Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00702
StatusFinaled
Name INTEGRATED BUILDING GROUP
Site Address 2108 S DENVER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 1805 s.f. Two story single family dwelling (747 s.f. First story / 1058 s.f. Second story) with a 204 s.f. Covered front porch, a 108 s.f. Covered upper floor deck, and a 264 s.f. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1C zoning district, building setbacks, and DRH06-490 per Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/15/200711/16/200711/16/2007PPASS
DetailsJim Storey
shawn Phone #: ###-####
DOC - Permit Finaled11/16/200711/16/200711/16/2007PPASS
DetailsJim Storey
BLD-Final11/8/200711/9/200711/9/2007PFAIL
DetailsJim Storey
shawn Phone #: ###-#### need fire access doors in ceilling of garage.
Code Occupancy Approval  11/9/2007 PASS
DetailsWm. Michael Meloy
Inspection made 11/8/2007
BLD-Energy code compliance7/25/20077/26/20077/26/2007PPASS
DetailsJim Storey
ROY Phone #: ###-####
BLD-Framing/Rough-in7/24/20077/25/20077/25/2007APASS
DetailsJim Storey
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Framing/Rough-in7/23/20077/24/20077/24/2007PCANC
DetailsJim Storey
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Inspection Record Card- Bld  6/12/2007 DONE
Case Summary (BLD)  6/12/2007 DONE
BLD-Foundation6/8/20076/8/20076/8/2007PPASS
DetailsJim Storey
around noon, if possible; Scott; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Footing6/7/20076/7/20076/7/2007PPASS
DetailsJim Storey
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Conference6/7/20076/7/20076/7/2007PCANC
DetailsJim Storey
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang Inspection cancelled from web by: Victoria Apatang
BLD-Footing6/5/20076/6/20076/6/2007PCANC
DetailsMike Jordan
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Issue PAID IN FULL permit  6/5/2007 DONE
Inspection Record Card- Bld  6/4/2007 DONE
Telephone call  6/4/2007 DONE
t/c w shawn at integrated building group ###-#### - permit ready and fees given
Permit Ready to Issue  6/4/2007  
Plan assigned to (SRZ)4/2/20074/2/20075/30/2007 PASS
5/30/2007 15:18:26 SRZ - activity updated through activity BLDA022 from case BLD07-00702.
Routing - PLAN CHECK5/29/2007 5/30/2007 PASS
Case Summary (BLD)  5/30/2007  
PLANS/APPL TAKEN TO FRONT DESK  5/30/2007 DONE
Routing - PLANNING5/24/2007 5/29/2007 PASS
Plan resubmittals received  5/24/2007  
recieved complete new set of plans; routed to Josh Wilson
Plan resubmittals received  5/8/2007  
Received new complete set of plans; taken to Sam Z.
Telephone call  4/13/2007  
Telephone call  4/11/2007 DONE
telephone call. left message
Case Summary (BLD)  4/11/2007  
Plan resubmittals received  4/5/2007  
Plan resubmittals requested  4/2/2007  
Telephone call  4/2/2007 DONE
Requested resubmittals from Designer and Applicant. (SRZ)
Pending Assignment by SRZ3/20/2007 4/2/2007 DONE
4/2/2007 10:11:49 SRZ - activity updated through activity BLDA160 from case BLD07-00702.
Routing - PLAN CHECK3/22/2007 4/2/2007 FAIL
Plans failed Plan review. Resubmittals needed to complete plan review. Correction list: Fire rated wall detail for Master wall pop-out, Fire rated eve details, Wall bracing called out on plans as per Boise city policy, Call out typical window headers, specify a header over garage door, call out Smoke detector locations. Contractor registration number. (SRZ)
Routing - PUBLIC WORKS3/21/2007 3/22/2007 PASS
Routing - PLANNING3/20/2007 3/21/2007 PASS
Routed to Josh Wilson DRH06-00490 3/21/07
Routing - Addressing3/20/2007 3/20/2007 PASS
Application received  3/20/2007  
Routing - PLAN CHECK4/2/2007   PEND
Plan review pending Upper deck framing engineering. Demo has to be complete to releases permits. (SRZ)