Third Notice BLD | 6/6/2008 | 6/6/2008 | 7/14/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 2/13/2008 | 2/13/2008 | 4/23/2008 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 2/13/2008 | 2/13/2008 | 2/13/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 2/13/2008 | 2/13/2008 | 2/13/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/22/2007 | 11/22/2007 | 11/23/2007 | | CANC |
Tom Arcoraci
|
|
|
exp 4-08
|
BLD-Final | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | NR |
Tom Arcoraci
|
|
|
kent Note: not intil after 3:00 when school is closed Phone #: ###-#### needs plumb final
|
BLD-Final | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | NR |
Tom Arcoraci
|
|
|
Corey; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs plumb and mech finaled and doc finaled
|
BLD-Final | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | FAIL |
Tom Arcoraci
|
|
|
cn posted
|
FIRE-Final Inspection | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | NR |
Tom Arcoraci
|
|
|
corey ###-#### Please call for before inspection Phone #: ###-####
|
FIRE-Final Inspection | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site and the contractor was not answering his phone.
|
Issue PAID IN FULL permit | | | 5/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2007 | | |
|
|
|
left mess for david blenker at ###-#### that permit is ready & need gc & rce #
|
Inspection Record Card- Bld | | | 4/10/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 4/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/10/2007 | | |
|
|
|
Called David permit ready and fee given Need G.C. and # ///DLD
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/19/2007 | | 4/9/2007 | | PASS |
|
|
|
4/9/2007 15:25:32 JCM - activity updated through activity BLDA022 from case BLD07-00598.
|
Routing - PLAN CHECK | 3/29/2007 | | 4/8/2007 | | PASS |
|
|
|
|
1st review completed | | | 3/29/2007 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 3/28/2007 | | 3/29/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Plan resubmittals requested | | | 3/28/2007 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 3/27/2007 | | 3/28/2007 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLUMBING | 3/20/2007 | | 3/27/2007 | | PASS |
|
|
|
island sink venting must be 6" above flood level before connecting to other vents. 1 1/4" potable water required to the eyewash/shower in the chemistry room. 3" floor drain required at the eyewash/shower in the chemistry room.
|
Routing - PUBLIC WORKS | 3/19/2007 | | 3/20/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/12/2007 | | 3/19/2007 | | DONE |
|
|
|
3/19/2007 12:11:04 MYS - activity updated through activity BLDA174 from case BLD07-00598.
|
Plans ACCEPTED BY PLAN TECH | | | 3/12/2007 | | |
|
|
|
|
Application received | | | 3/9/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/9/2007 | | DONE |
|
|
|
|