Case Summary (BLD) | | | 10/12/2012 | | DONE |
|
|
|
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 12/4/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
(F) Reprint permit | | | 9/16/2008 | | DONE |
|
|
|
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/12/2007 | 11/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/12/2007 | | DONE |
|
|
|
|
BLD-Final | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Tony Young
|
|
|
jimmy Phone #: ###-#### ok for perm c of o
|
FIRE-Final Inspection | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
FIRE-Final Inspection | 10/3/2007 | 10/4/2007 | 10/4/2007 | A | FAIL |
Troy Cobbley
|
|
|
See the city approved plans for deficiencies which include sprinkler work, exit signs and ceilings that need installed.
|
Case Summary (BLD) | | | 9/17/2007 | | |
|
|
|
printed for Mark Senteno to F/U on TOC status.
|
BLD-Final | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PART |
Tony Young
|
|
|
jim ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith temp on front part
|
BLD-Final | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PART |
Tony Young
|
|
|
Jim Closer to late morning; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok for temp occ. on phase one
|
FIRE-Final Inspection | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 3/15/2007 | 3/16/2007 | 3/16/2007 | P | FAIL |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall conf on job,, need trades,, POSTED 3 "DO NOT OCCUPY" NOTICES,, the c/n that I had put on this am had been removed,, 430 had put two DO NOT OCCUPY notices up this am and they also where removed.
|
BLD-Framing/Rough-in | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PART |
Tony Young
|
|
|
JIMMY; Phone #: ###-#### Internet Inspection Request from: Victoria Beall second half of 1st phase ok to cover
|
FIRE-Final Inspection | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | FAIL |
Troy Cobbley
|
|
|
I posted Do Not Occupy stickers/signs at both of the main exit doors and took pictures of their placement. The signs have been posted due to the fact that the public was being encouraged to enter the building. And per the owner a grand opening is scheduled for tomorrow. The fire sprinkler permit final inspection failed for multiple reasons, see fire sprinkler permit for details. Also per the building review comments exit signs and emergency lights were to be field verified. It is obvious that more exit signs will be required. Only one fire extinguisher was there and it was expired. Atleast three other fire extinguishers are needed. Also phase 1 is not complete as per the phase 1 area shown on the plans. No sprinkler inspection was performed, see fire permit notes, and no fire life safety inspection was performed due to the fire sprinkler permit being failed.
|
BLD-Framing/Rough-in | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover now,, may need fire sprinkler permit,, conf. w/ owner or contractor via phone
|
BLD-Framing/Rough-in | 2/13/2007 | 2/14/2007 | 2/14/2007 | P | FAIL |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Victoria Beall frame ok now after talking w/ struct engineer,, need elec. rough
|
BLD-Framing/Rough-in | 2/13/2007 | 2/13/2007 | 2/13/2007 | P | FAIL |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need elec. 1st,, need ok as built or build as engineering,, conf only
|
BLD-Framing/Rough-in | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | CANC |
Tony Young
|
|
|
Jim ###-####
|
Print Occupancy Form | | | 2/12/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/12/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 2/5/2007 | 2/5/2007 | 2/9/2007 | | PASS |
|
|
|
2/9/2007 15:41:57 RMH - activity updated through activity BLDA022 from case BLD07-00295.
|
Plan resubmittals received | | | 2/9/2007 | | |
|
|
|
received transmittal letter from the architects office. 3 sets of plans including each sheet of AO.O, A1.O, A1.1-plans taken to Ron Hill
|
Routing - PLAN CHECK | 2/9/2007 | | 2/9/2007 | | PASS |
|
|
|
|
Routing - FIRE | 2/9/2007 | | 2/9/2007 | | PASS |
|
|
|
Minor work field verify conditions.
|
Case Summary (BLD) | | | 2/9/2007 | | DONE |
|
|
|
|
1st review completed | | | 2/9/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2007 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2007 | | |
|
|
|
|
Application received | | | 2/2/2007 | | |
|
|
|
|