To construct a 3,956 sq. ft., two story, wood frame, four unit apartment building. Each unit is 943 sq. ft. with two bedrooms and two bathrooms. all fout units exit into a 1-hour vertical exit stair enclosure required to have protected door openings consisting of a 60 minute listed, labeled, self-closing, temperature rated door assembly serving as the required single exit from each unit. One hour fire-resistive construction is required between the dwelling units, vertically and horizontally. The bottom two units of the four-plex are required to comply as 'Type B" accessible dwelling units. All construction shall comply with the approved plans, red-lined notes on plans, engineering, all attached plan reviews of all reviewing agencies and all currently adopted codes and ordinances of Boise City applicable to this project. drs CUP05-00162.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/200812/22/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD9/22/20089/22/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 8/14/20089/22/2008 DONE
Permanent Occupancy  8/14/2008 DONE
DetailsBarbara Stitt
Code Occupancy Approval8/12/20088/12/20088/12/2008PPASS
DetailsCarol Montgomery
O.K. all done
BLD-Aging Inspection7/2/20087/2/20087/9/2008 PASS
DetailsCarol Montgomery
BLD-Aging Inspection1/10/20081/10/20081/10/2008 PASS
DetailsCarol Montgomery
Code Occupancy Approval8/31/20078/31/20078/31/2007PFAIL
DetailsCarol Montgomery
Signed temporary. Bond is in place
Temporary Occupancy8/31/200711/29/20078/31/2007 DONE
FIRE-Final Inspection8/30/20078/30/20078/30/2007PPASS
DetailsForrest France
Fire life safety inspection completed acceptable at structural final per T. Arcoraci.
BLD-Final8/30/20078/30/20078/30/2007PPASS
DetailsTom Arcoraci
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
FIRE-Final Inspection8/29/20078/29/20078/29/2007PCANC
DetailsTroy Cobbley
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
BLD-Energy code compliance6/28/20076/29/20076/29/2007APASS
DetailsTom Arcoraci
jeff Phone #: ###-####
BLD-Framing/Rough-in6/26/20076/26/20076/26/2007PPASS
DetailsTom Arcoraci
jeff Phone #: ###-####
BLD-Framing/Rough-in6/19/20076/20/20076/20/2007ANR
DetailsTom Arcoraci
jeff; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Aging Inspection6/4/20076/4/20076/4/2007 PASS
DetailsTom Arcoraci
wip ok
BLD-Final3/27/20073/28/20073/28/2007PCANC
DetailsTom Arcoraci
Walt; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Foundation3/25/20073/26/20073/26/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/25/2007 at 7:04:37 PM. Contact: ###-####.
BLD-Footing3/22/20073/22/20073/22/2007PPASS
DetailsTom Arcoraci
logan - off hartman and franklin ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Issue PAID IN FULL permit  3/20/2007 DONE
Routing - PLAN CHECK3/13/2007 3/16/2007 PASS
Plan resubmittals inserted into plans, red-lined notes added to plans, modified plan review conditions, assembled all attachment data of all reviews and attached to plans. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  3/16/2007 PASS
Print Occupancy Form  3/16/2007 DONE
Telephone call  3/16/2007 DONE
called Jeff from Nemec ###-#### and told him fees, also faxed breakdown of fees to ###-#### per Jeff's request
Permit Ready to Issue  3/16/2007 DONE
Plan assigned to (DRS)3/1/2007 3/16/2007 PASS
3/16/2007 08:37:02 DRS - activity updated through activity BLDA022 from case BLD07-00057.
Plan resubmittals received  3/15/2007  
Received 2 copies of the following pages: A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, D-1; taken to Dan Stuart
1st review completed  3/13/2007 FAIL
Routing - FIRE3/8/2007 3/13/2007 PASS
Attacehd review comments to plans.
Plan resubmittals requested  3/8/2007 DONE
E-mail of code items needing to be addressed on plans sent to designer and contractor.
Print Pending Permit.LaserJet4  3/8/2007  
Case Summary (BLD)  3/8/2007  
Routing - PLAN CHECK2/23/2007 3/8/2007 FAIL
Plan review e-mailed to designer and owner.
Routing - PLAN CHECK1/30/2007 3/1/2007 PEND
Mike Phillips gave plans to Dan S.
Plan assigned to (M_P)1/8/2007 3/1/2007 ----
Reassigned to Dan Stuart by M. Southard
Routing - PLANNING2/23/2007 2/23/2007 PASS
Okay per CUP. Routed to Andrea on 2/23
DRH06-00514-Andrea - Okay per DR. Routed back to plan check on 2-23-07.
Plan resubmittals received  1/30/2007  
rec'd copy of conditional use letter (CUP05-00162) - 3 sets of sheet #L1.0 - taken to Andrea Tuning
Routing - PLANNING1/29/2007 1/30/2007 FAIL
cup05-00162 Cody R.-Failed to comply with the conditions of approval. Faxed applicant list of changes, and routed plans to A. Tuning for Design Review approval.
DRH06-00514 - Failed to comply with landscape requirements. Landscpae plan that was submitted with building plans does not match the approved landscape plan to include evergreens and
Routing - PLUMBING1/22/2007 1/29/2007 PASS
Routing - Erosion and Sediment1/18/2007 1/22/2007 PASS
1/22/07 Refer to ESC06-00666 as master ESC plan for project.adh.
Routing - PUBLIC WORKS1/16/2007 1/18/2007 PASS
Routing - PLANNING Land Div1/8/2007 1/16/2007 PASS
Recd Pcfee & Taken To Pln CK  1/8/2007  
Plan routing begun/NEW & ADDTN  1/8/2007  
Application received  1/8/2007  
Plans ACCEPTED BY PLAN TECH  1/8/2007