Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD07-00693
StatusFinaled
Name BAKER CONSTRUCTION
Site Address 6586 S FEDERAL WAY
Project NameCOLUMBIA TOWN CENTER
Customer Number 
ePlanReviewNo
Description
(Baklap Ventures Retail Shops - Shell and Two Vanilla Finish Spaces) - To construct a new 11,955 square foot, one story, commercial shell building and related site improvements. This building will be constructed of masonry exterior walls, concrete slab floors, steel roof joist and metal roof deck. This shell building designed for four future tenant spaces, three retail spaces and one A-3 Occupancy fitness center. This permit will aslo include the vanilla finish for two 1,430 square foot vanilla finished tenant spaces, each with one accessible restroom. This building is not fire sprinkled and has been reviewed as nonseparated uses. No A2 Occupancies are allowed in this building unless separated by two hour fire barrier walls or fire walls completely separating the A2 Occupancy from the remainder of the building. This is shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM (Note: Grading & site utilities installed under BLD07-01084)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/20071/31/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice11/1/200711/1/200711/13/2007 DONE
DetailsJim Storey
BLD-Final11/1/200711/1/200711/1/2007PPASS
DetailsJim Storey
Phil; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
DOC - Permit Finaled11/1/200711/1/200711/1/2007PPASS
DetailsJim Storey
Code Occupancy Approval10/25/200710/25/200710/25/2007PPASS
DetailsMichael Garner
site inspection complete - parking and landscaping finished according to approved plans - PASS
PubWorks Occupancy Approval10/24/200710/24/200710/24/2007 DONE
BLD-Final10/16/200710/17/200710/17/2007PPART
DetailsJim Storey
phil Phone #: ###-#### temp pending handrail at back stair not part of any exit system only due to grade transition.
FIRE-Final Inspection10/16/200710/17/200710/17/2007APASS
DetailsTroy Cobbley
life safety passed.
Plan assigned to (JCM)9/17/2007 9/27/2007 PASS
9/27/2007 06:57:27 JCM - activity updated through activity BLDA022 from case BLD07-00693.
Routing - PLUMBING9/19/2007 9/27/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/27/2007 DONE
Inspection Record Card- Bld  9/27/2007 DONE
Telephone call  9/27/2007 DONE
t/c w phil at ###-#### - permit ready and fees given
Permit Ready to Issue  9/27/2007 DONE
CHANGE STATUS TO (ISS)  9/27/2007  
previously issued
BLD-Other9/20/20079/20/20079/20/2007PPASS
DetailsJim Storey
Phil, ###-#### - dropped ceiling inspection ceilling ok need spreader bars at final
Routing - PUBLIC WORKS9/18/2007 9/19/2007 PASS
Routing PW Environmental9/19/2007 9/19/2007 PASS
Original shell and core DRH06-0491 had PW condition imposed (11/06) to provide common grease line to all tenat spaces w/ minimum of one grease interceptor provided. Owner/builder failed to comply. This resubmittal is modification to shell&core plans to provide one 1500 gallon GI for single tenant space. Any future food service tenants will be required to install seperate grease abatement equipment.
Routing - PLAN CHECK9/17/2007 9/18/2007  
BLD-Framing/Rough-in9/17/20079/17/20079/17/2007PPASS
DetailsJim Storey
phil Phone #: ###-#### canopy ok to cover/ first layer 2 hr wall gyp screw atchment ok for cover.
Plan Modification Accepted  9/17/2007  
Plan Modification accepted for Bld07-00693 to add a 4" drain line & grease interceptor for a restaurant TI; submitted on page P1.0; routed to John Menard
BLD-Framing/Rough-in8/22/20078/23/20078/23/2007APASS
DetailsJim Storey
phil Phone #: ###-####
(F) Reprint permit  8/15/2007 DONE
Inspection Record Card- Bld  8/15/2007 DONE
BLD-Other8/1/20078/1/20078/1/2007PNR
DetailsJim Storey
dry wall inspection on fire wall--jack; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD-Footing7/9/20077/10/20077/9/2007ACANC
DetailsJim Storey
phil; Phone #: ###-#### Note: mid morning please
BLD-Footing7/9/20077/9/20077/9/2007PCANC
DetailsJim Storey
phil; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang needs to reschedule midmorning 7/10/2007
BLD-Other6/20/20076/20/20076/21/2007PPART
DetailsJim Storey
tom - masonary grout; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang firs lift of grout rebar ok pending si report.
BLD-Foundation6/11/20076/12/20076/12/2007APART
DetailsJim Storey
tom - stem wall - late afternoon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith wip ok
BLD-Foundation6/11/20076/11/20076/11/2007PDEFR
DetailsJim Storey
tom - stem wall - late afternoon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith to 6/12 am
(F) Reprint permit  6/5/2007  
BLD-Footing6/1/20076/4/20076/4/2007APASS
DetailsJim Storey
Aaron; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Inspection Record Card- Bld  6/1/2007 DONE
Issue & PRINT to be Invoiced  6/1/2007 DONE
Routing - PLAN CHECK4/13/2007 5/30/2007 PASS
Plan resubmittals received  5/30/2007  
Received letter of transmittal,two copies of response letter and two copies of pages C1, SD1, SD2, SD3, SD4, SD5; taken to John Menard
Plan resubmittals received  5/30/2007  
Received 1 record of servey taken to John M.
PLANS/APPL TAKEN TO FRONT DESK  5/30/2007 DONE
Plan assigned to (JCM)4/4/2007 5/30/2007 PASS
5/30/2007 14:55:17 JCM - activity updated through activity BLDA022 from case BLD07-00693.
Plan Reviewer's activity  5/21/2007 DONE
Reviewed proposed record of survey w/John. Looks ok so sent it on routing. MSouthard (x refer ROS07-00036)
Plan Reviewer's activity  5/15/2007 PASS
Reviewed and approved structural and nonstructural plan revisions. JCM
Plan resubmittals received  5/11/2007  
received letter of transmittal from petersen staggs arch & (1) copy for comments (8) pages & 4 sets of comments (15) pages each from petersen staggs & "2" booklets for plan review comments from tru engineering. also "2" sets of plans with "2" sheets each of C1, SD1, SD7, SO, S1, S2, S3, S4, S5, S6, S7, S8, A1, A2, A3, A4, A5, A6, A7, P1.O, P2.O, P3.O, MO.O, MO.1, M1.O, M2.O, M3.O--plans taken to John Menard
Plans ACCEPTED BY PLAN TECH  4/30/2007 DONE
Received application to seperate out Grading & Drainage
1st review completed  4/13/2007 FAIL
Routing - FIRE4/12/2007 4/13/2007 PASS
Attached review comments to plans.
Plan resubmittals requested  4/12/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK4/3/2006 4/12/2007 FAIL
john Menard
Plan resubmittals requested  4/6/2007 DONE
Faxed the architect a copy of the plan review from the consulting structural engineer requesting revisions. JCM
Plan assigned to (MLO)3/20/2007 4/4/2007 DEFR
GREEN TAG (plans include shell and 2 tenant improvements)
4/4/07 - REASSIGNED TO JOHN MENARD ON 4/4/07 BY MYS.
Routing - PLANNING3/30/2007 4/3/2007 PASS
Josh Wilson drh06-00491
Routing Off Site - STRUCTURAL3/20/2007 4/2/2007 FAIL
called action courier for pickup
Routing - PLUMBING3/22/2007 3/30/2007 PASS
per plans and 2003 upc
Routing - Erosion and Sediment3/21/2007 3/22/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/20/2007 3/21/2007 PASS
Routing - PLANNING Land Div3/20/2007 3/20/2007 PASS
Plan routing begun/NEW & ADDTN  3/20/2007  
Pending Assignment by MYS3/19/2007 3/20/2007 DONE
3/20/2007 09:20:40 JCM - activity updated through activity BLDA174 from case BLD07-00693.
Recd Pcfee & Taken To Pln CK  3/20/2007  
Plans ACCEPTED BY PLAN TECH  3/20/2007  
Application received  3/19/2007