Permit Information
Permit NumberBLD07-00712
StatusFinaled
Name JAMES W ELMER CONSTRUCTION
Site Address 8300 W EMERALD ST
Project NameREI
Customer Number 
ePlanReviewNo
Description
**(REI)** To remodel the interior and exterior of an existing 25123 sq ft retail tenant store per approved plans & DRH07-00192. Work to include, construction of a new storefront, removal of interior partitions, counters, plumbing fixtures and miscellaneous finishes, remodel the entire retail showroom area, remove existing racking A SEPARATE PERMIT WILL BE REQUIRED for any additional new racking systems that are over eight feet in height, construction of a new trash enclosure, all new restroom fixtures and finishes, installation of all new lighting, miscellaneous related interior finishes. This building is fully fire sprinkled any alterations or modifications to the sprinkler system shall be maintained and installed per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/23/20084/23/20085/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Second Notice BLD4/23/20084/23/20085/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice3/7/20083/7/20084/23/2008 DONE
DetailsMike Jordan
BLD-Final3/6/20083/7/20083/7/2008APASS
DetailsMike Jordan
terry Phone #: ###-####
DOC - Permit Finaled3/7/20083/7/20083/7/2008PPASS
DetailsMike Jordan
All issues have been resolved, double leaf doors are now code compliant. Letter of comliance was issued verified all signatures. Contractor to fax final letter from special insp. agency.
FIRE-Final Inspection3/6/20083/6/20083/7/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection11/20/200711/21/200711/21/2007AFAIL
DetailsTroy Cobbley
Repair exit signs, provide emergency lights in the stockroom, provide exit sign at the main exit and provide approved hardware at the main exit.
BLD-Final11/20/200711/20/200711/20/2007PNR
DetailsMike Jordan
jake Phone #: ###-####
BLD-Framing/Rough-in10/30/200710/30/200710/30/2007PPASS
DetailsMike Jordan
jake Phone #: ###-####
BLD-Framing/Rough-in10/19/200710/19/200710/19/2007PPASS
DetailsMike Jordan
jake Phone #: ###-####. Recieved and reviewed special insp. reports as well as a letter from engineer of record stating that majority of criteria set forth has been met and that inspections have met the specifications as set forth on sheet S1.0 of the approved plans. Also performed framing inspection of steel studs for new store front. Noted that all bracing for parapet to existing roof is not yet complete. Gave contractor ok to resume work and to make certain to get remainder of special insp. Also noted that contractor is going to replace double leaf door to make it code compliant.
BLD-Conference10/18/200710/18/200710/18/2007AFAIL
DetailsMike Jordan
Met on site with contractor and specail inspector. Also recieved copy of letter from engineer of record of the inspection requirements that need to be completed. Also issued a written c/n to contractor regarding the locks on doulble leaf door.
BLD-Conference10/15/200710/15/200710/15/2007AFAIL
DetailsMike Jordan
Spoke with with structural engineer of record to inform him of the lack of structural inspections on new store front. Noted to engineer that letter from him acceptinf all in place work to date would be required prior to allowing the contractor to continue work on store front. Contractor to get all special inspections necessary and other other inspections necessary to fullfill structural enginneers requirements so that acceptance letter can be issued. Also noted that new double leaf doors installed at main enterance needs to have a lock indicator installed and automatic flush bolt, the seperate lock on the opposite leaf must be removed.
BLD-Conference10/12/200710/12/200710/12/2007PFAIL
DetailsMike Jordan
Noted no inspection done on framing or footings to date from Boise City or special insp. agency. Issued a c/n notice to super on site (Jake) stating to stop work on store front, hire special insp. agency and contact structural engineer of record. A meeting is to be set up with Boise city Inspector, special insp. agency, contractor and engineer before further work can resume.
Issue PAID IN FULL permit  7/17/2007 DONE
Plan assigned to (R_H)4/24/20074/24/20077/10/2007 PASS
7/10/2007 10:11:13 RMH - activity updated through activity BLDA022 from case BLD07-00712.
Routing - PLANNING7/5/2007 7/10/2007 PASS
Routed to Sara for sign off... 7/5/07 Approved.
Routing - PLAN CHECK7/10/2007 7/10/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/10/2007 DONE
Print Occupancy Form  7/10/2007  
Telephone call  7/10/2007 DONE
e-mailed Amy Diekevers w/Precision Permits that permit is ready, fee and need GC and RCE#
Permit Ready to Issue  7/10/2007 DONE
Routing - PUBLIC WORKS7/3/2007 7/5/2007 PASS
Routing - PLAN CHECK7/5/2007 7/5/2007 PEND
Routing PW Solid Waste7/2/2007 7/3/2007 PASS
Plan resubmittals received  6/29/2007  
received 3 copies of pages A0.0, A1.0, A1.2, A2.0, S0.1, S2.0; taken to Ron Hill
Routing - Erosion and Sediment6/21/2007 6/22/2007 PASS
ESC plan waiver request approved with attached conditions. NEED RP PRIOR TO ISSUANCE OF PERMIT.
1st review completed  6/21/2007 FAIL
Routing - FIRE6/20/2007 6/21/2007 PASS
Attached IFC Review Comments to plans.
Routing - PLANNING Land Div6/20/2007 6/20/2007 PASS
Routing PW Solid Waste6/8/2007 6/11/2007 FAIL
Trash/recycling trucks must have direct drive-on access to containers, and gates must open 180 degrees. Trash enclosure is undersized for automated service which requires a clear 11' gate opening. Enclosure must have a pedestrian entrance so that employees may access containers without opening the large gates.
Routing PW Sewer Rating6/8/2007 6/8/2007 PASS
Case Summary (BLD)  6/8/2007 DONE
Routing - Addressing6/8/2007 6/8/2007 PASS
Routing - PLAN CHECK4/24/2007 6/8/2007 PEND
Telephone call  4/24/2007 DONE
Received e-mail from Amy Diekevers DRH07-00192 has been created.
Plans ACCEPTED BY PLAN TECH  3/21/2007 DONE
Per Ron Hill, he spoke to applicant and agreed with them and Cody Riddle to review the building plans and design review concurrently. Waiting for P & Z to recieve DR application and create case before route to plan review. I e-mailed Amy Diekevers (applicant) and informed her of this status.
Application received  3/20/2007  
Recd Pcfee & Taken To Pln CK  3/20/2007 DONE