Case Summary (BLD) | | | 6/12/2013 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/6/2010 | | DONE |
|
|
|
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 5/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/28/2008 | 4/23/2008 | | DONE |
|
|
|
|
BLD-Final | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/28/2008 at 10:27:57 AM. ok for perm
|
Permanent Occupancy | | | 1/28/2008 | | DONE |
|
|
|
|
BLD-Final | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/17/2008 at 11:21:12 AM. Contact: ###-####. ok for temp only per approved plan
|
FIRE-Final Inspection | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Temporary Occupancy | 1/18/2008 | 4/17/2008 | 1/18/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire alarm as-builts and updated map for the facp, repair the emergency light at the top of stair #1 and provide permit through the fire dept for the bulk gas as per the review comments.
|
Telephone call | | | 1/17/2008 | | DONE |
|
|
|
Recieved Hazardous materials quantity information from Scot Harris. Plans are approved based on the maximum amount of type "K" oxygen cylinders to be limited to12 within the med gas storage room; or under a 3,000 total cubic feet. Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
|
BLD-Conference | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/14/2008 at 11:16:38 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/27/2007 at 6:25:56 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/14/2007 at 8:14:48 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/11/2007 at 7:24:59 PM. Contact: ###-####. wip ok grid
|
BLD-Framing/Rough-in | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/10/2007 at 7:50:22 AM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/5/2007 at 3:53:37 PM. Contact: ###-####. clips tp be instaled through out ceilling. ok to drop tile on non smoke and fire sepetration walls need to seal penatrations.
|
PubWorks Occupancy Approval | 11/30/2007 | 11/30/2007 | 11/28/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 11/26/2007 | 11/26/2007 | 11/26/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/26/2007 at 8:02:06 AM. Contact: ###-####.
|
Code Occupancy Approval | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Framing/Rough-in | 10/19/2007 | 10/22/2007 | 10/22/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/19/2007 at 4:23:39 PM. Contact: ###-####. wip ok
|
BLD-Framing/Rough-in | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 10/17/2007 | 10/17/2007 | 10/17/2007 | P | DEFR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/17/2007 at 8:19:17 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 11:55:09 AM. Contact: ###-####. wip
|
BLD-Other | 10/8/2007 | 10/8/2007 | 10/8/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/8/2007 at 9:39:41 AM. Contact: ###-####. wip ok 2nd floor
|
BLD-Framing/Rough-in | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 3:34:29 PM. Contact: ###-####.wip ok
|
BLD-Other | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/27/2007 at 5:59:34 PM.
|
BLD-Framing/Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/26/2007 at 12:07:54 PM. Contact: ###-####. wip ok per plan
|
BLD-Conference | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Conference | 9/18/2007 | 9/18/2007 | 9/18/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/12/2007 | 9/13/2007 | 9/13/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 4:43:32 PM. Contact: ###-####.wip ok
|
BLD-Framing/Rough-in | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PART |
Tom Arcoraci
|
|
|
elev shaft per plan
|
BLD-Framing/Rough-in | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/21/2007 at 8:49:58 AM. Contact: ###-####.
|
BLD-Conference | 8/3/2007 | 8/6/2007 | 8/6/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/3/2007 at 7:39:30 AM. Contact: ###-####.
|
BLD-Concrete | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/26/2007 at 12:00:24 PM. Contact: ###-####.
|
BLD-Concrete | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 9:30:01 AM. Contact: ###-####.wip spec insp
|
BLD-Foundation | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/25/2007 at 3:18:42 PM. Contact: ###-####.
|
BLD-Footing | 6/20/2007 | 6/20/2007 | 6/20/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/20/2007 at 6:52:42 AM. Contact: ###-####.
|
BLD-Foundation | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2007 at 2:45:25 PM. Contact: ###-####. Elevator shaft............OK pending STRATA special insp, tests, and approvals.
|
BLD-Footing | 6/7/2007 | 6/8/2007 | 6/8/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/7/2007 at 3:30:30 PM. Contact: ###-####. spec insp
|
BLD-Footing | 6/6/2007 | 6/6/2007 | 6/6/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 7:35:05 AM. Contact: ###-####. wip ok
|
BLD-Footing | 6/2/2007 | 6/4/2007 | 6/4/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/2/2007 at 7:21:15 AM. Contact: ###-####.
|
BLD-Foundation | 5/23/2007 | 5/24/2007 | 5/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/23/2007 at 4:56:19 PM. Contact: ###-####.
|
BLD-Foundation | 5/22/2007 | 5/22/2007 | 5/22/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/22/2007 at 9:17:12 AM. Contact: ###-####. spec ok to date
|
BLD-Footing | 5/18/2007 | 5/18/2007 | 5/18/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/18/2007 at 7:00:27 AM. Contact: ###-####. spec insp
|
BLD-Footing | 5/14/2007 | 5/15/2007 | 5/16/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/14/2007 at 12:39:31 PM. Contact: ###-####. spec insp
|
BLD-Footing | 5/10/2007 | 5/11/2007 | 5/11/2007 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 1:23:54 PM. Contact: ###-####. wip ok
|
BLD-Footing | 5/10/2007 | 5/11/2007 | 5/10/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/10/2007 at 9:23:19 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 1:31PM.
|
BLD-Footing | 5/9/2007 | 5/10/2007 | 5/10/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 11:24:29 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 10 2007 9:30AM.
|
BLD-Footing | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 5/9/2007 at 11:20:55 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on May 9 2007 11:31AM.
|
(F) Reprint permit | | | 5/4/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/3/2007 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/22/2007 | | PASS |
|
|
|
Review and approved structural and nonstructural plan resubmittals.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/22/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/22/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/22/2007 | | DONE |
|
|
|
Called and left voice message that permit is ready & we need GC, Registration #, RP and ACHD info///3/22/07 @ 2:24pm BAS
|
Routing - PLAN CHECK | 3/16/2007 | | 3/22/2007 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 2/1/2007 | | 3/22/2007 | | PASS |
|
|
|
3/22/2007 10:25:54 JCM - activity updated through activity BLDA022 from case BLD07-00274.
|
Plan resubmittals received | | | 3/21/2007 | | |
|
|
|
Received 1 copy of cover transmittal, 1 copy of response letter (3pgs), 1 copy of Carlisle's SureWeld code approval guide table of contents (36 pgs), 1 copy of ES Report ESR-1748 (10pgs), 1 copy of Physical & Design Data-Glass Block Shading & Heat Gain, 1 copy of Glynn-Johnson Push/Pull Latches (5pgs), 1 copy of Pionite Standard Laminate Technical Bulletin (4 pgs), 1 copy of Precision Brush-Custom Brush Seals (6 pgs), 1 copy of Structural review comments responses (1pg), 3 copies of structural calcs (11pgs), 2 copies of G105, G106, A001, A003, A112, A113, A114, A121, A122, A123, A201, A301, A302, A471, A481, A482, A601, A772, A791, S121, S131, S301, PL-113, PL-123, PP-113, PP-131 and taken to John Menard
|
Plan resubmittals received | | | 3/20/2007 | | |
|
|
|
Received transmittal letter and 2 copies of page C100; taken to John Menard
|
Routing - PLUMBING | 3/15/2007 | | 3/16/2007 | | PASS |
|
|
|
additional valving may be required at the emergency treatment room on the med gas system per nfpa 99c.
|
Routing - PUBLIC WORKS | 3/13/2007 | | 3/15/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/8/2007 | | 3/13/2007 | | |
|
|
|
|
Routing - FIRE | 3/13/2007 | | 3/13/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 3/13/2007 | | 3/13/2007 | | |
|
|
|
|
Telephone call | | | 3/9/2007 | | DONE |
|
|
|
Spoke with architect regarding the deferred submittal requirement for an operational permit pertaining to the medical gas storage.
|
Plan resubmittals received | | | 3/9/2007 | | DONE |
|
|
|
Recieved letter of response from architect pertaining to fire review comments resubmittal items.
|
Routing - FIRE | 3/5/2007 | | 3/8/2007 | | FAIL |
|
|
|
Emailed & Faxed resubmittal items to architect. Attached review comments to plans.
|
1st review completed | | | 3/8/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/7/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 2/2/2007 | | 3/6/2007 | | FAIL |
|
|
|
called action courier for pickup - Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLAN CHECK | 2/20/2007 | | 3/5/2007 | | FAIL |
|
|
|
john menard
|
Plan resubmittals requested | | | 3/5/2007 | | |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan resubmittals received | | | 2/28/2007 | | DONE |
|
|
|
Received 1 transmittal, 1 plumbing sheet and 2 copys of sheets PL-113,PP-121,PP-122,PP-113,P-501,P-602,P-701,FS110,FS120,FS130 taken to John M.
|
Routing - PLANNING | 2/15/2007 | | 2/20/2007 | | PASS |
|
|
|
Approved per drh06-00350 and cup06-00065
|
Routing - PLUMBING | 2/8/2007 | | 2/15/2007 | | FAIL |
|
|
|
add hand sink per cdhd note page FS110. resubmit kitchen drainage per public works review. increase grease interceptor venting to 3" min. med gas riser locations do not match pages PP-112 and PP-122. additional valving may be required at the emergency treatment room on the med gas system.
|
Routing - Erosion and Sediment | 2/8/2007 | | 2/8/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 2/2/2007 | | 2/8/2007 | | FAIL |
|
|
|
2 disposers in kitchen: WBSD prohibition- need variance. Contact Walt Baumgartner ###-####
|
Routing - PLANNING Land Div | 2/2/2007 | | 2/2/2007 | | PASS |
|
|
|
Parcel is larger than 5 acres - ok per DAA.. JJ
|
Plans ACCEPTED BY PLAN TECH | | | 2/2/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/2/2007 | | |
|
|
|
|
Application received | | | 2/1/2007 | | |
|
|
|
|
Pending Assignment by MYS | 2/1/2007 | | 2/1/2007 | | DONE |
|
|
|
2/1/2007 15:04:57 JCM - activity updated through activity BLDA166 from case BLD07-00274.
|
Recd Pcfee & Taken To Pln CK | | | 2/1/2007 | | |
|
|
|
|