Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00059
StatusFinaled
Name CLOVERDALE DEVELOPMENT LLC
Site Address 6253 W TIERRA LANE
Project NameSIGNATURE SQUARE #2
Customer Number 
ePlanReviewNo
Description
To construct a 3,956 sq. ft., two story, wood frame, four unit apartment building. Each unit has 943 sq. ft. with two bedrooms and bathrooms. All four units exit into a one hour vertical exit enclosure requirered to have door opening protection of 60 minute fire-resistive, listed label, self0closing, temperature rated door assembly serving as the required single exit for the units. The bottom two units of the apartment are required to comply as 'Type B' accessible dwelling units. all construction shall comply with the approved plans, red-lined notes on plans, engineering, all atached plan reviews of all reviewing agencies and all currently adopted codes and ordinances of Boise City as applicable to this project.drs CUP05-00162
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLAN CHECK2/23/2007 3/8/2009 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plan review e-mailed to designer and owner. Routing to fire code analyst for review.
Temporary occupancy UNPAID FEE  7/20/2007 DONE
BLD-Final7/18/20077/19/20077/19/2007PPASS
DetailsTom Arcoraci
jeff Phone #: ###-####
Code Occupancy Approval Temp7/19/20077/19/20077/19/2007PPASS
DetailsScott M.Brown
temp only needs sod
FIRE-Final Inspection7/17/20077/18/20077/18/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection7/16/20077/17/20077/17/2007AFAIL
DetailsTroy Cobbley
Items on the previous correction notice have not been addressed.
BLD-Final7/13/20077/16/20077/16/2007PNR
DetailsTom Arcoraci
jeff Phone #: ###-####
FIRE-Final Inspection7/13/20077/16/20077/16/2007AFAIL
DetailsTroy Cobbley
The automatic closures for the doors have not been set up yet. Need to verify that the new fire hydrant has been turned on. Smoke detectors have been tested. Apartment 101 had to have all of the detectors changed out while we waited.
FIRE-Final Inspection7/12/20077/13/20077/13/2007PCANC
DetailsTroy Cobbley
Canceled per jeff Phone #: ###-####
BLD-Framing/Rough-in5/25/20075/29/20075/29/2007APART
DetailsMike Jordan
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All items on c/n repaired. will call in when envelope is complete.
BLD-Other5/21/20075/22/20075/22/2007APASS
DetailsTom Arcoraci
BLD-Energy code compliance5/21/20075/21/20075/21/2007PFAIL
DetailsTom Arcoraci
jeff; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh
BLD-Framing/Rough-in5/16/20075/17/20075/17/2007APART
DetailsJim Sly
jeff ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Ok to insulate..........Check firestopping, 1hr to roof deck, and tub drain at 1hr floor/ceiling.
BLD-Conference4/23/20074/24/20074/24/2007APASS
DetailsTom Arcoraci
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other4/18/20074/19/20074/18/2007APASS
DetailsTom Arcoraci
jeff; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation3/25/20073/26/20073/26/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/25/2007 at 7:06:20 PM. Contact: ###-####.
BLD-Footing3/22/20073/22/20073/22/2007PPASS
DetailsTom Arcoraci
logan - off hartman and franklin ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Issue PAID IN FULL permit  3/20/2007 DONE
Routing - PLAN CHECK3/13/2007 3/16/2007 PASS
Plan resubs inserted into plans, all documents attached to plans, plans red-lined for clarification, modified plan review conditions and took to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  3/16/2007 PASS
Print Occupancy Form  3/16/2007 DONE
Telephone call  3/16/2007 DONE
called Jeff from Nemec ###-#### and told him fees, also faxed breakdown of fees to ###-#### per Jeff's request
Permit Ready to Issue  3/16/2007 DONE
Plan assigned to (DRS)3/1/2007 3/16/2007 PASS
3/16/2007 08:47:49 DRS - activity updated through activity BLDA022 from case BLD07-00059.
Plan resubmittals received  3/15/2007  
Received 2 copies of the following pages: A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, D-1; taken to Dan Stuart
1st review completed  3/13/2007 FAIL
Routing - FIRE3/8/2007 3/13/2007 PASS
Attached review comments to plans.
Plan resubmittals requested  3/8/2007 DONE
Plan review e-mailed to designer and owner.
Print Pending Permit.LaserJet4  3/8/2007  
Plan assigned to (M_P)1/8/2007 3/1/2007 ----
Reassigned to Dan Stuart by M. Southard
Routing - PLAN CHECK1/30/2007 2/23/2007 PEND
rerouted to Planning
Routing - PLANNING2/23/2007 2/23/2007 PASS
Okay per CUP. Routed to Andrea on 2/23
DRH06-00514-Andrea - Okay per DR. Routed back to plan check on 2-23-07.
Plan resubmittals received  1/30/2007  
rec'd copy of conditional use letter (CUP05-00162) - 3 sets of sheet #L1.0 - taken to Andrea Tuning
Routing - PLANNING1/29/2007 1/30/2007 FAIL
cup05-00162 Cody R.-Failed to comply with the conditions of approval. Faxed applicant list of changes, and routed plans to A. Tuning for Design Review approval.
DRH06-00514 - Failed to comply with landscape requirements. Landscpae plan that was submitted with building plans does not match the approved landscape plan to include evergreens and
Routing - PLUMBING1/22/2007 1/29/2007 PASS
Routing - Erosion and Sediment1/18/2007 1/22/2007 PASS
1/22/07 Refer to ESC06-00666 as master ESC plan for project.adh.
Routing - PUBLIC WORKS1/16/2007 1/18/2007 PASS
Routing - PLANNING Land Div1/8/2007 1/16/2007 PASS
Plan routing begun/NEW & ADDTN  1/8/2007  
Application received  1/8/2007  
Plans ACCEPTED BY PLAN TECH  1/8/2007  
Recd Pcfee & Taken To Pln CK  1/8/2007 DONE