Permit Information
Permit NumberBLD07-00142
StatusFinaled
Name CAFCO INC
Site Address 4162 W QUAIL HILL CT
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 12,372 sq.ft. Two story with Basement single family dwelling (5,863 sq.ft. First floor / 2,185 sq.ft. Second floor / 4,324 sq.ft. Basement floor) with a 165 sq.ft. Covered front porch, and a 2,331 sq.ft. Two car/Four car tandem garages per approved plans, all red-lining, Engineering, and Plan review report. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. This house requires a modified NFPA 13D sprinkler system. In addition to the requirements of 13D, a single row of dry sidewall sprinklers shall be installed in all attached garages along the walls common to the garage and the living space, spaced sideways according to their listing requirements. (QUAIL RIDGE SUB NO 09) A Fire Sprinkler Permit is required prior to beginning any fire sprinkler work. R-1C zoning district, building setbacks, CFH06-52, and Not approved for ADU per Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/30/2018 DONE
Case Summary (BLD)  7/30/2018 DONE
Case Summary (BLD)  8/22/2016 DONE
PubWorks Occupancy Approval6/10/20136/10/20136/10/2013 DONE
DetailsJason C. Taylor
Site stabilization, grading, drainage, driveway (pavers), and roof gutters have been installed and to the original project specifications. Bonds can be relased for PW. Jason Taylor ###-####.
BLD-Final4/9/20104/12/20104/12/2010APASS
DetailsTony Young
BLD-Final4/9/20104/9/20104/9/2010PDONE
DetailsTony Young
BLD-Final4/2/20104/7/20104/9/2010PPASS
DetailsTony Young
ok to occupy inside of house,, exterior stairs blocked off
DOC - Permit Finaled4/9/20104/9/20104/9/2010PPASS
DetailsTony Young
c of c issued
BLD-Conference4/1/20104/2/20104/2/2010APART
DetailsTony Young
talked with Darrin,, said he is not ready yet.. should be by next Wednesday,, 4/7/2010.. homeowners rep called me asking about project..
BLD-Conference3/26/20103/31/20104/1/2010ADEFR
DetailsDave Hannah
t/w Darrin
BLD-Conference3/29/20103/29/20103/29/2010AFAIL
DetailsTony Young
Complaint that people are living in the home with it not being completed by neighbors-could you please check into this--
talked with Darrin,, said he should get final in a week,, waiting on railing,, I will recheck on Wednesday,, reminded him that he does not have an occupancy to stay in house
BLD-Conference3/19/20103/19/20103/26/2010PNH
DetailsTony Young
t/w Darrin
BLD-Final2/16/20103/10/20103/19/2010ANR
DetailsTony Young
t/w Darrin
BLD-Conference2/15/20102/16/20102/16/2010APART
DetailsTony Young
t/w Darrin
will be ready in a month or so,,
BLD-Final2/9/20102/11/20102/16/2010ANR
DetailsTony Young
call Darrin 1st
BLD-Aging Inspection2/3/20102/4/20102/9/2010APEND
DetailsTony Young
BLD-Aging Inspection12/15/200912/15/200912/16/2009 PEND
DetailsTony Young
BLD-Final2/2/20092/3/20092/3/2009ANR
DetailsTony Young
Darrin; Phone #: ###-####
walk through w/ Darrin on final issues
BLD-Final1/30/20091/30/20092/2/2009PNH
DetailsTony Young
Darrin
BLD-Final1/2/20091/6/20091/7/2009ANR
DetailsTony Young
Darrin ###-####
conf on final
BLD-Final12/26/200812/31/20081/6/2009ACANC
DetailsTony Young
Bill Phone #: ###-####
BLD-Final12/24/200812/26/200812/26/2008PCANC
DetailsTony Young
Bill Phone #: ###-####
resched
BLD-Conference12/23/200812/23/200812/26/2008PNH
DetailsTony Young
Bill Phone #: ###-####
BLD-Conference12/23/200812/24/200812/24/2008ANH
DetailsTony Young
Bill Phone #: ###-####
BLD-Conference12/12/200812/16/200812/23/2008APART
DetailsTony Young
Bill Phone #: ###-####
final issues ?s
BLD-Final12/10/200812/11/200812/15/2008PCANC
DetailsTony Young
Bill Phone #: ###-####
BLD-Final12/12/200812/12/200812/12/2008PPART
DetailsTony Young
Bill Phone #: ###-####
conf walk through on final,, gave paperwork for bank
BLD-Grading Inspection12/12/200812/12/200812/12/2008PDONE
DetailsTerry Records
The rough grading and drainage has been completed at the above mentioned address. However, fine grading, revegetation, completion of the roof drain system, paving of the driveway, and reconstruction of an erosion gully on the north side of the lot have not been completed. For this the engineer has recommended a bond of $38,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
Inspection Record Card- Bld  12/9/2008 DONE
BLD-Conference11/18/200811/18/200811/19/2008PPART
DetailsTony Young
per Eric 3 pm Please
walk through,, lots of issues remain to be able to obtain a final,, if applicant needs to go back to plan review and rivise plans or resubmit to finish parts of house later he has that option,, however to get a final the way the house is now, all trades need to be finaled out as well as the hillside ordinance issues,, then all building code issues need to be met throughout the home and the scope of the work on the review set of plans
(F) Reprint permit  5/29/2008 DONE
(F) Reprint permit  5/27/2008 DONE
BLD-Conference4/7/20084/7/20084/7/2008PPART
DetailsTony Young
josh Phone #: ###-####
stair ?s
BLD-Conference3/31/20084/2/20084/2/2008PPASS
DetailsJim Storey
josh Phone #: ###-####
stairs
BLD-Conference3/31/20083/31/20083/31/2008PPART
DetailsTony Young
josh Phone #: ###-####
stair ?s
BLD-Conference3/28/20083/28/20083/28/2008PPASS
DetailsTony Young
reg Phone #: ###-####
on final
BLD-Final3/19/20083/20/20083/20/2008ANR
DetailsTony Young
bill Phone #: ###-####
phone conf only,, need all trades and hillside 1st
BLD-Framing/Rough-in11/8/200711/9/200711/9/2007PPART
DetailsTony Young
richard - ok to cover Phone #: ###-####
ok to cover areas not affected by engineers "fix list"
BLD-Framing/Rough-in10/29/200710/29/200710/30/2007PPART
DetailsTony Young
richard Phone #: ###-####
ok to insulate,, still need letter of ok from engineer
BLD-Conference10/16/200710/17/200710/17/2007APART
DetailsTony Young
richard Phone #: ###-####general frame conf,, still need structural engineer to look at job and ok all engineering
Case Summary (BLD)  10/10/2007 DONE
BLD-Other9/24/20079/25/20079/25/2007APART
DetailsTony Young
redge Note: shear Phone #: ###-####
exterior ok,, need to get letter from structural eng on hold downs,, about a 100 or so
BLD-Conference8/23/20078/24/20078/24/2007APART
DetailsTony Young
Phone #: ###-####
general frame conf..,, need approval from B.O. or plan review for stairs as built
BLD-Conference8/23/20078/23/20078/24/2007PCANC
DetailsTony Young
Darren, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
out of time
Case Summary (BLD)  8/24/2007  
BLD-Footing4/25/20074/26/20074/26/2007PPART
DetailsJim Sly
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Footings for N. 1/2 of house appears OK.
PubWorks Subgrade Approval4/25/20074/25/20074/25/2007 DONE
Upper level footings have been approved by the geotechnical engineer
BLD-Footing3/29/20073/30/20073/30/2007APART
DetailsTony Young
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
front house ftgs ok
PubWorks Subgrade Approval3/30/20073/30/20073/30/2007 DONE
footing subgrade approved by geotechnical engineer
BLD-Foundation3/20/20073/21/20073/21/2007APART
DetailsTony Young
Don; Phone #: ###-####
rear basement wall, wip
BLD-Other3/19/20073/20/20073/20/2007PCANC
DetailsTony Young
Don ###-#### //rebar inspection
out of time
CHANGE STATUS TO (ISS)  3/19/2007 DONE
chnged status back to ISS from REC per activity on 3/15/07 (application received) changed status to REC
PubWorks Subgrade Approval3/15/20073/15/20073/15/2007 PART
A portion of the basement footings was approved by the geotechnical engineer.
BLD-Footing3/13/20073/14/20073/14/2007APART
DetailsTony Young
don - around 10 am if possible; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
basement wall/retaining wall ftgs,, wip, pending soil report,, ok per T. R.
BLD-Footing3/12/20073/13/20073/13/2007AFAIL
DetailsTony Young
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
need soils report 1st
Issue PAID IN FULL permit  2/13/2007 DONE
Inspection Record Card- Bld  2/12/2007 DONE
Telephone call  2/12/2007 DONE
t/c w bill at ###-#### - permit ready and fees given
Permit Ready to Issue  2/12/2007  
Plan assigned to (SRZ)2/9/20072/9/20072/9/2007 PASS
2/9/2007 14:15:54 SRZ - activity updated through activity BLDA022 from case BLD07-00142.
Case Summary (BLD)  2/9/2007  
PLANS/APPL TAKEN TO FRONT DESK  2/9/2007 DONE
One set Approved
Pending Assignment by SRZ1/17/2007 2/9/2007 DONE
2/9/2007 08:01:57 SRZ - activity updated through activity BLDA160 from case BLD07-00142.
Routing - Erosion and Sediment1/19/2007 1/22/2007 PASS
ESC plan approved with attached conditions.
Routing - FIRE1/22/2007 1/22/2007 PASS
This house requires a modified NFPA 13D sprinkler system. In addition to the requirements of 13D, a single row of dry sidewall sprinklers shall be installed in all attached garages along the walls common to the garage and the living space, spaced sideways according to their listing requirements. (QUAIL RIDGE SUB NO 09)
Routing - PLANNING1/17/2007 1/19/2007 PASS
Routed to Cody CFH06-00052 1/17/07. Cody asked Sue to review. 10 day appeal period ended 1/19. Site plan O.K.
Routing - Addressing1/17/2007 1/17/2007 PASS
Routing - PUBLIC WORKS1/17/2007 1/17/2007 PASS
Routing - PUBLIC WORKS GRADING1/17/2007 1/17/2007 PASS
Adpproved as Category 1 by CFH06-00052
Application received  1/17/2007  
BLD-Final2/3/20092/11/2009 A 
DetailsTony Young
Darrin; Phone #: ###-####
BLD-Final1/7/20091/21/2009 A 
DetailsTony Young
Darrin ###-####
Routing - PLANNING1/17/2007    
Routed to Terry Records
Routing - PLAN CHECK1/22/2007