Case Summary (BLD) | | | 3/11/2014 | | DONE |
|
|
|
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 1/11/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/12/2007 | 11/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/12/2007 | | |
|
|
|
|
BLD-Final | 10/8/2007 | 10/9/2007 | 10/9/2007 | A | PASS |
Dave Hannah
|
|
|
rock Phone #: ###-#### ok for perm occ
|
BLD-Final | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | FAIL |
Dave Hannah
|
|
|
ROCK Phone #: ###-#### needs ADA signage and ceiling grid spreader bars ect
|
FIRE-Final Inspection | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, inspection passed.
|
BLD-Framing/Rough-in | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | PASS |
Dave Hannah
|
|
|
Rock; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
|
Print Occupancy Form | | | 5/2/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 5/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2007 | | |
|
|
|
Called Curtis permit ready
|
Issue & PRINT to be Invoiced | | | 5/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/1/2007 | | DONE |
|
|
|
John Maulin CSHQA to discuss proceedure for or policy used by the Building Official to determine code interpretations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2007 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 3/29/2007 | | 5/1/2007 | | PASS |
|
|
|
5/1/2007 16:23:06 DRS - activity updated through activity BLDA022 from case BLD07-00690.
|
Routing - PLAN CHECK | 4/24/2007 | | 5/1/2007 | | PASS |
|
|
|
Approved as noted and attached. To permit desk to issue.
|
Plan Reviewer's activity | | | 5/1/2007 | | DONE |
|
|
|
Interpretation by George slane, Building Official, concerning tactile signs and accessibility requirements for exam and proceedure room millwork with sinks. TACTILE EXIT SIGNS ARE REQUIRED AT EXIT DISCHARGE EVEN IF A LIGHTED EXIT SIGN IS NOT REQUIRED PER EXCEPTIONS OF 1011.1 IBC. INTERPRETATIONS THAT THE MILLWORK AND SINK IN THE EXAM AND PROCEEDURE ROOMS ARE EMPLOYEE ORK AREAS AND DO NOT NEED TO COMPLY FOR ACCESSIBLITY.
|
Telephone call | | | 4/30/2007 | | DONE |
|
|
|
Concerning e-mails from Kermit Robinson, ICC Technical Staff, sent to John Maulin & Teresa Preston. Sent copy to George slane for interpretation and copy to Kim Paarlberg, ICC Technical Staff, for her opinion.
|
Plan Reviewer's activity | | | 4/30/2007 | | DONE |
|
|
|
E-mail from Kimberly Paarlberg, ICC Tech Staff saying she agreed with Kermit Robinsons opinion of counter and sinks in exam & proceedure rooms being employee work areas and not requiring accessiblity. The rooms need to be on an accessible route so they can be entered and exited which these are.
|
Plan resubmittals requested | | | 4/24/2007 | | DONE |
|
|
|
Faxed copy of remaining code items needing to be corrected to Teresa Preston. Followed up by e-mail telling her a fax was sent and to let me know if she did not receive it.
|
Routing - PLAN CHECK | 4/12/2007 | | 4/24/2007 | | FAIL |
|
|
|
Resubmittals inserted into original plans. Accessibility items for sink depth, clear floor space at sinks and tactile exit sign were incorrectly addressed. Faxed copy of remaining items to Teresa with follow up notification by e-mail.
|
Plan resubmittals received | | | 4/23/2007 | | |
|
|
|
Received 1 cover transmittal, 1 response to plan reveiw comments, 2 pages (1set) of countertop lavatory specs, 1 copy of plan reiew report, 2 copies of sheets A0.2, A2.1, A5.1, A5.4, A5.5 and taken to Dan Stuart
|
Routing - FIRE | 4/9/2007 | | 4/12/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 4/12/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/2/2007 | | 4/9/2007 | | FAIL |
|
|
|
Resubmittals required. Copy of review e-mailed to architect. Routing to fire code analyst.
|
Plan resubmittals requested | | | 4/9/2007 | | DONE |
|
|
|
Copy of plan review to Teresa Preston, CSHQA.
|
Routing - PLUMBING | 3/30/2007 | | 4/2/2007 | | PASS |
|
|
|
additional cross connection protection may be required. notes 1&2 page P-2.1- pipe hub drain and R.P. to cabinet under S-1.
|
Routing - PUBLIC WORKS | 3/29/2007 | | 3/30/2007 | | PASS |
|
|
|
|
Routing - Addressing | 3/29/2007 | | 3/29/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/19/2007 | | 3/29/2007 | | DONE |
|
|
|
3/29/2007 11:16:39 MYS - activity updated through activity BLDA168 from case BLD07-00690.
|
Plans ACCEPTED BY PLAN TECH | | | 3/20/2007 | | |
|
|
|
|
Application received | | | 3/19/2007 | | |
|
|
|
|