Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-00531
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 8TH FLR
Project NameUS BANK-8TH FLR
Customer Number 
ePlanReviewNo
Description
(US BANK PLAZA - 8TH STORY RESTROOM UPGRADE) This building is fire sprinklered for high-rise. To upgrade the core restrooms located on the 8th story of the US Bank Plaza to be accessible to the disabled. Selective nonstructural demolition within the restrooms is also covered under this permit. Work is to include interior nonbearing walls, relocated or new plumbing fixtures, and interior finishes. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 8th story are required to comply with the provisions of the 2000 IBC. Existing systems shall be upgraded where necessary, including the installation of quick-response fire sprinklers throughout the 8th story. Separate permits are required for fire sprinkler and fire alarm upgrades. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Letter of compliance/Occupancy  8/12/2011 DONE
Third Notice BLD10/1/200710/1/200710/29/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice7/30/20077/30/20079/13/2007 DONE
DetailsDave Hannah
BLD-Final7/18/20077/23/20077/30/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2007 at 3:22:28 PM. Contact: ###-####.
DOC - Permit Finaled7/30/20077/30/20077/30/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection7/25/20077/25/20077/27/2007PPASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed.
BLD-Final7/17/20077/18/20077/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2007 at 3:22:28 PM. Contact: ###-####. need fire life safty final
BLD-Framing/Rough-in5/10/20075/11/20075/11/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2007 at 1:56:50 PM. Contact: ###-####.
Issue PAID IN FULL permit  4/19/2007 DONE
Routing - PLAN CHECK4/16/2007 4/18/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/18/2007 DONE
Inspection Record Card- Bld  4/18/2007 DONE
Telephone call  4/18/2007 DONE
t/c w cory nelson ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  4/18/2007 DONE
Plan assigned to (CJW)3/12/2007 4/18/2007 PASS
4/18/2007 08:58:14 CJW - activity updated through activity BLDA022 from case BLD07-00531.
Routing - FIRE4/12/2007 4/16/2007 PASS
Attached review comments to plans.
1st review completed  4/16/2007 PASS
Routing - PLAN CHECK3/13/2007 4/12/2007 PASS
The IBC plan review was started and finished on April 12, 2007. The drawings were approved with 'red lines'.
Routing - PUBLIC WORKS3/12/2007 3/13/2007 PASS
Pending Assignment by MYS3/2/2007 3/12/2007 DONE
3/12/2007 16:13:49 MYS - activity updated through activity BLDA172 from case BLD07-00531.
Plans ACCEPTED BY PLAN TECH  3/5/2007  
Application received  3/2/2007  
Recd Pcfee & Taken To Pln CK  3/2/2007