(AMERISUITES - LOBBY REMODEL) To remodel the first floor entry lobby area, enlarge the dining area and renovating an existing suite and convert it to the prep kitchen. NOTE: This building is fully fire sprinklered with a NFPA 13 system and is used for area increase. All construction shall be per the approved plans and attached comment list. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/9/20081/9/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice12/17/200712/17/20071/9/2008 DONE
DetailsMike Jordan
BLD-Final12/17/200712/17/200712/17/2007PPASS
DetailsMike Jordan
robert Phone #: ###-####
DOC - Permit Finaled12/17/200712/17/200712/17/2007PPASS
DetailsMike Jordan
Letter of compliance issued. Reinspected ceiling grid ok. Also reviewed final letter from special insp. agency. One item noted, no welder certs. Contractor did have a copy of welder certs, all were up to date. Noted that roll up door was deleted, no door was placed at pass thru room. After meeting with Jim Story on job site, it was decided that this one hr. wall could be moved back to east side of kitchen and make that the rated corridor wall. Also recieved revised drawing from architect noted the changes.
BLD-Final12/17/200712/17/200712/17/2007PCANC
DetailsMike Jordan
FIRE-Final Inspection12/14/200712/17/200712/17/2007APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Final12/14/200712/17/200712/17/2007ACANC
DetailsMike Jordan
Robert; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final12/13/200712/14/200712/14/2007PNR
DetailsMike Jordan
robert Phone #: ###-####. Needs life/safety.
BLD-Other12/11/200712/12/200712/12/2007PFAIL
DetailsMike Jordan
Robert This inspection is for t-bar Phone #: ###-####. Needs to remove pop rivets and repair wire to meet the 1:6.
BLD-Framing/Rough-in11/30/200711/30/200711/30/2007PPART
DetailsMike Jordan
bryan Phone #: ###-####. Fur out wall in main lobby area only.
BLD-Framing/Rough-in11/26/200711/27/200711/27/2007APART
DetailsMike Jordan
john Phone #: ###-####. Still need UL tech data for wonder board on 1hr wall assembly, Noted that roll down firedoor needs to be side hinged to meet egress.
BLD-Final11/23/200711/26/200711/26/2007PPART
DetailsMike Jordan
John Phone #: ###-####. ok to use lobby area only. Putty pads installed on new 1hr wall. ok to cover.
FIRE-Final Inspection11/23/200711/26/200711/26/2007APART
DetailsTroy Cobbley
See the city approved for the lobby location, circled with yellow hilighter, that is ok to occupy. It has also been signed with todays date.
BLD-Final11/20/200711/21/200711/21/2007PCANC
DetailsMike Jordan
jon - partial final Phone #: ###-####
BLD-Framing/Rough-in11/21/200711/21/200711/21/2007PPART
DetailsMike Jordan
jon - partial final Phone #: ###-####. 1hr. wall. ok to one side only.
FIRE-Final Inspection11/20/200711/21/200711/21/2007AFAIL
DetailsTroy Cobbley
The contractor wanted a partial fire life safety for the remodeled area of the main lobby. I found emergency lights not operating, sprinkler heads with plastic shipping clips still installed and one sprinkler head deflector bent.
BLD-Final11/16/200711/19/200711/19/2007ANR
DetailsMike Jordan
ROBERT Phone #: ###-####. Needs to have insp. fire insp. first. Contractor was contacted and notified.
FIRE-Final Inspection11/15/200711/16/200711/16/2007PCANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 11/15/2007 at 5:03:07 PM. Contact: ###-####. I called the contact number and left a message about the fire sprinkler permit only having a rough-in inspection and no final at this time. Without a fire sprinkler final there can be no fire life safety sign off.
BLD-Other11/8/200711/8/200711/9/2007PCANC
DetailsMike Jordan
john - partial drywall - one side drywall Phone #: ###-####
BLD-Framing/Rough-in11/7/200711/8/200711/8/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/7/2007 at 5:54:20 PM. Contact: ###-####. - partial only . interior steel stud walls at new front desk area. pend. elec. Already one sided when on site.
BLD-Conference9/25/20079/26/20079/26/2007ADONE
DetailsMike Jordan
richard Phone #: ###-####
Issue PAID IN FULL permit  9/10/2007  
Permit Ready to Issue  8/30/2007  
Telephone call  8/30/2007 DONE
left mess for Doug Heinrichs at ###-#### that permit is ready & gave fees
Routing - PLAN CHECK8/20/2007 8/29/2007 PASS
Plan resubmittals received  8/29/2007  
received "2" sets of plans with each sheet C1, A1, S1, & S2 & including 1 revision #3 sheet & 3 pages from bsw international --plans taken to Mike Phillips
PLANS/APPL TAKEN TO FRONT DESK  8/29/2007 DONE
Print Pending Permit.LaserJet4  8/29/2007 DONE
Case Summary (BLD)  8/29/2007 DONE
Inspection Record Card- Bld  8/29/2007 DONE
Plan assigned to (M_P)4/5/2007 8/29/2007 PASS
8/29/2007 14:48:42 M_P - activity updated through activity BLDA022 from case BLD07-00772.
Routing - PLAN CHECK8/8/2007 8/20/2007 FAIL
Called architect and left message. Need informaiton about roll down fire door and location of fire assemblies for the one-hour floor/ceiling.
Routing - PLAN CHECK8/3/2007 8/8/2007 FAIL
Second review completed. Need additional informaiton for structural and fire assemblies. Called and left message for Billie Bear to contact me to discuss these deficiencies. Additional revie will be requried prior to issuance of this permit.
Plan resubmittals received  8/6/2007  
received 2 copys of sheets C1,A1,A2,A2.1,A3,E2,M2,S1,D2 taken to Mike P.
Routing - FIRE8/1/2007 8/3/2007 PASS
Attached updated review comments and letter from applicant to plans.
Plan resubmittals received  8/3/2007 DONE
Letter from responsible person, Jud Severns - Assistant GM -Amersuites Boise, verifying the contents to be cooked on conveyor type oven.
Routing - PLAN CHECK5/4/2007 8/1/2007  
Routing to fire for their review.
Telephone call  7/31/2007 DONE
Spoke with repreentative from Amersuites regarding Fire Code resubmittal items.
Telephone call  7/9/2007 DONE
lft ms for tyson smith that unable to issue fire permit due the bld is under review
Telephone call  6/8/2007 DONE
Left message w/Wes Gerber of Hyatt Hotels on the status of the permit. It appears plumbing and PW resubmittals were received and approved, but nothing has been received for building or fire code items.
Routing - PLUMBING5/4/2007 5/4/2007 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS5/3/2007 5/4/2007 PASS
Routing - PLAN CHECK4/26/2007 5/3/2007  
Routing to P.W. and Plumbing.
Plan resubmittals received  5/1/2007  
Received three copies of transmittal, response letter addressed to Walt Baumgardner from Billie Bear, copy of e-mail from Walt to Billie, copy of plumbing plan review, 1pg. info on grease interceptor, pages P1 & P3; taken to Mike Philllips
Routing - FIRE4/25/2007 4/26/2007 FAIL
Emailed & faxed resubmittal items to architect.
1st review completed  4/26/2007 FAIL
Routing - PLAN CHECK4/23/2007 4/25/2007 FAIL
Sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
Routing - PLUMBING4/9/2007 4/23/2007 FAIL
public works pretreatment approval required prior to plumbing review.
Routing - PUBLIC WORKS4/5/2007 4/9/2007 FAIL
This site is within the jurisdiction of West Boise Sewer District. Outside 1500 gal. interceptor will be required. All kitchen greywater lines including dishwasher and pre-rinse station routed to grease trap.
Contact Walter Baumgartner at ###-####
Pending Assignment by MYS3/27/2007 4/5/2007 DONE
4/5/2007 12:20:57 MYS - activity updated through activity BLDA170 from case BLD07-00772.
Plans ACCEPTED BY PLAN TECH  3/29/2007  
Application received  3/27/2007  
Recd Pcfee & Taken To Pln CK  3/27/2007 DONE
Third Notice BLD3/5/20083/5/2008   
Second Notice has not been responded to.