First Notice | 2/21/2008 | 2/21/2008 | 3/7/2008 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 2/20/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Jim Sly
|
|
|
craig Phone #: ###-#### Verified letter of approval from STRATA...and verbal approval from Public Works (Rocky). C/C issued.
|
DOC - Permit Finaled | 2/21/2008 | 2/21/2008 | 2/21/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 2/5/2008 | 2/13/2008 | 2/13/2008 | P | NR |
Jim Sly
|
|
|
Need P/W final
|
BLD-Final | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | NR |
Mike Jordan
|
|
|
greg Phone #: ###-####. Needs public works final.
|
Code Occupancy Approval | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | PASS |
Carol Montgomery
|
|
|
|
FIRE-Final Inspection | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 1/18/2008 | 2/5/2008 | 2/5/2008 | A | NR |
Jim Sly
|
|
|
Greg Moran ###-####//please call 30 min prior Need Finals from P/W, Zoning, and Fire/Life. Need final Affidavit letter from special insp agency......Possibly...final letter from Eng.....will determine at final on site inspection.
|
BLD-Footing | 5/29/2007 | 5/29/2007 | 5/29/2007 | P | PART |
Jim Sly
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Small footing for Equip pad....OK pending STRATA insp, tests and appr.
|
BLD-Foundation | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | PART |
Jim Sly
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith OK pending STRATA special insp, tests, and appr.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/18/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/18/2007 | | |
|
|
|
|
Telephone call | | | 5/18/2007 | | DONE |
|
|
|
received phone call from contractor, told him permit is ready and fees
|
Issue PAID IN FULL permit | | | 5/18/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/13/2007 | | 5/18/2007 | | PASS |
|
|
|
5/18/2007 09:03:13 MYS - activity updated through activity BLDA022 from case BLD07-00629.
|
Routing - PLAN CHECK | 5/17/2007 | | 5/18/2007 | | PASS |
|
|
|
Resubmittal received 5/10/07. Approved to follow up plan review by Mike Otto.
|
Routing - Erosion and Sediment | 5/16/2007 | | 5/17/2007 | | PASS |
|
|
|
Resubmittals
ESC plan approved with attached conditions.
|
Routing - PLANNING | 5/17/2007 | | 5/17/2007 | | PASS |
|
|
|
Josh Johnson approved per CUP05-00165.
|
Routing - PUBLIC WORKS | 5/10/2007 | | 5/16/2007 | | PASS |
|
|
|
Resubmittals
|
Plan resubmittals received | | | 5/14/2007 | | |
|
|
|
Received 1 letter of transmittal,2 mauala for light maintenance of stormwater facilities and 3 copys of sheets GRD1 & GRD2 taken to Marlene S.
|
Routing - PLAN CHECK | 3/26/2007 | | 5/10/2007 | | |
|
|
|
Routing resubmittals received on 5/10/2007
|
Plan resubmittals received | | | 5/10/2007 | | |
|
|
|
received "2" sets of stormwater pollution prevention narrative & specs & "2" sets of plans each sheet including SWP3, GRD2, & GRD1--plans taken to Marlene Southard
|
Routing - FIRE | 3/22/2007 | | 3/26/2007 | | PASS |
|
|
|
No seperate IFC review comments attached to plans or permit. Contractor to install a stand alone 1,392 sqft canopy for non permament equipment. Existing FD access acceptable.
|
1st review completed | | | 3/26/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/19/2007 | | 3/22/2007 | | FAIL |
|
|
|
corrections sent to applicant
|
Plan resubmittals requested | | | 3/22/2007 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 3/15/2007 | | 3/19/2007 | | FAIL |
|
|
|
cup05-00165 Cody Riddle
Site plan does not match that approved by conditional use permit. A staff-level modification to the approval will be required.
|
Plan resubmittals received | | | 3/16/2007 | | |
|
|
|
Received copy of original receipet of plan check fee, 5 copies of pages GRD1 & GRD2; taken to Mike Otto
|
Routing - Erosion and Sediment | 3/15/2007 | | 3/15/2007 | | PASS |
|
|
|
ESC plan failed. No narrative or waiver letter included in submittal. Notified applicant (Greg Moran ###-####).
|
Routing - PUBLIC WORKS | 3/14/2007 | | 3/15/2007 | | FAIL |
|
|
|
Requires drainage plans; Contact Brian Murphy ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 3/13/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/13/2007 | | |
|
|
|
|
Application received | | | 3/13/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/13/2007 | | DONE |
|
|
|
|