Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00494
StatusFinaled
Name STAN'S CHARBROILED NY HOTDOGS
Site Address 818 S VISTA AVE
Project NameVISTA VILLAGE-PHASE II
Customer Number 
ePlanReviewNo
Description
(STAN'S CHARBROILED N.Y. HOTDOGS - VISTA VILLAGE - NORTH ADDITION) This building is fire sprinklered for fire area and for building area increase. To create a 1,913 square foot restaurant within an 8,260 square foot, one story building. This tenant space is located within a new addition constructed under permit BLD04-02464. Work is to include 2 restrooms accessible to the disabled, 2 grease hoods and ducts, interior nonbearing walls, suspended ceilings, and finishes. In addition, an existing wall will be fully upgraded to comply as a 3-hr fire wall. Work is to include altering an existing masonry wall to comply as a 3-hr fire-resistance-rated wall assembly, protecting openings in the fire wall with fire assemblies having a 3-hr fire protection rating, constructing a 3-hr fire-resistance-rated gypsum board wall assembly through the concealed area of an existing canopy, and ensuring a 1-hr fire-resistance-rating for the exterior wall behind and below the canopy for a distance not less than the depth of the canopy on both sides of the fire wall. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/200712/19/2007 DONE
Second Notice has not been responded to.
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 10/19/200711/13/2007 DONE
Permanent Occupancy  10/19/2007 DONE
FIRE-Final Inspection10/12/200710/12/200710/12/2007PPASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/11/200710/12/200710/12/2007APASS
DetailsJim Storey
todd Phone #: ###-####
BLD-Final10/10/200710/10/200710/10/2007PNR
DetailsJim Storey
todd Phone #: ###-#### need fire 07-00799/mec 07-02837
FIRE-Final Inspection10/1/200710/1/200710/1/2007PFAIL
DetailsForrest France
Need project related fire alarm and hood suppression system permits finaled prior to life safety approval.
FIRE-Final Inspection9/28/200710/1/200710/1/2007ACANC
DetailsForrest France
###-#### - mike Note: hood final Not ready for inspection per phone call from contractor due to electrical issues.
BLD-Other9/26/200710/1/200710/1/2007ACANC
DetailsJim Storey
mike - hood inspection Phone #: ###-#### should be fire
BLD-Other9/26/20079/27/20079/27/2007APASS
DetailsJim Storey
Todd this inspection is for the celing Phone #: ###-####
BLD-Framing/Rough-in9/26/20079/27/20079/27/2007APART
DetailsJim Storey
Todd Phone #: ###-####
BLD-Other9/25/20079/26/20079/26/2007ADEFR
DetailsJim Storey
mike - kitchen hood Phone #: ###-#### fire requist.
BLD-Aging Inspection8/24/20078/24/20078/31/2007 NR
DetailsJim Storey
ncfi
Print Occupancy Form  6/26/2007 DONE
Override - People Holds  5/25/2007  
Issue PAID IN FULL permit  5/25/2007 DONE
Telephone call  5/24/2007 DONE
t/c w pat mckeegan at ###-#### - permit ready and fees given - also need gc name and rce#
Override - People Holds  5/24/2007  
Permit Ready to Issue  5/24/2007  
Plan assigned to (CJW)3/13/2007 5/23/2007 PASS
5/23/2007 13:59:03 CJW - activity updated through activity BLDA022 from case BLD07-00494.
Routing - PLAN CHECK5/18/2007 5/23/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  5/23/2007  
Received 1 cover transmittal, 2 copies of letter from Pinnacle Engineering (3pgs), 2 copies of sheet H1.0 and taken to Carl Westfall
PLANS/APPL TAKEN TO FRONT DESK  5/23/2007 DONE
Print Occupancy Form  5/23/2007 DONE
Routing - PLAN CHECK4/11/2007 5/18/2007 FAIL
The Structural item was NOT resolved. Called the Architect and told him that I needed the letter from the Structural Engineer and the revised mechanical sheet.
Routing - PLANNING5/18/2007 5/18/2007 PASS
Signed-off by Sarah.
Plan resubmittals received  5/15/2007  
Received 2pg. response letter, and two copies of page T1.0, A1.0, A1.1; taken to Carl Westfall
Routing - FIRE4/5/2007 4/11/2007 PASS
Attached review comments to plans.
1st review completed  4/11/2007 FAIL
Routing - PLAN CHECK3/16/2007 4/5/2007 FAIL
The IBC plan review was started on April 3, 2007 and was finished on April 5, 2007. Revised drawings were required. See the plan review report.
Routing - PLUMBING3/14/2007 3/16/2007 PASS
additional cross connection may be required. verify sink will accept the full discharge of the r,p, or replace with dcva.
Routing - PUBLIC WORKS3/13/2007 3/14/2007 PASS
Pending Assignment by MYS3/2/2007 3/13/2007 DONE
3/13/2007 12:53:59 MYS - activity updated through activity BLDA172 from case BLD07-00494.
Recd Pcfee & Taken To Pln CK  3/2/2007 DONE
Plans ACCEPTED BY PLAN TECH  3/2/2007  
Application received  2/27/2007