Routing - PLAN CHECK | 2/23/2007 | | 3/8/2009 | | FAIL |
Dan Stuart
|
|
|
Resubmittals required. Copy of plan review e-mailed to designer and owner. Routing to fire code analyst for review.
|
Temporary occupancy UNPAID FEE | | | 7/20/2007 | | DONE |
|
|
|
|
BLD-Final | 7/18/2007 | 7/19/2007 | 7/19/2007 | P | PASS |
Tom Arcoraci
|
|
|
jeff Phone #: ###-####
|
Code Occupancy Approval Temp | 7/19/2007 | 7/19/2007 | 7/19/2007 | P | PASS |
Scott M.Brown
|
|
|
temp only needs sod
|
FIRE-Final Inspection | 7/17/2007 | 7/18/2007 | 7/18/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | FAIL |
Troy Cobbley
|
|
|
Items on the previous correction notice have not been addressed.
|
BLD-Final | 7/13/2007 | 7/16/2007 | 7/16/2007 | P | NR |
Tom Arcoraci
|
|
|
jeff Phone #: ###-####
|
FIRE-Final Inspection | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
The automatic closures for the doors have not been set up yet. Need to verify that the new fire hydrant has been turned on. Smoke detectors have been tested. Apartment 101 had to have all of the detectors changed out while we waited.
|
FIRE-Final Inspection | 7/12/2007 | 7/13/2007 | 7/13/2007 | P | CANC |
Troy Cobbley
|
|
|
Canceled per jeff Phone #: ###-####
|
BLD-Framing/Rough-in | 5/25/2007 | 5/29/2007 | 5/29/2007 | A | PART |
Mike Jordan
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All items on c/n repaired. will call in when envelope is complete.
|
BLD-Other | 5/21/2007 | 5/22/2007 | 5/22/2007 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | FAIL |
Tom Arcoraci
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh
|
BLD-Framing/Rough-in | 5/16/2007 | 5/17/2007 | 5/17/2007 | A | PART |
Jim Sly
|
|
|
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Ok to insulate..........Check firestopping, 1hr to roof deck, and tub drain at 1hr floor/ceiling.
|
BLD-Conference | 4/23/2007 | 4/24/2007 | 4/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 4/18/2007 | 4/19/2007 | 4/18/2007 | A | PASS |
Tom Arcoraci
|
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 3/25/2007 | 3/26/2007 | 3/26/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/25/2007 at 7:06:20 PM. Contact: ###-####.
|
BLD-Footing | 3/22/2007 | 3/22/2007 | 3/22/2007 | P | PASS |
Tom Arcoraci
|
|
|
logan - off hartman and franklin ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Issue PAID IN FULL permit | | | 3/20/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/13/2007 | | 3/16/2007 | | PASS |
|
|
|
Plan resubs inserted into plans, all documents attached to plans, plans red-lined for clarification, modified plan review conditions and took to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/16/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 3/16/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/16/2007 | | DONE |
|
|
|
called Jeff from Nemec ###-#### and told him fees, also faxed breakdown of fees to ###-#### per Jeff's request
|
Permit Ready to Issue | | | 3/16/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 3/1/2007 | | 3/16/2007 | | PASS |
|
|
|
3/16/2007 08:47:49 DRS - activity updated through activity BLDA022 from case BLD07-00059.
|
Plan resubmittals received | | | 3/15/2007 | | |
|
|
|
Received 2 copies of the following pages: A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, D-1; taken to Dan Stuart
|
1st review completed | | | 3/13/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 3/8/2007 | | 3/13/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals requested | | | 3/8/2007 | | DONE |
|
|
|
Plan review e-mailed to designer and owner.
|
Print Pending Permit.LaserJet4 | | | 3/8/2007 | | |
|
|
|
|
Plan assigned to (M_P) | 1/8/2007 | | 3/1/2007 | | ---- |
|
|
|
Reassigned to Dan Stuart by M. Southard
|
Routing - PLAN CHECK | 1/30/2007 | | 2/23/2007 | | PEND |
|
|
|
rerouted to Planning
|
Routing - PLANNING | 2/23/2007 | | 2/23/2007 | | PASS |
|
|
|
Okay per CUP. Routed to Andrea on 2/23
DRH06-00514-Andrea - Okay per DR. Routed back to plan check on 2-23-07.
|
Plan resubmittals received | | | 1/30/2007 | | |
|
|
|
rec'd copy of conditional use letter (CUP05-00162) - 3 sets of sheet #L1.0 - taken to Andrea Tuning
|
Routing - PLANNING | 1/29/2007 | | 1/30/2007 | | FAIL |
|
|
|
cup05-00162 Cody R.-Failed to comply with the conditions of approval. Faxed applicant list of changes, and routed plans to A. Tuning for Design Review approval.
DRH06-00514 - Failed to comply with landscape requirements. Landscpae plan that was submitted with building plans does not match the approved landscape plan to include evergreens and
|
Routing - PLUMBING | 1/22/2007 | | 1/29/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 1/18/2007 | | 1/22/2007 | | PASS |
|
|
|
1/22/07 Refer to ESC06-00666 as master ESC plan for project.adh.
|
Routing - PUBLIC WORKS | 1/16/2007 | | 1/18/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 1/8/2007 | | 1/16/2007 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 1/8/2007 | | |
|
|
|
|
Application received | | | 1/8/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/8/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/8/2007 | | DONE |
|
|
|
|