Third Notice BLD | 10/30/2007 | 10/30/2007 | 12/10/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 10/1/2007 | 10/1/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/12/2007 | 9/12/2007 | 10/1/2007 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 9/11/2007 | 9/12/2007 | 9/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/11/2007 at 3:08:16 PM. Contact: ###-####.
|
DOC - Permit Finaled | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/22/2007 | 8/22/2007 | 8/22/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | FAIL |
Troy Cobbley
|
|
|
The fire sprinkler permit needs to be finaled, three fire extinguishers added in the cafeteria and the three existing exit signs in the cafeteria repaired.
|
BLD-Conference | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/17/2007 at 11:51:13 AM. Contact: ###-####. checked 6 bathrooms ok
|
BLD-Final | 8/17/2007 | 8/20/2007 | 8/20/2007 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/17/2007 at 11:53:05 AM. Contact: ###-####. needs all inspections signed final
|
Telephone call | | | 8/20/2007 | | DONE |
|
|
|
Jackie,
Confirming our telcon this afternoon, the Sprinkler plans are approved and ready to pick up. As soon as they are picked up, the permit status will change to ISSUED, which will allow you to schedule the sprinkler inspection for tomorrow.
Dave Hanneman is agreeable to the terms and conditions of your written request for occupancy of the TI space with the exception of the music room and locker rooms, in which two rooms the emergency lighting will not be completed. As per your letter, item 4, you agreed to not allow any student or faculty access to these two areas until the lighting upgrades are done and satisfactorily inspected and signed off.
Please remember this PARTIAL approval is only for Fire and is conditioned upon satisfactory fire alarm, fire sprinkler, fire/life safety inspections being satisfactorily completed prior to occupancy. If any other Division work is not completed and Finaled, you will also need their approval for Early Occupancy. Call me on my cell, if you have any questions or further issues.
Sam Rogers
###-####
|
Telephone call | | | 8/17/2007 | | DONE |
|
|
|
teleconf with Jackie Phelps, Ray Hoovering, Dave Hanneman, Sam Rogers, clarified status of remaining work and coordinated sprinkler, alarm, life safety and building inspections for next Monday' advised Troy of the plan. Refer to attached letter from J. Phelps dated 8/16/07 for further details.
|
BLD-Framing/Rough-in | 8/15/2007 | 8/16/2007 | 8/16/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/15/2007 at 5:03:14 PM. Contact: (208) grid ok
|
BLD-Framing/Rough-in | 7/30/2007 | 7/30/2007 | 7/30/2007 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/30/2007 at 7:32:42 AM. Contact: ###-####. wip ok
|
Telephone call | | | 7/26/2007 | | DONE |
|
|
|
CM company called to corroborate Shiloh Fire Protections claim that plan modifications had been delivered to the PDS on Jan 19th. According to the permit activity, no plan modifications have been recieved by PDS from Shiloh FP for Bishop Kelly high school FIR07-00561.
|
BLD-Framing/Rough-in | 7/10/2007 | 7/10/2007 | 7/10/2007 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 7/10/2007 at 7:30:22 AM. Contact: ###-####. OK to cover select framing......
|
BLD-Conference | 6/22/2007 | 6/25/2007 | 6/25/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/22/2007 at 2:36:10 PM. Contact: ###-####. roof top unit framing wip ok
|
Plan assigned to (R_H) | 4/11/2007 | | 5/22/2007 | | PASS |
|
|
|
5/22/2007 08:45:08 RMH - activity updated through activity BLDA022 from case BLD07-00680.
|
Routing - PLAN CHECK | 5/7/2007 | | 5/22/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 5/22/2007 | | DONE |
|
|
|
|
1st review completed | | | 5/22/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2007 | | DONE |
|
|
|
t/c w richard honsinger ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 5/22/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/22/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/15/2007 | | |
|
|
|
Received transmittal letter, 2pg. response letter, 2003 IECC Envelope Complicance Cert. (8 1/2 " x 11"), two copies of supplemental structural calcs for new roof top units, and three copies of pages a0.11, a2.16, a5.11, s1.00, s2.01, s2.02, m2.01, m2.02; taken to Ron Hill
|
1st review completed | | | 5/7/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 5/4/2007 | | 5/7/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 4/2/2007 | | 5/4/2007 | | FAIL |
|
|
|
Faxed and mailed requirements to the architect.
|
Plan assigned to (MLO) | 3/29/2007 | | 4/11/2007 | | DEFR |
|
|
|
REASSIGNED TO RON HILL by M.Southard on 4/11/2007
|
Routing - PLUMBING | 4/3/2007 | | 4/3/2007 | | PASS |
|
|
|
move R.P.s for the biology lab outside lab(over janitors sink?) premise protection will need to be verified.
|
Routing - PLUMBING | 3/30/2007 | | 4/2/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 3/29/2007 | | 3/30/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/20/2007 | | 3/29/2007 | | DONE |
|
|
|
3/29/2007 08:22:38 MYS - activity updated through activity BLDA174 from case BLD07-00680.
|
Plans ACCEPTED BY PLAN TECH | | | 3/20/2007 | | |
|
|
|
|
Application received | | | 3/19/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/19/2007 | | DONE |
|
|
|
|