Third Notice BLD | 6/6/2008 | 6/6/2008 | 7/14/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 1/28/2008 | 1/28/2008 | 4/23/2008 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 1/23/2008 | 1/24/2008 | 1/28/2008 | A | PASS |
Jim Sly
|
|
|
kent Phone #: ###-#### C/C issued
|
DOC - Permit Finaled | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 1/23/2008 | 1/24/2008 | 1/24/2008 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
l
|
BLD-Final | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | NR |
Jim Sly
|
|
|
kent Note: not intil after 3:00 when school is closed Phone #: ###-#### NR Need Buss Mech...to final Plumb permit....and Enselman plumb to final permit.
|
(F) Reprint permit | | | 8/27/2007 | | |
|
|
|
|
BLD-Final | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | CANC |
Tom Arcoraci
|
|
|
Cory; or call ###-####; Phone #: ###-#### Internet Inspection Request from: Hattie James contractor said jim has done this final
|
FIRE-Final Inspection | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hannimans permission until the hvac unit is installed and a fire alarm permit is issued
|
BLD-Final | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | NR |
Jim Sly
|
|
|
corey ###-#### Please call for before inspection Phone #: ###-#### Talked to Corey......Need all Mech permits finaled or temp.....gave him the permit #'s.......Need Fire final (or temp)
|
FIRE-Final Inspection | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | FAIL |
Troy Cobbley
|
|
|
Per the approved plans there is supposed to be a fire alarm permit for the new duct detector. Per mike timmerman there isn't any applied for yet and per the custodian the permanant doors are not installed yet.
|
BLD-Final | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | NR |
Jim Sly
|
|
|
corey ###-#### Phone #: ###-####
|
FIRE-Final Inspection | 8/15/2007 | 8/15/2007 | 8/15/2007 | P | FAIL |
Troy Cobbley
|
|
|
Corey did not answer his phone and the custodian and I could not find the approved plans. No inspection performed.
|
BLD-Framing/Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PART |
Jim Sly
|
|
|
cory; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang 1hr separation located above ceiling line OK
|
Issue PAID IN FULL permit | | | 5/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/17/2007 | | DONE |
|
|
|
called ###-#### and told David Blenker w/CSHQA permit is ready and fees, need GC and RCE
|
Permit Ready to Issue | | | 4/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/10/2007 | | DONE |
|
|
|
called ###-#### and told David Blenker w/CSHQA permit is ready and fees, need GC and RCE
|
Routing - PLAN CHECK | 3/30/2007 | | 4/9/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/9/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/16/2007 | | 4/9/2007 | | PASS |
|
|
|
4/9/2007 15:13:38 JCM - activity updated through activity BLDA022 from case BLD07-00491.
|
Routing - PLUMBING | 3/30/2007 | | 3/30/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
1st review completed | | | 3/29/2007 | | FAIL |
|
|
|
Failed plumbing.
|
Plan resubmittals received | | | 3/29/2007 | | |
|
|
|
Received transmittal letter, copy of Boise City Pumbig Plan Review, and 2 copies of pages P0.1 & P2.1; taken to Mike Otto
|
Routing - FIRE | 3/28/2007 | | 3/29/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 3/23/2007 | | 3/28/2007 | | PASS |
|
|
|
|
Routing - PLUMBING | 3/16/2007 | | 3/23/2007 | | FAIL |
|
|
|
vents must be 6" above flood level before connectiog to other vents. chemical resistant materials must be used in the waste and vent systems or a letter from the engineer stating the waste will be adequately diluted to not harm the dwv system. the safty shower on the fixture schedule requires a 1 1/4" water supply. the floor drain at the safty shower is undersized to accept the discharge from the 1 1/4" safty shower.
|
Routing - PUBLIC WORKS | 3/16/2007 | | 3/16/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 2/27/2007 | | 3/16/2007 | | DONE |
|
|
|
3/16/2007 09:10:08 MYS - activity updated through activity BLDA174 from case BLD07-00491.
|
Recd Pcfee & Taken To Pln CK | | | 2/27/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/27/2007 | | |
|
|
|
|
Application received | | | 2/27/2007 | | |
|
|
|
|