BLD-Final | 4/5/2007 | 4/6/2007 | 4/6/2007 | A | PASS |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 4/6/2007 | 4/6/2007 | 4/6/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/22/2007 at 5:23:39 PM.
|
BLD-Foundation | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 6:27:05 PM. Contact: ###-####. needs teerys sign off
|
PubWorks Subgrade Approval | 2/22/2007 | 2/22/2007 | 2/22/2007 | | DONE |
|
|
|
Footing subgrade for isolated column footing near the property line has been approved by the geotechnical engineer. The excavation for the proposed strip footing was overdug to a depth of seven feet and will be filled with drain rock to footing level. The geotechnical engineer states this will be acceptable
|
BLD-Footing | 2/12/2007 | 2/12/2007 | 2/12/2007 | P | NR |
Dave Hannah
|
|
|
david ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith needs terrys records sign off
|
BLD-Footing | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | CANC |
Dave Hannah
|
|
|
david ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Routing Walk-In (Zoning) | 2/9/2007 | 2/9/2007 | 2/9/2007 | A | PASS |
|
|
|
|
Routing Walk-In (BLD) | 2/9/2007 | 2/9/2007 | 2/9/2007 | A | DONE |
|
|
|
2/9/2007 10:22:03 PEP - activity updated through activity BLDA022 from case BLD07-00346.
|
Case Summary (BLD) | | | 2/9/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/9/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/9/2007 | | |
|
|
|
|
Application received | | | 2/9/2007 | | |
|
|
|
|