Permit Information
Permit NumberBLD07-00155
StatusFinaled
Name BANK OF THE WEST
Site Address 827 W IDAHO ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(Bank of The West)**(Broadbent Building First floor)* To remodel an existing 1020 sq ft tenant space located on the first floor for a new bank tenant per approved plans. This space was originally created under BLD06-02515 and is being finished for occupancy under this permit. Work to include, installation of teller counter and office cubicles, installation of ATM and Night drop safe, structural reinforcement of the floor were night drop safe is located per attached engineering, installation of suspended ceiling system with related lighting, HVAC system, breakroom counter and sink, drinking fountain and janitors sink, miscellaneous related finishes. Exterior awnings and ATM to be installed per DRH06-00498. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/9/20075/9/20075/10/2007 DONE
Second Notice has not been responded to.
Second Notice BLD4/27/20074/27/20075/9/2007 DONE
First Notice has not been responded to.
First Notice 4/16/20074/27/2007 DONE
Permanent Occupancy 4/16/20074/16/2007 DONE
Details
Permanent occupancy  4/16/2007 DONE
Perm. Occ. Cert. # 11529 issued 4-16-07 to Bank of the West.
BLD-Final3/28/20073/29/20073/29/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 3/28/2007 at 9:56:46 AM. Contact: ###-####. ok for temp occ ok for perm occ after elec gos perm
Temporary occupancy  3/29/2007 DONE
Temp. Occ. Cert. # 5562 issued 3-29-07 to Bank of the West.
FIRE-Final Inspection3/26/20073/27/20073/27/2007APASS
DetailsForrest France
Fire life safety is acceptable, one emergency light above the teller desk to be repaired today per contractor.
BLD-Framing/Rough-in3/12/20073/13/20073/13/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/12/2007 at 7:07:55 AM. Contact: ###-####.
BLD-Framing/Rough-in2/20/20072/21/20072/21/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/20/2007 at 10:29:16 AM. Contact: ###-####. ok to cover
Plan resubmittals received  2/15/2007  
Received transmittal letter and one copy of page A1.1 and A8.1; taken to Ron Hill
Issue PAID IN FULL permit  2/5/2007 DONE
Print Occupancy Form  1/23/2007 DONE
Telephone call  1/23/2007 DONE
tlk doug watson ###-#### that permit and fees are ready to be picked up but needs GC/RCE
Permit Ready to Issue  1/23/2007 DONE
Plan assigned to (R_H)1/18/20071/18/20071/22/2007 PASS
1/22/2007 13:56:28 RMH - activity updated through activity BLDA022 from case BLD07-00155.
Case Summary (BLD)  1/22/2007 DONE
Routing - PLAN CHECK1/22/2007 1/22/2007 PASS
Routing - PUBLIC WORKS1/22/2007 1/22/2007 PASS
Routing - FIRE1/22/2007 1/22/2007 PASS
Minor remodel / Field Verify
1st review completed  1/22/2007  
PLANS/APPL TAKEN TO FRONT DESK  1/22/2007 DONE
Application received  1/18/2007  
Pending Assignment by MYS1/18/2007 1/18/2007 DONE
1/18/2007 14:12:18 MLS - activity updated through activity BLDA175 from case BLD07-00155.
Override - Parcel Holds  1/18/2007  
Recd Pcfee & Taken To Pln CK  1/18/2007  
Plans ACCEPTED BY PLAN TECH  1/18/2007