Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/17/2007 | 12/17/2007 | 1/9/2008 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Mike Jordan
|
|
|
robert Phone #: ###-####
|
DOC - Permit Finaled | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Mike Jordan
|
|
|
Letter of compliance issued. Reinspected ceiling grid ok. Also reviewed final letter from special insp. agency. One item noted, no welder certs. Contractor did have a copy of welder certs, all were up to date. Noted that roll up door was deleted, no door was placed at pass thru room. After meeting with Jim Story on job site, it was decided that this one hr. wall could be moved back to east side of kitchen and make that the rated corridor wall. Also recieved revised drawing from architect noted the changes.
|
BLD-Final | 12/17/2007 | 12/17/2007 | 12/17/2007 | P | CANC |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 12/14/2007 | 12/17/2007 | 12/17/2007 | A | PASS |
Troy Cobbley
|
|
|
fire life safety passed
|
BLD-Final | 12/14/2007 | 12/17/2007 | 12/17/2007 | A | CANC |
Mike Jordan
|
|
|
Robert; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Final | 12/13/2007 | 12/14/2007 | 12/14/2007 | P | NR |
Mike Jordan
|
|
|
robert Phone #: ###-####. Needs life/safety.
|
BLD-Other | 12/11/2007 | 12/12/2007 | 12/12/2007 | P | FAIL |
Mike Jordan
|
|
|
Robert This inspection is for t-bar Phone #: ###-####. Needs to remove pop rivets and repair wire to meet the 1:6.
|
BLD-Framing/Rough-in | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PART |
Mike Jordan
|
|
|
bryan Phone #: ###-####. Fur out wall in main lobby area only.
|
BLD-Framing/Rough-in | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. Still need UL tech data for wonder board on 1hr wall assembly, Noted that roll down firedoor needs to be side hinged to meet egress.
|
BLD-Final | 11/23/2007 | 11/26/2007 | 11/26/2007 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. ok to use lobby area only. Putty pads installed on new 1hr wall. ok to cover.
|
FIRE-Final Inspection | 11/23/2007 | 11/26/2007 | 11/26/2007 | A | PART |
Troy Cobbley
|
|
|
See the city approved for the lobby location, circled with yellow hilighter, that is ok to occupy. It has also been signed with todays date.
|
BLD-Final | 11/20/2007 | 11/21/2007 | 11/21/2007 | P | CANC |
Mike Jordan
|
|
|
jon - partial final Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2007 | 11/21/2007 | 11/21/2007 | P | PART |
Mike Jordan
|
|
|
jon - partial final Phone #: ###-####. 1hr. wall. ok to one side only.
|
FIRE-Final Inspection | 11/20/2007 | 11/21/2007 | 11/21/2007 | A | FAIL |
Troy Cobbley
|
|
|
The contractor wanted a partial fire life safety for the remodeled area of the main lobby. I found emergency lights not operating, sprinkler heads with plastic shipping clips still installed and one sprinkler head deflector bent.
|
BLD-Final | 11/16/2007 | 11/19/2007 | 11/19/2007 | A | NR |
Mike Jordan
|
|
|
ROBERT Phone #: ###-####. Needs to have insp. fire insp. first. Contractor was contacted and notified.
|
FIRE-Final Inspection | 11/15/2007 | 11/16/2007 | 11/16/2007 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 11/15/2007 at 5:03:07 PM. Contact: ###-####. I called the contact number and left a message about the fire sprinkler permit only having a rough-in inspection and no final at this time. Without a fire sprinkler final there can be no fire life safety sign off.
|
BLD-Other | 11/8/2007 | 11/8/2007 | 11/9/2007 | P | CANC |
Mike Jordan
|
|
|
john - partial drywall - one side drywall Phone #: ###-####
|
BLD-Framing/Rough-in | 11/7/2007 | 11/8/2007 | 11/8/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/7/2007 at 5:54:20 PM. Contact: ###-####. - partial only . interior steel stud walls at new front desk area. pend. elec. Already one sided when on site.
|
BLD-Conference | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | DONE |
Mike Jordan
|
|
|
richard Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/10/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 8/30/2007 | | |
|
|
|
|
Telephone call | | | 8/30/2007 | | DONE |
|
|
|
left mess for Doug Heinrichs at ###-#### that permit is ready & gave fees
|
Routing - PLAN CHECK | 8/20/2007 | | 8/29/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/29/2007 | | |
|
|
|
received "2" sets of plans with each sheet C1, A1, S1, & S2 & including 1 revision #3 sheet & 3 pages from bsw international --plans taken to Mike Phillips
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2007 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/29/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/29/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2007 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/5/2007 | | 8/29/2007 | | PASS |
|
|
|
8/29/2007 14:48:42 M_P - activity updated through activity BLDA022 from case BLD07-00772.
|
Routing - PLAN CHECK | 8/8/2007 | | 8/20/2007 | | FAIL |
|
|
|
Called architect and left message. Need informaiton about roll down fire door and location of fire assemblies for the one-hour floor/ceiling.
|
Routing - PLAN CHECK | 8/3/2007 | | 8/8/2007 | | FAIL |
|
|
|
Second review completed. Need additional informaiton for structural and fire assemblies. Called and left message for Billie Bear to contact me to discuss these deficiencies. Additional revie will be requried prior to issuance of this permit.
|
Plan resubmittals received | | | 8/6/2007 | | |
|
|
|
received 2 copys of sheets C1,A1,A2,A2.1,A3,E2,M2,S1,D2 taken to Mike P.
|
Routing - FIRE | 8/1/2007 | | 8/3/2007 | | PASS |
|
|
|
Attached updated review comments and letter from applicant to plans.
|
Plan resubmittals received | | | 8/3/2007 | | DONE |
|
|
|
Letter from responsible person, Jud Severns - Assistant GM -Amersuites Boise, verifying the contents to be cooked on conveyor type oven.
|
Routing - PLAN CHECK | 5/4/2007 | | 8/1/2007 | | |
|
|
|
Routing to fire for their review.
|
Telephone call | | | 7/31/2007 | | DONE |
|
|
|
Spoke with repreentative from Amersuites regarding Fire Code resubmittal items.
|
Telephone call | | | 7/9/2007 | | DONE |
|
|
|
lft ms for tyson smith that unable to issue fire permit due the bld is under review
|
Telephone call | | | 6/8/2007 | | DONE |
|
|
|
Left message w/Wes Gerber of Hyatt Hotels on the status of the permit. It appears plumbing and PW resubmittals were received and approved, but nothing has been received for building or fire code items.
|
Routing - PLUMBING | 5/4/2007 | | 5/4/2007 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 5/3/2007 | | 5/4/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/26/2007 | | 5/3/2007 | | |
|
|
|
Routing to P.W. and Plumbing.
|
Plan resubmittals received | | | 5/1/2007 | | |
|
|
|
Received three copies of transmittal, response letter addressed to Walt Baumgardner from Billie Bear, copy of e-mail from Walt to Billie, copy of plumbing plan review, 1pg. info on grease interceptor, pages P1 & P3; taken to Mike Philllips
|
Routing - FIRE | 4/25/2007 | | 4/26/2007 | | FAIL |
|
|
|
Emailed & faxed resubmittal items to architect.
|
1st review completed | | | 4/26/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/23/2007 | | 4/25/2007 | | FAIL |
|
|
|
Sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
|
Routing - PLUMBING | 4/9/2007 | | 4/23/2007 | | FAIL |
|
|
|
public works pretreatment approval required prior to plumbing review.
|
Routing - PUBLIC WORKS | 4/5/2007 | | 4/9/2007 | | FAIL |
|
|
|
This site is within the jurisdiction of West Boise Sewer District. Outside 1500 gal. interceptor will be required. All kitchen greywater lines including dishwasher and pre-rinse station routed to grease trap.
Contact Walter Baumgartner at ###-####
|
Pending Assignment by MYS | 3/27/2007 | | 4/5/2007 | | DONE |
|
|
|
4/5/2007 12:20:57 MYS - activity updated through activity BLDA170 from case BLD07-00772.
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2007 | | |
|
|
|
|
Application received | | | 3/27/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2007 | | DONE |
|
|
|
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | | | |
|
|
|
Second Notice has not been responded to.
|