Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-00529
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 10TH FLR
Project NameUS BANK-10TH FLR
Customer Number 
ePlanReviewNo
Description
Unico Properties (US BANK PLAZA - 10TH STORY - RESTROOM UPGRADE) This building is fire sprinklered for high-rise. To upgrade the core restrooms located on the 10th story of the US Bank Plaza to be accessible to the disabled. Selective nonstructural demolition within the restrooms is also covered under this permit. Work is to include interior nonbearing walls, relocated or new plumbing fixtures, and interior finishes. The 1-hr corridor/elevator lobby located on the 10th story is required to be maintained. Quick-response fire sprinkler heads are required to be installed within the egress corridor/elevator lobby and within every room opening into the egress corridor/elevator lobby where the door between the room and the egress corridor does not have a 20 minute fire protection rating with closers and latches. A separate fire sprinkler permit is required. The fire sprinkler system within the rest of the 10th story will NOT be upgraded at this time. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system within the core area is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Letter of compliance/Occupancy  8/12/2011 DONE
Third Notice BLD10/1/200710/1/200710/29/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice7/30/20077/30/20079/13/2007 DONE
DetailsDave Hannah
BLD-Final7/18/20077/23/20077/30/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2007 at 3:22:28 PM. Contact: ###-####.
DOC - Permit Finaled7/30/20077/30/20077/30/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection7/25/20077/25/20077/27/2007PPASS
DetailsForrest France
Fire life safety passed inspection.
BLD-Final7/17/20077/18/20077/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2007 at 3:23:58 PM. Contact: ###-####.needs fire life safty final
BLD-Framing/Rough-in5/10/20075/11/20075/11/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2007 at 1:55:28 PM. Contact: ###-####.
Issue PAID IN FULL permit  4/24/2007 DONE
1st review completed  4/19/2007 PASS
Routing - PLAN CHECK4/19/2007 4/19/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/19/2007 DONE
Inspection Record Card- Bld  4/19/2007 DONE
Telephone call  4/19/2007 DONE
left vm for cory nelson ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  4/19/2007 DONE
Plan assigned to (CJW)3/12/2007 4/19/2007 PASS
4/19/2007 14:48:03 CJW - activity updated through activity BLDA022 from case BLD07-00529.
Routing - FIRE4/18/2007 4/19/2007 PASS
Attached review comments to plans.
Routing - PLAN CHECK3/13/2007 4/18/2007 PASS
(4-12-07) Project on hold until further clarrification about fire sprinkler upgrade is received. (4-18-07) Clarification in the form of drawings and letters was received. The plan review was completed. The drawings were approved with 'red lines'.
Plan resubmittals received  4/13/2007 DONE
Received 1 letter of transmittal,1 plan review and 2 copys of sheets A2.0,A3.0 taken to Carl W.
Telephone call  4/12/2007 DONE
Talked with Liz Fitzgerald. Furter clarification is required before processing can proceed.
Routing - PUBLIC WORKS3/12/2007 3/13/2007 PASS
Pending Assignment by MYS3/2/2007 3/12/2007 DONE
3/12/2007 15:44:45 MYS - activity updated through activity BLDA172 from case BLD07-00529.
Recd Pcfee & Taken To Pln CK  3/2/2007  
Plans ACCEPTED BY PLAN TECH  3/2/2007  
Application received  3/2/2007