Permit Information
Permit NumberBLD07-00292
StatusFinaled
Name JORDAN-WILCOMB CONST INC
Site Address 807 N 8TH ST
Project NameST JOHNS CATHEDRAL
Customer Number 
ePlanReviewNo
Description
(ST. JOHN'S CATHEDRAL - BASEMENT REMODEL - CHOIR LOFT REMODEL) To remodel the basement (about 11,800 square feet) and the choir loft (about 1,950 square feet) of an existing church. Work is to include interior nonbearing walls, 3 restrooms accessible to the disabled, movable partitions, the structural support for movable partitions, a 1-hr corridor, steel structure support at door headers, grease hoods and ducts, gypsum board ceilings, gypsum board soffits, suspended acoustical ceilings, and finishes. The exterior ramp will be constructed under a future permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/5/20083/5/20083/12/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Second Notice BLD2/6/20082/6/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/24/20082/6/2008 DONE
Permanent Occupancy  1/24/2008  
BLD-Final1/17/20081/18/20081/18/2008PPASS
DetailsTony Young
kevin Phone #: ###-####
FIRE-Final Inspection1/17/20081/18/20081/18/2008APASS
DetailsForrest France
Fire life safety Passed.KR
BLD-Other1/10/20081/11/20081/11/2008AFAIL
DetailsTony Young
kevin - ceiling grid Phone #: ###-####
need clips
BLD-Final11/1/200711/2/200711/2/2007APART
DetailsTony Young
kevin - late morning Phone #: ###-####
east of day chapel ok,, dining and kitchen area ok for temp occ. pending trades
FIRE-Final Inspection11/1/200711/2/200711/2/2007APART
DetailsForrest France
Noted corrections from the previous inspection are complete. Fire life safety for the portion of the remodel east of the Day Chapel area wall separating room 101, hallway 114, and vestibule 102 is satisfactory.
BLD-Final10/31/200711/1/200711/1/2007ANR
DetailsTony Young
kevin Phone #: ###-####
FIRE-Final Inspection10/31/200711/1/200711/1/2007AFAIL
DetailsForrest France
Need to add EM lighting as discussed, missing the north exit door and hardware, need to provide max. occupant load signage, south exit discharge path is not completed at this time.
Code Occupancy Approval  11/1/2007 DONE
DetailsWm. Michael Meloy
Approval only for interior work and not outside landscaping.
BLD-Other10/26/200710/29/200710/29/2007APASS
DetailsTony Young
ceiling inspection//Kevin ###-####
BLD-Other10/26/200710/29/200710/29/2007APASS
DetailsTony Young
ceiling inspection//Kevin ###-####
BLD-Other10/24/200710/26/200710/26/2007APART
DetailsTony Young
ceiling inspection//Kevin ###-####
mostly ok but will re-check on monday
BLD-Other10/23/200710/24/200710/25/2007PPART
DetailsJim Storey
kevin - ceiling Phone #: ###-#### maintane ceilling membrane/ check type 1 duct clearances or if to be wraped/ seal coridor/ protect colm 1 hr const./ if ceilling is a open plenm need rated wire. ok to cut in perimtor on ceilling.
FIRE-Conference10/22/200710/22/200710/22/2007PDONE
DetailsForrest France
Conference regarding contractors intent to pursue a partial approval of fire permits for temporary occupancy approval.
BLD-Conference10/15/200710/15/200710/16/2007PPART
DetailsTony Young
kevin Phone #: ###-####
conf on door landing on north side,, will pour a temp landing and have a step down landing after that to stairs,, so that the lower stair rise will not be affected,, this will be redone next year w/ new landscape plan
BLD-Framing/Rough-in8/28/20078/28/20078/29/2007PPART
DetailsTony Young
kevin Phone #: ###-####
floor area ok
FIRE-Conference8/27/20078/28/20078/28/2007ADONE
DetailsForrest France
On site conference to discuss project scheduling, required exits, exit signage, and duct smoke detection.
FIRE-Conference8/23/20078/24/20078/24/2007PNH
DetailsForrest France
Contractor not available on site or telephone at the time of field visit.
FIRE-Final Inspection8/23/20078/23/20078/23/2007PNR
DetailsForrest France
Intended for an on site conference, to be scheduled as discussed.
BLD-Framing/Rough-in7/27/20077/30/20077/30/2007APART
DetailsTony Young
kevin; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
basement walls east of chapel wall ok pending trades
BLD-Conference6/29/20077/2/20077/2/2007APART
DetailsTony Young
Kevin; Phone #: ###-####
general ?s
BLD-Conference6/28/20076/29/20076/29/2007ACANC
DetailsTony Young
kevin; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
out of time
BLD-Conference6/6/20076/6/20076/8/2007PDONE
DetailsTony Young
Kevin; Phone #: ###-####
w/425 on fire rating issues, exiting issues, etc
BLD-Conference6/5/20076/6/20076/7/2007PDONE
DetailsDave Hannah
Kevin; Phone #: ###-#### Internet Inspection Request from: Hatti James
BLD-Conference6/5/20076/6/20076/6/2007ANH
DetailsTony Young
Kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
Override - Parcel Holds  5/14/2007  
Issue PAID IN FULL permit  5/14/2007 DONE
Telephone call  5/11/2007 DONE
t/c w rob thorton at ###-#### - permit ready and fees given
Override - Parcel Holds  5/11/2007  
Permit Ready to Issue  5/11/2007  
Plan assigned to (CJW)2/6/2007 5/10/2007 PASS
5/10/2007 11:45:09 CJW - activity updated through activity BLDA022 from case BLD07-00292.
Routing - PLAN CHECK5/9/2007 5/10/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/10/2007 DONE
Print Occupancy Form  5/10/2007 DONE
Routing - PLANNING5/7/2007 5/9/2007  
Per DRH07-00199
Routing - PLAN CHECK4/20/2007 5/7/2007 DONE
Inserted resubmitted drawings and sent back to Planning.
Plan resubmittals received  5/7/2007 DONE
received 1 transmittal,1 response and 1 copyof sheet A2.02,A2.54,A6.12,A6.13 taken to Carl W .
Routing - PLANNING4/19/2007 4/20/2007 FAIL
Failed, Certificate of Appropriateness not submitted for the changing out of windows or any exterior work.
Routing - PLAN CHECK3/22/2007 4/18/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  4/10/2007 DONE
Received 1 transmittal,1 response letter,1 structural response,1 comment,1 review,2 supplemental calcs, and 2 copys of sheets A2.02,A2.11,A2.51,A2.52,A2.55,A3.21,A3.22,A4.12,A5.12,A6.11,A6.12,S4.1,M4.0,E2.11 taken to Carl W.
1st review completed  3/22/2007 FAIL
Routing - FIRE3/20/2007 3/22/2007 PASS
Attached IFC review comments to plans. Plans approved as noted.
Routing - PLAN CHECK2/15/2007 3/20/2007 FAIL
The IBC plan review was started on March 12, 2007 and was finished on March 20, 2007. Revised drawings were required. See the plan review report.
Routing - PLUMBING2/8/2007 2/15/2007 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS2/6/2007 2/8/2007 PASS
Pending Assignment by MYS2/2/2007 2/6/2007 DONE
2/6/2007 15:44:01 MYS - activity updated through activity BLDA172 from case BLD07-00292.
Application received  2/2/2007  
Recd Pcfee & Taken To Pln CK  2/2/2007 DONE
Plans ACCEPTED BY PLAN TECH  2/2/2007