Permit Information
Permit NumberBLD07-00840
StatusFinaled
Name R SQUARED CONSTRUCTION
Site Address 13059 W PERSIMMON LN
Project NameLINEBERRY ORTHODONTICS
Customer Number 
ePlanReviewNo
Description
(Lineberry Orthodontics) To construct a new 3,570 square foot, one story, wood framed orthodontics office and relates site improvments. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/5/20083/5/20084/1/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/9/20081/9/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 12/26/20071/9/2008 DONE
Permanent Occupancy UNPAID FEE  12/26/2007 DONE
BLD-Final12/20/200712/21/200712/21/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/20/2007 at 12:28:46 PM. Contact: ###-####.
OK for Perm Occ.
BLD-Final11/16/200711/16/200711/19/2007PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/16/2007 at 11:30:24 AM. Contact: ###-####.
OK for Temp Occ.....OK for Perm, when Ele, Plm, P/W, and Code Enforce Perms.
Code Occupancy Approval11/16/200711/16/200711/16/2007PPASS
DetailsCarol Montgomery
Complies with DRH07-00020. Pass

I questioned the colors used - signed off per the approved plans on site. (These plans listed "Sugar Cookie" and "Buckwheat" as the approved colors w/white trim.)
FIRE-Final Inspection11/15/200711/15/200711/15/2007PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final11/14/200711/15/200711/15/2007PNR
DetailsJim Sly
randy Phone #: ###-####
Need Fire P/W Code Enf. ACHD
BLD-Final11/14/200711/15/200711/15/2007ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2007 at 3:45:38 PM. Contact: ###-####.
Need Fire.
FIRE-Final Inspection11/14/200711/15/200711/15/2007AFAIL
DetailsTroy Cobbley
Not all of the exit signs are functional and others are missing.
FIRE-Final Inspection11/14/200711/14/200711/14/2007PCANC
DetailsTroy Cobbley
See entry for this mornings inspection. Overbooked for this afternoon.
FIRE-Final Inspection11/14/200711/14/200711/14/2007AFAIL
DetailsTroy Cobbley
Project was not ready for inspection. Exit lights were not finished, duct detectors and remote annunciators had not been installed and the building address was not installed. Inspection was stopped.
BLD-Final11/14/200711/14/200711/14/2007PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2007 at 6:36:51 AM. Contact: ###-####.
Need fire final
BLD-Other11/6/200711/7/200711/7/2007PPASS
DetailsJim Sly
DENTON NOTE: CEILING GRID Phone #: ###-####
BLD-Energy code compliance9/18/20079/19/20079/19/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/18/2007 at 4:02:24 PM. Contact: ###-####.
BLD-Framing/Rough-in9/17/20079/17/20079/17/2007PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/17/2007 at 7:50:51 AM. Contact: ###-####.
BLD-Framing/Rough-in9/6/20079/7/20079/7/2007APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/6/2007 at 3:31:00 PM. Contact: ###-####.
Ext.shear nailing OK
BLD-Framing/Rough-in8/21/20078/22/20078/22/2007PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/21/2007 at 2:30:45 PM. Contact: ###-####.
Roof OK to cover.
Plan resubmittals received  7/25/2007  
received 1 transmittal, 1 letter and 3 copys of sheet P3.0 ( this permit was issued 6-19-07) put plans in Bill Vandegrift in box.
BLD-Foundation7/2/20077/3/20077/3/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 7/2/2007 at 12:20:00 PM. Contact: ###-####.
BLD-Footing6/28/20076/29/20076/29/2007APASS
DetailsJim Sly
danton Phone #: ###-####
No special insp req.
BLD-Footing6/28/20076/29/20076/28/2007PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/28/2007 at 9:45:56 AM. Contact: ###-####. Inspection cancelled from web by: Patricia Smith
(F) Reprint permit  6/20/2007  
Issue PAID IN FULL permit  6/19/2007  
CHANGE STATUS TO (RDY)  5/17/2007 DONE
Telephone call  5/17/2007  
Called left message for Billy Strite permit ready and fee given///dld
Routing - PLUMBING5/9/2007 5/16/2007 PASS
Routing - PLAN CHECK5/16/2007 5/16/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/16/2007 DONE
Print Occupancy Form  5/16/2007 DONE
Plan assigned to (JCM)4/4/2007 5/16/2007 PASS
5/16/2007 11:39:14 JCM - activity updated through activity BLDA022 from case BLD07-00840.
Plan resubmittals received  5/10/2007 DONE
received 1 transmittal,and 3 sheets of A1.2 taken to John M.
Routing - PLAN CHECK4/26/2007 5/9/2007  
Plan Reviewer's activity  5/9/2007 FAIL
Inserted resubmitted plan sheets and reviewed and approved structural revisions and failed architectural revisions.
Plan resubmittals requested  5/9/2007 DONE
E-mailed the architect requesting two copies of revised plan sheet A1.2. JCM
Plan resubmittals received  5/8/2007 DONE
Received 1 transmittal,1 plan review report,1 bulding comments response, 1 response from Tikker Engineering,1 review letter to Joe Thompson, 3 calcs and 2 copys of sheet P2.0 and 3 copys of sheets G1.1,A1.1,A4.1,A5.1,A6.1,A7.1,A7.2,S1.1,S2.1,S5.1 S7.1 P1.0,P3.0 taken to John M.
Routing - FIRE4/25/2007 4/26/2007 PASS
Attached review comments to plans.
1st review completed  4/26/2007 FAIL
Routing - PLAN CHECK4/25/2007 4/25/2007 FAIL
John Menard
Routing - PLANNING4/23/2007 4/25/2007 PASS
DRH07-00020 Greg Johnson
Routing - PLUMBING4/13/2007 4/23/2007 FAIL
provide adequate drainage for the R.P.s. water hammer arrestors are required for the flushometer valves. additional cross connection protection may be required. where med. gas and vacuum piping must be installed below slab piping shall be installed in an accessable trench or with in a conduit, no joints are allowed with in the conduit. grade vacuum piping 1/4" per 10'.
Routing Off Site - STRUCTURAL4/4/2007 4/18/2007 FAIL
Received a comment letter from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/18/2007 DONE
Faxed the architect a copy of the comment letter from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  4/16/2007 DONE
E-mailed the arhcitect a copy of the plan review requesting revisions.
Routing - Erosion and Sediment4/11/2007 4/13/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS4/5/2007 4/11/2007 PASS
Routing - PLANNING Land Div4/4/2007 4/5/2007 PASS
Telephone call  4/4/2007  
Called Action Couriers for pick up
Application received  4/4/2007  
Pending Assignment by MYS4/4/2007 4/4/2007 DONE
4/4/2007 14:36:22 JCM - activity updated through activity BLDA166 from case BLD07-00840.
Recd Pcfee & Taken To Pln CK  4/4/2007 DONE
Plans ACCEPTED BY PLAN TECH  4/4/2007  
Plan routing begun/NEW & ADDTN  4/4/2007