Permit Information
Permit NumberBLD07-00851
StatusFinaled
Name HALE DAVID
Site Address 1402 W GROVE ST
Project NameLINEN BUILDING
Customer Number 
ePlanReviewNo
Description
(LINEN EVENT CENTER - LINEN BUILDING) The building is fire sprinklered for story increase. To create a 4,171 square foot event center on the 1st story of the Linen Building (2,717 square foot assembly room on the 1st story, 560 square foot assembly room on the 1st story mezzanine, and 894 square foot restrooms and storage). Work is to include interior nonbearing walls, 2 restrooms accessible to the disabled, an interior open stairway, and finishes. This building was renovated under permit BLD06-00500. The elevator, 2nd story stairways, basement stairways and shafts, concrete steps and ramp at 14th Street, windows, glass doors, roof insulation and covering, and seismic upgrade were done under that permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. DRH06-00039 & CAA07-00057 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/7/2017 DONE
Case Summary (BLD)  11/13/2014 DONE
Case Summary (BLD)  1/3/2014 DONE
DetailsChristina Prado
Third Notice BLD10/30/200710/30/200712/19/2007 DONE
Second Notice has not been responded to.
Second Notice BLD10/17/200710/17/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/24/200710/17/2007 DONE
Code Occupancy Approval9/24/20079/24/20079/24/2007PPASS
DetailsJoe R Venneman
Permanent Occupancy UNPAID FEE  9/24/2007 DONE
BLD-Final9/19/20079/20/20079/21/2007PPASS
DetailsDave Hannah
scott Phone #: ###-#### ok for perm occ
FIRE-Final Inspection9/19/20079/20/20079/20/2007PPASS
DetailsForrest France
Required corrections are finished, fire life safety final inspection passed.
FIRE-Final Inspection9/18/20079/19/20079/20/2007AFAIL
DetailsForrest France
See correction notice for a list of defficient items, also need to final project related fire sprinkler permit prior to life safety final approval.
BLD-Final9/18/20079/19/20079/20/2007PFAIL
DetailsDave Hannah
Scott; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs fire sign offs walked project with owner
Case Summary (BLD)  8/22/2007  
BLD-Framing/Rough-in6/11/20076/11/20076/12/2007PPASS
DetailsDave Hannah
scott - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover rest rooms
BLD-Framing/Rough-in6/6/20076/6/20076/6/2007PPART
DetailsDave Hannah
Scott; call half-hour prior to inspection, please.; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover int walls of offices will recheck restroom walls
Issue PAID IN FULL permit  5/25/2007 DONE
Routing - PLAN CHECK5/23/2007 5/24/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/24/2007 DONE
Print Occupancy Form  5/24/2007 DONE
Telephone call  5/24/2007 DONE
t/c w lois at hale development ###-#### - permit ready and fees given
Permit Ready to Issue  5/24/2007  
Plan assigned to (CJW)4/12/2007 5/24/2007 PASS
5/24/2007 08:33:53 CJW - activity updated through activity BLDA022 from case BLD07-00851.
Routing - PLANNING5/22/2007 5/23/2007 PASS
To Sarah

Approved per CAA07-0057 and DRH06-00039 Modification #1.
Routing - PLAN CHECK5/21/2007 5/22/2007 DONE
Sent to Planning.
Routing - PLUMBING5/17/2007 5/21/2007 PASS
per plans and 2003 upc
Routing - PLAN CHECK5/8/2007 5/17/2007 PASS
Completed the resubmittal review. Drawings approved.
Routing - PUBLIC WORKS5/17/2007 5/17/2007 DONE
Sent back for potential sewer rating change. Credits cover fees.
Plan resubmittals received  5/15/2007  
Receveived transmittal, 1pg. response letter, two copies of structural calcs for roof top unit weights, two copies of pages A0.0, A2.0, A3.0, A8.0, F1.0, F1.1, F1.2, S.2.2, M1.1, M2.1, M2.2, E0.0, E2.0F, E2.0L, E2.0R, E2.0S, E3.0, E3.1, E3.2, E3.3, E3.4; taken to Carl Westfall
Plan resubmittals received  5/14/2007  
received "2" sets of structural calculations for the mezzanine stair for the linen bld/ plans taken to Carl Westfall
1st review completed  5/8/2007 FAIL
Routing - FIRE5/7/2007 5/8/2007 PASS
Attached review comments to plans.
Routing - PLAN CHECK4/16/2007 5/7/2007 FAIL
The IBC plan review was started on May 3, 2007 and was finished on May 7, 2007. Revised drawings were required. See the plan review report.
Routing - PLANNING4/13/2007 4/16/2007 FAIL
Sarah Schafer DRH06-00039 Mod #1 and CAA07-00057

Once CAA07-00057 is assigned and reviewed, staff will know if the parcel and use have adequate parking or if additional parking is required. The analyst for CAA07-00057 will need to review this application.
Routing - PUBLIC WORKS4/12/2007 4/13/2007 PASS
Pending Assignment by MYS4/6/2007 4/12/2007 DONE
4/12/2007 12:26:59 MYS - activity updated through activity BLDA172 from case BLD07-00851.
Plans ACCEPTED BY PLAN TECH  4/6/2007  
Recd Pcfee & Taken To Pln CK  4/5/2007 DONE
Application received  4/5/2007