Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-00535
StatusFinaled
Name BRIGHTON CORPORATION
Site Address 2965 S FEATHERLY WY
Project NameVICTORY PLAZA BLD 2
Customer Number 
ePlanReviewNo
Description
(NATIONAL WOOD PRODUCTS - VICTORY PLAZA - BLDG #2) This building is fire sprinklered for area increase. To construct a 24,742 square foot sales, office, and warehouse tenant space. Work is to include interior nonbearing walls, 3 restrooms accessible to the disabled, suspended ceilings, and interior finishes. A separate racking permit is required for the warehouse area. The commodity classification is required to be declared under the racking permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. (See DRH05-00229) **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/5/20077/5/20077/10/2007 DONE
First Notice has not been responded to.
First Notice 6/14/20077/5/2007 DONE
Permanent occupancy UNPAID FEE  6/14/2007 DONE
Perm. Occ. Cert. # 11662 issued 6-14-07 to National Wood Products.
BLD-Final6/11/20076/11/20076/11/2007PPASS
DetailsMike Jordan
darren; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Ok for perm occ.
Code Occupancy Approval6/11/20076/11/20076/11/2007APASS
DetailsScott M.Brown
ALL IN FINAL SIGNED OFF
Permanent Occupancy 6/11/20076/11/2007 DONE
Details
FIRE-Final Inspection6/6/20076/7/20076/7/2007APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection6/5/20076/6/20076/6/2007AFAIL
DetailsTroy Cobbley
Provide correct door hardware from the warehouse that allows free passage as discussed
BLD-Other5/23/20075/24/20075/24/2007APASS
DetailsMike Jordan
darin Note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Grid ok.
BLD-Other5/22/20075/23/20075/23/2007AFAIL
DetailsMike Jordan
Darren/Ceiling - call 1/2 prior to inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Needs additional 12 ga. wires on diffusers and exaust fans.
BLD-Foundation5/21/20075/22/20075/22/2007APART
DetailsMike Jordan
chris ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Loading dock walls. wip. Reinforcement in place, forms are being plumbed.
BLD-Footing5/9/20075/10/20075/10/2007PPASS
DetailsMike Jordan
darin - pour at 1 PM; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Footing for dockwalls.
BLD-Framing/Rough-in4/26/20074/26/20074/26/2007PPASS
DetailsMike Jordan
darren ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Pending plumbing.
Issue PAID IN FULL permit  4/25/2007 DONE
Print Occupancy Form  4/24/2007 DONE
CHANGE STATUS TO (RDY)  4/24/2007  
Telephone call  4/24/2007 DONE
Called Cornel Larson permit ready and fee given / Need G.C. # and R.P. before this permkit is picked up.///DLD
Routing - FIRE4/20/2007 4/23/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK4/23/2007 4/23/2007 PASS
Plans taken to permit desk for issuance on behalf of C. Westfall (mys)
PLANS/APPL TAKEN TO FRONT DESK  4/23/2007 DONE
Plan assigned to (CJW)3/12/2007 4/23/2007 PASS
4/23/2007 16:14:19 MYS - activity updated through activity BLDA022 from case BLD07-00535.
Routing - PLANNING4/19/2007 4/20/2007 PASS
Approved per DRH05-00229 and CZC07-00080.
Plan resubmittals received  4/19/2007  
Received 1 letter of transmittal,1 response,1 fire code review and 3 copys of sheet A-1 taken to Carl W.
1st review completed  4/18/2007 FAIL
Routing - PLAN CHECK3/16/2007 4/18/2007 PASS
The IBC plan review was started on April 16, 2007 and was finished on April 18, 2007. The drawings were approved with 'red lines'.
Routing - FIRE4/18/2007 4/18/2007 FAIL
Emailed and faxed resubmittal items to archtiect. Attached review comments to plans.
Routing - PLAN CHECK4/20/2007 4/10/2007 DONE
Inserted revised drawings. Sent back to fire.
Routing - PLANNING3/15/2007 3/16/2007 FAIL
Sarah Scafer (x refer DRH05-00229) routed plans to Greg.

Applicant must submit DR modification application for proposed exterior changes to building exterior on south for overhead door and loss of parking spaces
Routing - Erosion and Sediment3/14/2007 3/15/2007 PASS
ESC plan approved with attached conditions.
Plan resubmittals received  3/15/2007 DONE
rec'd transmittal letter - 2 sets of sheet#s A-1, A-2, A-5, A-6, MC-1, M-1, M-2, M-3, M-4, M-5, M-6, P-1, P-2, P-3, E-0, E-1, E-2, E-3, E-4, E-5 - taken to Carl Westfall
Routing - PUBLIC WORKS3/12/2007 3/14/2007 PASS
Pending Assignment by MYS3/2/2007 3/12/2007 DONE
3/12/2007 15:11:05 MYS - activity updated through activity BLDA172 from case BLD07-00535.
Recd Pcfee & Taken To Pln CK  3/2/2007  
Plans ACCEPTED BY PLAN TECH  3/2/2007  
Application received  3/2/2007