Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00274
StatusFinaled
Name M J HARRIS
Site Address 6651 W FRANKLIN RD
Project NameSW ID Advanced Care Hospital
Customer Number 
ePlanReviewNo
Description
(SOUTHWEST IDAHO ADVANCED CARE HOSPITAL) To construct a new 50,275 square foot, two story, steel framed advanced care hospital building and related site improvements. This building will contain administrative offices, a therapy gym, dining room, commercial kitchen and ambulance drive-thru on the first floor. The second floor contains forty patient rooms, a pharmacy, day room, staff break room and storage areas. First Floor: 29,425 sq. ft., Second Floor 20,850 sq. ft.. All construction per the approved plans and attached comment list. Separate grading & site utlities permit issued under BLD07-00904. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  6/12/2013 DONE
Case Summary (BLD)  4/6/2010 DONE
Second Notice BLD4/23/20084/23/20085/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/28/20084/23/2008 DONE
BLD-Final1/28/20081/28/20081/28/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/28/2008 at 10:27:57 AM. ok for perm
Permanent Occupancy  1/28/2008 DONE
BLD-Final1/17/20081/18/20081/18/2008APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/17/2008 at 11:21:12 AM. Contact: ###-####. ok for temp only per approved plan
FIRE-Final Inspection1/17/20081/18/20081/18/2008APASS
DetailsTroy Cobbley
Life safety passed
Temporary Occupancy1/18/20084/17/20081/18/2008 DONE
DetailsCathy Weisshaupt
FIRE-Final Inspection1/16/20081/17/20081/17/2008AFAIL
DetailsTroy Cobbley
Provide fire alarm as-builts and updated map for the facp, repair the emergency light at the top of stair #1 and provide permit through the fire dept for the bulk gas as per the review comments.
Telephone call  1/17/2008 DONE
Recieved Hazardous materials quantity information from Scot Harris. Plans are approved based on the maximum amount of type "K" oxygen cylinders to be limited to12 within the med gas storage room; or under a 3,000 total cubic feet. Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
BLD-Conference1/14/20081/14/20081/14/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/14/2008 at 11:16:38 AM. Contact: ###-####.
BLD-Framing/Rough-in12/27/200712/28/200712/28/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/27/2007 at 6:25:56 PM. Contact: ###-####.
BLD-Framing/Rough-in12/14/200712/14/200712/14/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/14/2007 at 8:14:48 AM. Contact: ###-####.
BLD-Framing/Rough-in12/11/200712/12/200712/12/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/11/2007 at 7:24:59 PM. Contact: ###-####. wip ok grid
BLD-Framing/Rough-in12/10/200712/10/200712/10/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/10/2007 at 7:50:22 AM. Contact: ###-####. wip ok
BLD-Framing/Rough-in12/5/200712/6/200712/6/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/5/2007 at 3:53:37 PM. Contact: ###-####. clips tp be instaled through out ceilling. ok to drop tile on non smoke and fire sepetration walls need to seal penatrations.
PubWorks Occupancy Approval11/30/200711/30/200711/28/2007 DONE
BLD-Framing/Rough-in11/26/200711/26/200711/26/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 11/26/2007 at 8:02:06 AM. Contact: ###-####.
Code Occupancy Approval11/9/200711/9/200711/9/2007PPASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Framing/Rough-in10/19/200710/22/200710/22/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/19/2007 at 4:23:39 PM. Contact: ###-####. wip ok
BLD-Framing/Rough-in10/17/200710/18/200710/18/2007APASS
DetailsTom Arcoraci
wip ok
BLD-Framing/Rough-in10/17/200710/17/200710/17/2007PDEFR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/17/2007 at 8:19:17 AM. Contact: ###-####.
BLD-Framing/Rough-in10/11/200710/12/200710/12/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/11/2007 at 11:55:09 AM. Contact: ###-####. wip
BLD-Other10/8/200710/8/200710/8/2007PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/8/2007 at 9:39:41 AM. Contact: ###-####. wip ok 2nd floor
BLD-Framing/Rough-in10/4/200710/5/200710/5/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/4/2007 at 3:34:29 PM. Contact: ###-####.wip ok
BLD-Other10/2/200710/2/200710/2/2007PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in9/27/20079/28/20079/28/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/27/2007 at 5:59:34 PM.
BLD-Framing/Rough-in9/26/20079/27/20079/27/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/26/2007 at 12:07:54 PM. Contact: ###-####. wip ok per plan
BLD-Conference9/18/20079/18/20079/18/2007PDONE
DetailsMike Jordan
BLD-Conference9/18/20079/18/20079/18/2007PPASS
DetailsTom Arcoraci
BLD-Wall cover9/12/20079/13/20079/13/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 9/12/2007 at 4:43:32 PM. Contact: ###-####.wip ok
BLD-Framing/Rough-in8/22/20078/22/20078/22/2007PPART
DetailsTom Arcoraci
elev shaft per plan
BLD-Framing/Rough-in8/21/20078/22/20078/22/2007ACANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/21/2007 at 8:49:58 AM. Contact: ###-####.
BLD-Conference8/3/20078/6/20078/6/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 8/3/2007 at 7:39:30 AM. Contact: ###-####.
BLD-Concrete7/26/20077/27/20077/27/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/26/2007 at 12:00:24 PM. Contact: ###-####.
BLD-Concrete7/16/20077/17/20077/17/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/16/2007 at 9:30:01 AM. Contact: ###-####.wip spec insp
BLD-Foundation6/25/20076/26/20076/26/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/25/2007 at 3:18:42 PM. Contact: ###-####.
BLD-Footing6/20/20076/20/20076/20/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/20/2007 at 6:52:42 AM. Contact: ###-####.
BLD-Foundation6/13/20076/14/20076/14/2007APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/13/2007 at 2:45:25 PM. Contact: ###-####.
Elevator shaft............OK pending STRATA special insp, tests, and approvals.
BLD-Footing6/7/20076/8/20076/8/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/7/2007 at 3:30:30 PM. Contact: ###-####. spec insp
BLD-Footing6/6/20076/6/20076/6/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/6/2007 at 7:35:05 AM. Contact: ###-####. wip ok
BLD-Footing6/2/20076/4/20076/4/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 6/2/2007 at 7:21:15 AM. Contact: ###-####.
BLD-Foundation5/23/20075/24/20075/24/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/23/2007 at 4:56:19 PM. Contact: ###-####.
BLD-Foundation5/22/20075/22/20075/22/2007PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/22/2007 at 9:17:12 AM. Contact: ###-####. spec ok to date
BLD-Footing5/18/20075/18/20075/18/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/18/2007 at 7:00:27 AM. Contact: ###-####. spec insp
BLD-Footing5/14/20075/15/20075/16/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/14/2007 at 12:39:31 PM. Contact: ###-####. spec insp
BLD-Footing5/10/20075/11/20075/11/2007APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/10/2007 at 1:23:54 PM. Contact: ###-####. wip ok
BLD-Footing5/10/20075/11/20075/10/2007PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/10/2007 at 9:23:19 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 1:31PM.
BLD-Footing5/9/20075/10/20075/10/2007PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/9/2007 at 11:24:29 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 9:30AM.
BLD-Footing5/9/20075/9/20075/9/2007PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 5/9/2007 at 11:20:55 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 9 2007 11:31AM.
(F) Reprint permit  5/4/2007  
Issue PAID IN FULL permit  5/3/2007 DONE
Plan Reviewer's activity  3/22/2007 PASS
Review and approved structural and nonstructural plan resubmittals.
PLANS/APPL TAKEN TO FRONT DESK  3/22/2007 DONE
Print Occupancy Form  3/22/2007 DONE
Permit Ready to Issue  3/22/2007 DONE
Telephone call  3/22/2007 DONE
Called and left voice message that permit is ready & we need GC, Registration #, RP and ACHD info///3/22/07 @ 2:24pm BAS
Routing - PLAN CHECK3/16/2007 3/22/2007 PASS
Plan assigned to (JCM)2/1/2007 3/22/2007 PASS
3/22/2007 10:25:54 JCM - activity updated through activity BLDA022 from case BLD07-00274.
Plan resubmittals received  3/21/2007  
Received 1 copy of cover transmittal, 1 copy of response letter (3pgs), 1 copy of Carlisle's SureWeld code approval guide table of contents (36 pgs), 1 copy of ES Report ESR-1748 (10pgs), 1 copy of Physical & Design Data-Glass Block Shading & Heat Gain, 1 copy of Glynn-Johnson Push/Pull Latches (5pgs), 1 copy of Pionite Standard Laminate Technical Bulletin (4 pgs), 1 copy of Precision Brush-Custom Brush Seals (6 pgs), 1 copy of Structural review comments responses (1pg), 3 copies of structural calcs (11pgs), 2 copies of G105, G106, A001, A003, A112, A113, A114, A121, A122, A123, A201, A301, A302, A471, A481, A482, A601, A772, A791, S121, S131, S301, PL-113, PL-123, PP-113, PP-131 and taken to John Menard
Plan resubmittals received  3/20/2007  
Received transmittal letter and 2 copies of page C100; taken to John Menard
Routing - PLUMBING3/15/2007 3/16/2007 PASS
additional valving may be required at the emergency treatment room on the med gas system per nfpa 99c.
Routing - PUBLIC WORKS3/13/2007 3/15/2007 PASS
Routing - PLAN CHECK3/8/2007 3/13/2007  
Routing - FIRE3/13/2007 3/13/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK3/13/2007 3/13/2007  
Telephone call  3/9/2007 DONE
Spoke with architect regarding the deferred submittal requirement for an operational permit pertaining to the medical gas storage.
Plan resubmittals received  3/9/2007 DONE
Recieved letter of response from architect pertaining to fire review comments resubmittal items.
Routing - FIRE3/5/2007 3/8/2007 FAIL
Emailed & Faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  3/8/2007 FAIL
Plan resubmittals requested  3/7/2007 DONE
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL2/2/2007 3/6/2007 FAIL
called action courier for pickup - Received a comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLAN CHECK2/20/2007 3/5/2007 FAIL
john menard
Plan resubmittals requested  3/5/2007  
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals received  2/28/2007 DONE
Received 1 transmittal, 1 plumbing sheet and 2 copys of sheets PL-113,PP-121,PP-122,PP-113,P-501,P-602,P-701,FS110,FS120,FS130 taken to John M.
Routing - PLANNING2/15/2007 2/20/2007 PASS
Approved per drh06-00350 and cup06-00065
Routing - PLUMBING2/8/2007 2/15/2007 FAIL
add hand sink per cdhd note page FS110. resubmit kitchen drainage per public works review. increase grease interceptor venting to 3" min. med gas riser locations do not match pages PP-112 and PP-122. additional valving may be required at the emergency treatment room on the med gas system.
Routing - Erosion and Sediment2/8/2007 2/8/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS2/2/2007 2/8/2007 FAIL
2 disposers in kitchen: WBSD prohibition- need variance. Contact Walt Baumgartner ###-####
Routing - PLANNING Land Div2/2/2007 2/2/2007 PASS
Parcel is larger than 5 acres - ok per DAA.. JJ
Plans ACCEPTED BY PLAN TECH  2/2/2007  
Plan routing begun/NEW & ADDTN  2/2/2007  
Application received  2/1/2007  
Pending Assignment by MYS2/1/2007 2/1/2007 DONE
2/1/2007 15:04:57 JCM - activity updated through activity BLDA166 from case BLD07-00274.
Recd Pcfee & Taken To Pln CK  2/1/2007