BLD-Aging Inspection | 1/22/2009 | 1/22/2009 | 1/22/2009 | | CANC |
Tom Arcoraci
|
|
|
|
DOC - Permit Expired | 1/22/2009 | 1/22/2009 | 1/22/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/18/2008 | 11/18/2008 | 11/18/2008 | | NR |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/1/2008 | | DONE |
Barbara Stitt
|
|
|
|
(F) Reprint permit | | | 8/1/2008 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (JCM) | 7/2/2008 | 7/2/2008 | 7/22/2008 | | PASS |
John Menard
|
|
|
7/22/2008 10:09:24 JCM - activity updated through activity BLDA022 from case BLD07-00536.
|
Routing - PLAN CHECK | 7/21/2008 | | 7/22/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2008 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 7/22/2008 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2008 | | DONE |
|
|
|
t/c w dale binning at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/22/2008 | | DONE |
|
|
|
|
Routing - FIRE | 7/21/2008 | | 7/21/2008 | | PASS |
Kenneth R Roule
|
|
|
See attached IFC fire review comments.
|
Routing - PLANNING | 7/16/2008 | | 7/18/2008 | | |
|
|
|
Approved per DR Modification DRH08-00124
|
Plan Reviewer's activity | | | 7/16/2008 | | PASS |
|
|
|
Reveiwed and approved structural and nonstructural aspects associated with a plan modification to add an additional 12 feet to the original 16 foot addition on the south side of an existing convenience store. JCM
|
Routing - PLAN CHECK | 7/2/2008 | | 7/16/2008 | | PASS |
John Menard
|
|
|
|
Plan Modification Accepted | | | 7/2/2008 | | |
|
|
|
plan modification excepted for Bld07-00536 for the redesign to extend backroom an additonal 12' from the originally approved plans under building permit on sheets S-1A, A-1A, A-2A, A-3A, A-4A, A-5A, A-6A, & A-7A. routed to John Menard
|
BLD-Aging Inspection | 3/31/2008 | 3/31/2008 | 3/31/2008 | | PASS |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 12/31/2007 | | DONE |
|
|
|
|
Expiration Notice | 9/10/2007 | 10/1/2007 | 9/25/2007 | | DONE |
Marsha Smylie
|
|
|
|
Telephone call | | | 9/25/2007 | | |
|
|
|
talked to dale binning at ###-#### that permit is ready-still pending with achd..& need r/p
|
Ready Permit EXTENDED | | | 9/25/2007 | | |
|
|
|
|
Telephone call | | | 6/26/2007 | | |
|
|
|
talked to dale binning at ###-#### that permit is ready-still pending with achd..& need r/p
|
Telephone call | | | 5/11/2007 | | DONE |
|
|
|
talked to dale binning at ###-#### that permit is ready-still pending with achd..
|
Routing - Erosion and Sediment | 3/28/2007 | | 3/29/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 3/29/2007 | | 3/29/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/29/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
t/c chuck allumbaugh, the gc, at ###-#### - i called him regarding the c of v - asked if it was correct or would there be any changes and he said that dale binning the architect submits the c of v and that is what he will go by
|
Telephone call | | | 3/29/2007 | | DONE |
|
|
|
t/c w dale binning at ###-#### - permit ready and fees given - also needs rp and achd
|
Permit Ready to Issue | | | 3/29/2007 | | |
|
|
|
|
Plan assigned to (JCM) | 3/2/2007 | | 3/29/2007 | | PASS |
|
|
|
3/29/2007 09:50:55 JCM - activity updated through activity BLDA022 from case BLD07-00536.
|
Routing - PLAN CHECK | 3/23/2007 | | 3/28/2007 | | |
|
|
|
|
Plan resubmittals received | | | 3/28/2007 | | |
|
|
|
received letter of transmittal from b & a eng & "2" sheets of 1 of 1 & "2" booklets for storm water pollution prevention plan/plans taken to John Menard
|
Routing - PLUMBING | 3/19/2007 | | 3/23/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 3/16/2007 | | 3/19/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 3/19/2007 | | |
|
|
|
Received 1pg. response letter to John Menard, 1pg. response letter to Bill VanDegrift, 4pg. specifications on walk-in cooler, and three copies of pages A-2a, A-7a, P-1a; taken to John Menard
|
Plan Reviewer's activity | | | 3/19/2007 | | PASS |
|
|
|
Review and approved resumitted, revised plan sheets.
|
Routing - FIRE | 3/13/2007 | | 3/16/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 3/16/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 3/13/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions.
|
Routing - PLAN CHECK | 3/9/2007 | | 3/13/2007 | | FAIL |
|
|
|
John Menard
|
Routing - PLANNING | 3/8/2007 | | 3/9/2007 | | PASS |
|
|
|
DRH06-00527-Josh Wilson
|
Routing - PLUMBING | 3/7/2007 | | 3/8/2007 | | FAIL |
|
|
|
show location of CDHD required hand sink and prep sink. soda r.p. to be mounted over a floor sink.
|
Routing - Erosion and Sediment | 3/6/2007 | | 3/7/2007 | | FAIL |
|
|
|
ESC plan waiver request denied. Informed applicant. Prior to issuance permit the rp information will be needed.
|
Routing - PUBLIC WORKS | 3/5/2007 | | 3/6/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/2/2007 | | 3/5/2007 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/2/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/2/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/2/2007 | | |
|
|
|
|
Application received | | | 3/2/2007 | | |
|
|
|
|