Zoning Approval Temp | 6/14/2010 | 6/14/2010 | 6/14/2010 | | DONE |
Andrea Tuning
|
|
|
The applicant has been granted a 90 temorary occupancy in order to alllow them to open at this time. A final occupancy will be issued once the applicant has installed the two street lights on 14th Street, the parking lot is adequately striped and the lawn has been reestablished, mowed and weed free.
|
BLD-Conference | 11/15/2007 | 11/16/2007 | 11/16/2007 | A | PASS |
Dave Hannah
|
|
|
ricard Phone #: ###-#### meet at 10
|
DOC - Permit Finaled | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
ricard Phone #: ###-#### meet at 10
|
BLD-Final | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | FAIL |
Dave Hannah
|
|
|
ricard Phone #: ###-#### ext handrail not to code
|
BLD-Final | 11/13/2007 | 11/13/2007 | 11/14/2007 | P | FAIL |
Dave Hannah
|
|
|
ricard - please call 1/2 hr prior to inspection Phone #: ###-#### need ladders in window wells and gaurd and hand rail on front stairs
|
BLD-Grading Inspection | 11/13/2007 | 11/13/2007 | 11/13/2007 | A | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Final | 11/8/2007 | 11/9/2007 | 11/9/2007 | A | NR |
Dave Hannah
|
|
|
Rickard, please call 20 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs hillside final
|
BLD-Energy code compliance | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Dave Hannah
|
|
|
ricard; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
BLD-Framing/Rough-in | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Dave Hannah
|
|
|
ricardo Note: framing/shear Phone #: ###-#### shear ok ok to cover int and ext
|
BLD-Energy code compliance | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Dave Hannah
|
|
|
ricardo Note: framing/shear Phone #: ###-####
|
BLD-Other | 7/16/2007 | 7/16/2007 | 7/16/2007 | A | PART |
Dave Hannah
|
|
|
ricardo Note: shear Phone #: ###-#### needs to add holddowns refasten add fl to fl strapes and block edges most framing c/n items compltete ok to insulate
|
BLD-Framing/Rough-in | 7/11/2007 | 7/12/2007 | 7/12/2007 | P | FAIL |
Tony Young
|
|
|
RICARD Phone #: ###-#### 2 page c/n,, lots of items
|
BLD-Framing/Rough-in | 7/10/2007 | 7/10/2007 | 7/11/2007 | P | FAIL |
Dave Hannah
|
|
|
ricard; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang no plans no truss engineering didnt have seal package need shear
|
BLD-Foundation | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PASS |
Dave Hannah
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PASS |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 5/8/2007 | 5/9/2007 | 5/9/2007 | P | CANC |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 5/7/2007 | 5/8/2007 | 5/8/2007 | A | CANC |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Foundation | 4/5/2007 | 4/5/2007 | 4/5/2007 | P | PASS |
Dave Hannah
|
|
|
Pat; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Footing | 3/29/2007 | 3/30/2007 | 3/30/2007 | A | PASS |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
PubWorks Subgrade Approval | 3/30/2007 | 3/30/2007 | 3/30/2007 | | DONE |
|
|
|
footing subgrade approved by the geotechnical engineer
|
Inspection Record Card- Bld | | | 3/7/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2007 | | DONE |
|
|
|
t/c w ricard peterson ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/7/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/7/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 3/2/2007 | 3/2/2007 | 3/2/2007 | | PASS |
|
|
|
3/2/2007 15:55:25 SRZ - activity updated through activity BLDA022 from case BLD07-00257.
|
Case Summary (BLD) | | | 3/2/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2007 | | DONE |
|
|
|
|
Pending Assignment by SRZ | 3/2/2007 | | 3/2/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/6/2007 | | 3/2/2007 | | PASS |
|
|
|
|
Telephone call | | | 2/16/2007 | | DONE |
|
|
|
I called applicant back and gave a Plan review finish time frame to him. March 7th. (SRZ)
|
Routing - FIRE | 2/1/2007 | | 2/6/2007 | | PASS |
|
|
|
No fire sprinklers required (Northridge Sub # 5)
|
Routing - Erosion and Sediment | | | 2/1/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 1/31/2007 | | 1/31/2007 | | PASS |
|
|
|
Approved as Category 1 by CFH07-00001(Josh Johnson)
|
Routing - Addressing | 1/30/2007 | | 1/31/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 1/31/2007 | | 1/31/2007 | | PASS |
|
|
|
Routed to Erosion and Sediment Control
|
Routing - PUBLIC WORKS | 1/31/2007 | | 1/31/2007 | | PASS |
|
|
|
|
Application received | | | 1/30/2007 | | |
|
|
|
|