | | 2/21/2007 | | PASS |
|
|
|
2/21/2007 12:03:13 CJW - activity updated through activity BLDA022 from case BLD07-00052.
|
Routing - PLAN CHECK | 2/13/2007 | | 2/21/2007 | | PASS |
|
|
|
The drawings were approved after the resubmittal review.
|
Plan resubmittals received | | | 2/13/2007 | | |
|
|
|
Received transmittal sheet, 2pg. response letter, and two copies of the following pages: A0.1, A2.1, A5.1, E1.0; taken to Carl Westfall
|
Routing - FIRE | 2/7/2007 | | 2/13/2007 | | PASS |
|
|
|
Attached review comment to plans.
|
1st review completed | | | 2/13/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 1/16/2007 | | 2/7/2007 | | FAIL |
|
|
|
The IBC plan review was started on February 6, 2007 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 1/12/2007 | | 1/16/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 1/8/2007 | | 1/12/2007 | | DONE |
|
|
|
1/12/2007 12:28:08 MYS - activity updated through activity BLDA172 from case BLD07-00052.
|
Application received | | | 1/8/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/8/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2007 | | |
|
|
|
|