Routing - PLAN CHECK | 3/16/2007 | | 4/11/2009 | | PASS |
Dan Stuart
|
|
|
Plan resubmittals inserted into plans, engineering reviewed, new plans reviewed, red-line notes transfered or added, modified original plan review to reflect resubmittal response from architect. Routing plans to permit desk to issue..
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/7/2008 | 2/6/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | 1/7/2008 | 1/7/2008 | 1/7/2008 | P | PASS |
Joe R Venneman
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 1/7/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 1/7/2008 | | DONE |
|
|
|
|
BLD-Final | 1/4/2008 | 1/7/2008 | 1/4/2008 | A | PASS |
Dave Hannah
|
|
|
greg Phone #: ###-#### ok for perm occ
|
FIRE-Final Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PASS |
Forrest France
|
|
|
C/N items are completed, life safety inspection passed.
|
FIRE-Final Inspection | 1/3/2008 | 1/3/2008 | 1/3/2008 | A | FAIL |
Forrest France
|
|
|
C/N items are not yet completed.
|
FIRE-Final Inspection | 1/2/2008 | 1/2/2008 | 1/2/2008 | P | NR |
Forrest France
|
|
|
Pending completion of hardware issues.
|
FIRE-Final Inspection | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | FAIL |
Forrest France
|
|
|
Provide approved hardware at two locations on the first floor, one additional PFE is needed for the basement level-see fire code review notes, also need verification regarding number of exits required which will determine EM lighting.
|
BLD-Other | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
greg - handicap ramp rail Phone #: ###-####
|
PubWorks Occupancy Approval | 11/19/2007 | 11/19/2007 | 11/16/2007 | | DONE |
|
|
|
Received engineer required letter, signed off project Dan Erskine.
|
BLD-Footing | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PASS |
Dave Hannah
|
|
|
greg - exterior basement wall Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PASS |
Dave Hannah
|
|
|
reinspect; Greg; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover insulation also ok
|
BLD-Footing | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PART |
Dave Hannah
|
|
|
gregg - and beams - please call 45 min prior to inspection Phone #: ###-####
|
BLD-Framing/Rough-in | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PART |
Dave Hannah
|
|
|
gregg - and beams - please call 45 min prior to inspection Phone #: ###-#### ok to cover int walls ok to insulate ext walls
|
BLD-Aging Inspection | 7/13/2007 | 7/13/2007 | 7/13/2007 | | PASS |
Dave Hannah
|
|
|
|
Issue PAID IN FULL permit | | | 4/12/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 4/11/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/11/2007 | | DONE |
|
|
|
left vm for bradley marczuk at ###-#### - permit ready and fees given - also need gc name and rce# and ACHD
|
Permit Ready to Issue | | | 4/11/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 2/1/2007 | | 4/11/2007 | | PASS |
|
|
|
4/11/2007 09:27:24 DRS - activity updated through activity BLDA022 from case BLD07-00222.
|
Plan resubmittals received | | | 4/9/2007 | | |
|
|
|
Received 3pg. response letter, application for Project Start Up for Special Inspections, 3 copies of structural calculations, and 3 copies of the following pages: G1.0, G1.1, A1, A2, A3, A4, A5, E-1, S0.1, S1.1, S1.3; taken to Dan Stuart
|
1st review completed | | | 3/16/2007 | | FAIL |
|
|
|
Failed plan check and planning.
|
Routing - FIRE | 3/13/2007 | | 3/16/2007 | | PASS |
|
|
|
Attached IFC review comments to plans. Plans approved with red annotations.
|
Telephone call | | | 3/15/2007 | | DONE |
|
|
|
Call from Brad Marczuk, architect. They are hiring Pinnacle Engineering to provide structural analysis for building. The balcony is being removed from project and door at the accessible landing will reversed to swing in and the radiator relocated to provide latch side clearance at door. Door to basement stairs to be modified such that hallway is not reduced to less than 18" when door open to 90 degrees. Said it would probably be 2 weeks before resubmittals are turned in.
|
Plan resubmittals requested | | | 3/13/2007 | | DONE |
|
|
|
Copy of plan review e-mailed to architect.
|
Routing - PLAN CHECK | 2/9/2007 | | 3/13/2007 | | FAIL |
|
|
|
Resubmittals required. Copy of plan review e-mailed to architect. Routing plans to fire code analyst for review.
|
Routing - PLANNING | 2/22/2007 | | 2/22/2007 | | PASS |
|
|
|
Approved per DRH06-00482
|
Routing - Erosion and Sediment | 2/8/2007 | | 2/9/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 2/9/2007 | | 2/9/2007 | | FAIL |
|
|
|
Applicant must submit revised site and landscaping plans, a list of work to be done on the residential unit, and a joint use agreement to Design Review staff prior to approval of building permit.
Angela Wood CUP06-00095
Greg Johnson DRH06-00482
|
Routing - PUBLIC WORKS | 2/1/2007 | | 2/8/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 1/29/2007 | | 2/1/2007 | | DONE |
|
|
|
2/1/2007 17:04:02 MYS - activity updated through activity BLDA168 from case BLD07-00222.
|
Telephone call | | | 1/29/2007 | | DONE |
|
|
|
called Greg Contos and left voicemessage, called Brad Marczuk and told him will need to break out into two bld permit perm two addressses. Brad said work only done on 206 Jefferson, had to submit with both addresses because the parking lot covers both. 208 Jefferson will be done at phase II. I told him I will speak with plan review if ok.//per Marlene S. ok to submit/LEG
|
Recd Pcfee & Taken To Pln CK | | | 1/29/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/29/2007 | | |
|
|
|
|
Application received | | | 1/26/2007 | | |
|
|
|
|