BLD-Final | 10/24/2007 | 10/25/2007 | 10/25/2007 | A | PASS |
Tony Young
|
|
|
steve Phone #: ###-####
|
DOC - Permit Finaled | 10/25/2007 | 10/25/2007 | 10/25/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 10/23/2007 | 10/23/2007 | 10/23/2007 | P | PART |
Tony Young
|
|
|
steve - fire life safety Phone #: ###-#### ok to move stuff into house,, minor issues pending,, conf on job
|
FIRE-Final Inspection | 10/22/2007 | 10/23/2007 | 10/23/2007 | A | CANC |
Tony Young
|
|
|
steve - fire life safety Phone #: ###-#### F/L/S NOT NEEDED,, RE SCHEDULED FOR A BLD FINAL
|
BLD-Grading Inspection | 10/22/2007 | 10/22/2007 | 10/22/2007 | P | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Framing/Rough-in | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Tony Young
|
|
|
steve Phone #: ###-####
|
BLD-Energy code compliance | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Tony Young
|
|
|
steve Phone #: ###-####
|
BLD-Framing/Rough-in | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | FAIL |
Tony Young
|
|
|
Phone #: ###-#### c/n still not done,, need straps on plates
|
BLD-Framing/Rough-in | 7/10/2007 | 7/11/2007 | 7/11/2007 | P | FAIL |
Tony Young
|
|
|
steve Phone #: ###-#### c/n still not complete do not cover
|
BLD-Framing/Rough-in | 7/6/2007 | 7/9/2007 | 7/9/2007 | A | FAIL |
Tony Young
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang c/nposted,, ok to insulated
|
BLD-Framing/Rough-in | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | NR |
Tony Young
|
|
|
Steve; Phone #: ###-####
|
BLD-Framing/Rough-in | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Tony Young
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang need trades 1st,, see c/n for courtesy frame inspection
|
BLD-Wall cover | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | PART |
Tony Young
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang exterior ok to cover
|
BLD-Foundation | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PASS |
Tony Young
|
|
|
clint Note: foundation wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 5/14/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Dave Hannah
|
|
|
clint ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
PubWorks Subgrade Approval | 5/14/2007 | 5/14/2007 | 5/14/2007 | | PART |
|
|
|
Subgrade for retaining wall and slab on south side approved by the geotechnicl engineer
|
BLD-Foundation | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | PART |
Tony Young
|
|
|
Clint; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman retaining wall,, wip
|
BLD-Footing | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Tony Young
|
|
|
steve ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
PubWorks Subgrade Approval | 4/25/2007 | 4/25/2007 | 4/25/2007 | | PART |
|
|
|
Geotechnical engineer has approved footing subgrade for retaining wall and crawl space
|
BLD-Wall cover | 4/4/2007 | 4/5/2007 | 4/5/2007 | A | PART |
Tony Young
|
|
|
Jose ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus basement wall,, wip
|
BLD-Footing | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PART |
Tony Young
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall basement wall,, wip,, setbacks appear ok
|
PubWorks Subgrade Approval | 3/29/2007 | 3/29/2007 | 3/29/2007 | | DONE |
|
|
|
footing subgrade approved by geotechnical engineer
|
BLD-Footing | 3/26/2007 | 3/27/2007 | 3/27/2007 | P | CANC |
Mike Jordan
|
|
|
Jose preferrably 2:00; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. Canc. by contractor via phone call.
|
Issue PAID IN FULL permit | | | 3/15/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2007 | | DONE |
|
|
|
t/c w chuck at shilo development ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/12/2007 | | |
|
|
|
|
Plan assigned to (SRZ) | 3/8/2007 | 3/8/2007 | 3/9/2007 | | PASS |
|
|
|
3/9/2007 11:43:57 SRZ - activity updated through activity BLDA022 from case BLD07-00365.
|
Case Summary (BLD) | | | 3/9/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/27/2007 | | 3/9/2007 | | PASS |
|
|
|
|
Pending Assignment by SRZ | 2/12/2007 | | 3/8/2007 | | DONE |
|
|
|
3/8/2007 09:44:19 SRZ - activity updated through activity BLDA160 from case BLD07-00365.
|
Routing - FIRE | 2/21/2007 | | 2/27/2007 | | PASS |
|
|
|
No fire sprinklers required (Villa Norte Sub, Villa Norte st.)
|
Routing - Erosion and Sediment | 2/21/2007 | | 2/21/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 2/21/2007 | | 2/21/2007 | | PASS |
|
|
|
Okay as redlined. Walls cannot exceed 8' in height, as indicated in the CUP approval.
|
Routing - PLANNING | 2/13/2007 | | 2/14/2007 | | FAIL |
|
|
|
Routed to Cody CFH07-3 2/13/07
Fail: Appeal period does not end until February 20, 2007, per action letter of CFH.
|
Routing - PUBLIC WORKS | 2/12/2007 | | 2/13/2007 | | PASS |
|
|
|
|
Application received | | | 2/12/2007 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 2/12/2007 | | 2/12/2007 | | PASS |
|
|
|
Approved as Category 1 by CFH07-00003
|
Routing - Addressing | 2/12/2007 | | 2/12/2007 | | PASS |
|
|
|
|