Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00735
StatusFinaled
Name BRIGHTON PROPERTIES LLC
Site Address 2817 S FEATHERLY WAY
Project NameVIC PARK BUILDING #4
Customer Number 
ePlanReviewNo
Description
Vic Park Building #4- (Shell) - To construct a new 32,350 square foot, one story, shell building and related site improvements. This building will be constructed of concrete slab floor, concrete tilt-up exterior walls and steel joist roof system. There will be a 130 square foot Mechanical/Electrical Room constructed under this permit. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvment permit will be required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/9/20081/9/20081/18/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice11/29/200711/29/20071/9/2008 DONE
DetailsMike Jordan
BLD-Final11/28/200711/29/200711/29/2007APASS
DetailsMike Jordan
DARIN Phone #: ###-####
DOC - Permit Finaled11/29/200711/29/200711/29/2007PPASS
DetailsMike Jordan
Letter of compliance issued, verified all signatures.
Code Occupancy Approval11/28/200711/28/200711/28/2007PPASS
DetailsScott M.Brown
OK FOR FINAL
FIRE-Final Inspection11/27/200711/27/200711/27/2007PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection11/26/200711/26/200711/26/2007PFAIL
DetailsTroy Cobbley
The exit discharge lighting needs to be repaired.
BLD-Final11/19/200711/20/200711/20/2007ACANC
DetailsMike Jordan
Darren Phone #: ###-####. canc. by contractor.
BLD-Final10/16/200710/17/200710/17/2007ACANC
DetailsMike Jordan
DARIN nOTE: PLEASE CALL 1/2 HR PRIOR TO INSPECTION Phone #: ###-####
BLD-Framing/Rough-in10/17/200710/17/200710/17/2007APASS
DetailsMike Jordan
DARIN nOTE: PLEASE CALL 1/2 HR PRIOR TO INSPECTION Phone #: ###-####. Steel framing for mech/riser room and soffits for store fronts. ok.
BLD-Conference9/26/20079/27/20079/27/2007ADONE
DetailsMike Jordan
darren - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Other8/16/20078/17/20078/17/2007APART
DetailsMike Jordan
darin Note: rebar Phone #: ###-####. Reinforcement for conc. tilt panels #9-17
BLD-Footing7/18/20077/19/20077/19/2007PPART
DetailsMike Jordan
darren; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. wip. East, west and south perimeter footings.
BLD-Other7/11/20077/12/20077/12/2007PPART
DetailsMike Jordan
DARIN NOTE: REBAR Phone #: ###-####wip. Reinforcement for concrete tilt panels 1-8 and 18-33.
BLD-Footing6/19/20076/20/20076/21/2007PPART
DetailsMike Jordan
darren; Phone #: ###-#### Internet Inspection Request from: Victoria Apatangwip. Project is recieving special insp.
(F) Reprint permit  6/7/2007  
Issue PAID IN FULL permit  6/6/2007 DONE
Telephone call  5/7/2007 DONE
t/c w cornell larson ###-#### - permit ready and fees given - also need ACHD, RP, GC name and RCE# - also informed him that per Brian Murphy in Public Works, they are due a refund on PWK07-00046 of $378.00 and will have to go through PW
Permit Ready to Issue  5/7/2007 DONE
Routing - PLAN CHECK5/3/2007 5/4/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/4/2007 DONE
Inspection Record Card- Bld  5/4/2007 DONE
Plan assigned to (JCM)3/26/2007 5/4/2007 PASS
5/4/2007 09:08:57 JCM - activity updated through activity BLDA022 from case BLD07-00735.
Routing - FIRE5/2/2007 5/3/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK4/10/2007 5/2/2007  
Plan resubmittals received  5/2/2007 DONE
Received 1 letter of transmittal,1 review,1 building permit fire code review 3 copys of sheets SP-1,C-2.1,C-2.2,C-3 taken to John M
Plan Reviewer's activity  5/2/2007 DONE
Insert revised plans for fire comments and route to fire.
Telephone call  4/17/2007 DONE
The fire marshal, Dave Hanneman, has agreed to the installtion of one addition fire hydrant located at the southeast lanscape island at building #4. The spacing between hydrants has been approved.
Routing - FIRE4/4/2007 4/10/2007 FAIL
Faxed and emailed resubmittal items to architect. Attached review comments to plans.
1st review completed  4/10/2007 FAIL
Routing Off Site - STRUCTURAL3/26/2007 4/9/2007 PASS
Called Action Courier for pick up on 3/26/07 @ 10:50am BAS - Received letter from consulting structural engineer approving plans. JCM
Routing - PLAN CHECK4/4/2007 4/4/2007 PASS
Routing - PLANNING4/2/2007 4/4/2007 PASS
Approved per DRH06-00397 and DRH07-00019
Routing - PLUMBING3/29/2007 4/2/2007 PASS
per plans and 2003 upc
Routing - Erosion and Sediment3/28/2007 3/29/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/26/2007 3/28/2007 PASS
Routing - PLANNING Land Div3/26/2007 3/26/2007 PASS
Application received  3/23/2007  
Plans ACCEPTED BY PLAN TECH  3/23/2007  
Recd Pcfee & Taken To Pln CK  3/23/2007 DONE