DOC - Permit Expired | 4/15/2010 | 4/15/2010 | 4/15/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 7/17/2007 | 7/17/2007 | 7/18/2007 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 4/17/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 1/30/2007 | | 4/5/2007 | | PASS |
|
|
|
4/5/2007 09:52:52 DRS - activity updated through activity BLDA022 from case BLD07-00177.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2007 | | PASS |
|
|
|
Approved as noted on plans and attached plan review submittals.
|
Override - Parcel Holds | | | 4/5/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/5/2007 | | DONE |
|
|
|
override per dan stuart
|
Telephone call | | | 4/5/2007 | | DONE |
|
|
|
left vm for john price at ###-#### - permit ready and fees given - also need gc name and rce#
|
Override - Parcel Holds | | | 4/5/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 4/5/2007 | | DONE |
|
|
|
override okay per dan stuart
|
Routing - PLAN CHECK | 2/22/2007 | | 4/4/2007 | | PASS |
|
|
|
Inserted resubmittals into plans.
|
Override - Parcel Holds | | | 4/4/2007 | | |
|
|
|
|
Plan resubmittals received | | | 4/3/2007 | | DONE |
|
|
|
Received 1 response,2 structural calcs,2 project start up for special inspections,and 2 copys of sheets A0.0,A2.1,A6.0,A10.0 taken to Dan S.
|
Telephone call | | | 3/21/2007 | | DONE |
|
|
|
Call from Scott, Treasure Valley Engineering, concerning the structural review questions I raised in plan review for this project. He said they are changing the adhesive anchors for compliant type for masonry. We discussed concerns about loads (lateral and vertical) and transfer there of if the new openable window wall is installed, removing what little support there is. He will review the situation and provide design calcs and details. The existing footing situation is not know and He may have to submit as deferred item for engineering until the demo is done and the footing/foundation is exposed.
|
1st review completed | | | 2/22/2007 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 2/16/2007 | | 2/22/2007 | | PASS |
|
|
|
Attached IFC Review comments to plans.
|
Plan resubmittals requested | | | 2/16/2007 | | DONE |
|
|
|
E-mailed plan review report with items needing a response for correction or clarification to John Price.
|
Routing - PLAN CHECK | 2/8/2007 | | 2/16/2007 | | FAIL |
|
|
|
Resubmittals required. Plan review comments e-mailed to John Price, architect. Rout8ing to fire code analyst for review.
|
Routing - PLANNING | 1/30/2007 | | 2/8/2007 | | PASS |
|
|
|
Julie Archambeault DRH06-00159
|
Pending Assignment by MYS | 1/24/2007 | | 1/30/2007 | | DONE |
|
|
|
1/30/2007 12:21:26 MYS - activity updated through activity BLDA168 from case BLD07-00177.
|
Plans ACCEPTED BY PLAN TECH | | | 1/24/2007 | | |
|
|
|
|
Application received | | | 1/22/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/22/2007 | | DONE |
|
|
|
|