Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/7/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/8/2007 | 11/13/2007 | | DONE |
|
|
|
|
BLD-Final | 10/5/2007 | 10/8/2007 | 10/8/2007 | A | PASS |
Dave Hannah
|
|
|
c r marvin Phone #: ###-#### ok for perm occ
|
Permanent Occupancy UNPAID FEE | | | 10/8/2007 | | DONE |
|
|
|
|
BLD-Final | 9/21/2007 | 9/24/2007 | 9/26/2007 | P | PART |
Dave Hannah
|
|
|
C R MARVIN Phone #: ###-#### nOTE: LATE AS POSSIBLE ok to move into phase two walked project with contractor he will call for final after he finishs several items
|
FIRE-Final Inspection | 9/21/2007 | 9/24/2007 | 9/24/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, need to provide signage above the main entry/exit door and install indicator on the egress side.
|
BLD-Other | 9/18/2007 | 9/19/2007 | 9/20/2007 | P | PART |
Dave Hannah
|
|
|
C R BARVIN nOTE: GRID Phone #: ###-#### ceiling grid phase two ok to cover
|
BLD-Framing/Rough-in | 9/11/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Dave Hannah
|
|
|
metal ceiling; C.R. Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover hard ceiling
|
BLD-Framing/Rough-in | 9/10/2007 | 9/11/2007 | 9/12/2007 | P | NR |
Dave Hannah
|
|
|
C R MARVIN Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2007 | 9/10/2007 | 9/11/2007 | P | PART |
Dave Hannah
|
|
|
CR MARVIN Phone #: ###-#### walls ph 2 ok to cover
|
FIRE-Final Inspection | 9/4/2007 | 9/5/2007 | 9/6/2007 | P | PART |
Forrest France
|
|
|
Final pending completion of the scope of work at the south office area, manual thumbturn at the NW exit door to be removed.
|
BLD-Final | 9/4/2007 | 9/5/2007 | 9/5/2007 | P | PART |
Dave Hannah
|
|
|
CR Marvin; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to move into phase one
|
BLD-Framing/Rough-in | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PART |
Dave Hannah
|
|
|
c.r. marvin - ceiling grid Phone #: ###-#### ceiling grid phase one ok to cover
|
BLD-Final | 8/22/2007 | 8/23/2007 | 8/24/2007 | P | NR |
Dave Hannah
|
|
|
C.R., early p.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Meeting | | | 8/23/2007 | | DONE |
|
|
|
Denied "partial occupancy" request. "Walk-in" meeting with "CR" Marvin, Supt for PKC Const requesting approval to occupy a portion of the TI space, while they work on another portion of the space. I denied the request because fire alarms are not completed and plans were being resubmitted by the vendor at the moment of our discussion, the sprinkler permit had just been issued the day before for 33 new sprinkler heads (which he said had been installed overnight), and no life safety inspections had been completed as the scheduled inspection was cancelled for "not ready".
|
CHANGE STATUS TO (ISS) | | | 7/26/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/26/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 6/26/2007 | 6/27/2007 | 6/27/2007 | A | PASS |
Dave Hannah
|
|
|
cr marvin Phone #: ###-#### ok to cover walls
|
BLD-Conference | 6/11/2007 | 6/12/2007 | 6/12/2007 | A | PART |
Dave Hannah
|
|
|
cr marvin-- ###-#### cell-
|
Issue PAID IN FULL permit | | | 6/11/2007 | | |
|
|
|
|
Print Occupancy Form | | | 5/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/22/2007 | | DONE |
|
|
|
left vm for mike michaels at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 5/22/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 5/2/2007 | | 5/21/2007 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 4/18/2007 | | 5/21/2007 | | PASS |
|
|
|
5/21/2007 15:08:55 M_P - activity updated through activity BLDA022 from case BLD07-00845.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/16/2007 | | |
|
|
|
Received by mail transmittal, 2pg. response letter, 1pg. letter from owner of building with floor plan of 1st and 2nd floor (8 1/2" x 11"), copy of Boise City Plan Review Comments, two copies of pages G1.1 & A1.3; taken to Mike Phillips
|
Routing - PLAN CHECK | 4/23/2007 | | 5/2/2007 | | FAIL |
|
|
|
Second reveiw failed, sent correction report to the architect. Requesting additional information to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 5/1/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of response letter from New Dimension of Design (7 pgs), 2 copies of response letter from KLH Engineers (2 pgs), 2 copies of sheets G1.0, A1.0, SP1.0, A1.1, A1.4, A2.0, A4.1, E1.1, M1.1 and taken to Mike Phillips
|
1st review completed | | | 4/23/2007 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 4/20/2007 | | 4/23/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 4/13/2007 | | 4/20/2007 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional information to be submtted for further review prior to issuing permit.
|
Plan assigned to (CJW) | 4/12/2007 | | 4/18/2007 | | DEFR |
|
|
|
Reassigned to Mike Phillips by MSouthard on 4/18/2007.
|
Routing - PUBLIC WORKS | 4/12/2007 | | 4/13/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 4/4/2007 | | 4/12/2007 | | DONE |
|
|
|
4/12/2007 12:05:10 MYS - activity updated through activity BLDA172 from case BLD07-00845.
|
Routing - PLANNING | 4/4/2007 | | 4/4/2007 | | PASS |
|
|
|
CZC07-00076- Sarah Shafer
|
Application received | | | 4/4/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/4/2007 | | |
|
|
|
|