Permit Information
Permit NumberBLD07-00430
StatusFinaled
Name KMR PARTNERSHIP
Site Address 3357 W MURANO CT
Project NameMANDOLIN PARK 4 PLEX lot 6
Customer Number 
ePlanReviewNo
Description
Mandolin Park - Four-Plex Apartment - To construct a new 4,452 square feet, two story, four unit, apartment building. The first floor is 2,284 square feet, the second floor is 2,156 square feet. Each unit is two bedroom and two bath, with a 100 square feet covered pation at 1,068 square feet each. All construction shall be per the approved plans and attached comment list. NOTE: This building is not required to be fire sprinklered per B.C.C. 4-02-31. DRG05-00095 CUP05-00010
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (ISS)  10/2/2017 DONE
Per Bob Archibald ok to reopen permit and issue final CO since all inspections done
Permanent Occupancy  10/2/2017 DONE
BLD-Aging Inspection3/24/20093/24/20093/24/2009 FAIL
DetailsTom Arcoraci
DOC - Permit Expired3/24/20093/24/20093/24/2009APASS
DetailsTom Arcoraci
BLD-Aging Inspection1/21/20091/21/20091/21/2009 DONE
DetailsTom Arcoraci
BLD-Aging Inspection11/18/200811/18/200811/18/2008 DONE
DetailsTom Arcoraci
BLD-Aging Inspection7/18/20087/18/20087/18/2008 DONE
DetailsDena Gambrel
7-17-08 There is an entry on 4-1-08 that they passed the occupancy inspection with code enforcement.
Code Occupancy Approval4/1/20084/1/20084/1/2008PPASS
DetailsDena Gambrel
4-1-08 1434 Passed.
Code Occupancy Approval2/27/20082/27/20082/27/2008ADONE
DetailsDena Gambrel
2-27-08 I spoke with Ken this morning. He will be bringing in the Bond this morning.
Temporary Occupancy UNPAID FEE  2/27/2008 DONE
BLD-Final2/25/20082/26/20082/26/2008APASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger ok for perm
BLD-Final2/21/20082/21/20082/21/2008PNR
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
FIRE-Final Inspection2/20/20082/21/20082/21/2008PPASS
DetailsForrest France
Fire life safety completed. KR
FIRE-Final Inspection2/20/20082/20/20082/20/2008PNH
DetailsForrest France
No access to complete inspection, rescheduled per conversation with contractor.
BLD-Energy code compliance11/23/200711/23/200711/23/2007PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
BLD-Framing/Rough-in11/20/200711/20/200711/20/2007PPASS
DetailsTom Arcoraci
Please call 1/2 hour before inspection...thanks Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
BLD-Aging Inspection11/20/200711/20/200711/20/2007 CANC
DetailsTom Arcoraci
BLD-Foundation9/18/20079/18/20079/18/2007PPASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Ken Litzinger
BLD-Footing9/17/20079/18/20079/17/2007APASS
DetailsTom Arcoraci
ken Phone #: ###-####
BLD-Aging Inspection8/13/20078/13/20078/16/2007 NR
DetailsTom Arcoraci
Telephone call  5/14/2007 DONE
t/c w george mclean at ###-#### - permit ready and fees given
Permit Ready to Issue  5/14/2007 DONE
Issue PAID IN FULL permit  5/14/2007 DONE
Print Occupancy Form  5/11/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/10/2007 DONE
Routing - PLAN CHECK5/4/2007 5/10/2007 PASS
Plan assigned to (M_P)2/22/2007 5/10/2007 PASS
5/10/2007 15:52:27 M_P - activity updated through activity BLDA022 from case BLD07-00430.
Plan resubmittals received  5/9/2007  
Received 2 copies of pages A3, A4, A5, A9, A12, A13, A14; taken to Mike Phillips
Routing - PLAN CHECK5/3/2007 5/4/2007  
Routing to Planning.
Routing - PLANNING5/4/2007 5/4/2007 PASS
Routing - PLAN CHECK5/2/2007 5/3/2007 FAIL
Second review failed original comments were not answered. Having meeting with the owner and architect on 5/4/07. Additional plans must be submitted for further review prior to issuing permit.
Routing - FIRE5/1/2007 5/2/2007 PASS
No change from previous status.
Routing - PLAN CHECK4/30/2007 5/1/2007  
Routing to fire.
Routing - PLUMBING4/27/2007 4/30/2007 PASS
per plans and 2003 upc
Routing - PLANNING  4/27/2007 FAIL
Applicant has no landscape plan in file. Left a message with Ken Litzinger.
Routing - PLANNING Land Div4/25/2007 4/25/2007 PASS
Routing - PLAN CHECK4/5/2007 4/25/2007  
Routing to others for approval.
Plan resubmittals received  4/24/2007  
Received cover transmittal, 2 copies of non-build agreement and 2 copies of the following sheets L-1, A-1, A-2, A-3, A-4, A-5, A-6, A-7, A-8, A-9, A-10, A-11, A-12, A-13, A-14, EN and taken to Mike Phillips
Routing - PLANNING3/30/2007 4/5/2007 PASS
Called applicant three times to see if I could get the landscape plans for the base of the buildings in order to sign off. Left messages but have had no return calls.
Routing - PLUMBING3/30/2007 3/30/2007 FAIL
no corrections made
Routing - PUBLIC WORKS3/22/2007 3/22/2007 PASS
Routing - PLAN CHECK3/21/2007 3/22/2007  
Routing to P.W.
1st review completed  3/21/2007 FAIL
Routing - FIRE3/16/2007 3/21/2007 PASS
Attached review comments to plans.
Routing - PLAN CHECK  3/16/2007 FAIL
Plan review complete, sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
Routing - PLANNING3/5/2007 3/7/2007 PASS
DRH05-00045 Sarah Schafer, CUP05-00010 Karen Gallagher
Project does not comply with the requirements of the Design Review or the Conditional Use Permit as they pertain to the landscape requirements.
Routing - PLUMBING3/2/2007 3/5/2007 FAIL
complete plumbing plans required on 4 plexs
Routing - Erosion and Sediment3/1/2007 3/2/2007 PASS
ESC plan approved with attached conditions. Refer to ESC06-00304 as master ESC plan for project.
Routing - PUBLIC WORKS2/23/2007 3/1/2007 FAIL
Trash location not acceptable. Enclosure is also too small, interior gate opening must be 11'0". Contact Pam Williams ###-####
Routing - PLANNING Land Div2/22/2007 2/23/2007 PASS
Plans ACCEPTED BY PLAN TECH  2/22/2007  
Plan routing begun/NEW & ADDTN  2/22/2007  
Application received  2/21/2007