BLD-Final | 6/19/2008 | 6/19/2008 | 6/19/2008 | P | PASS |
Dave Hannah
|
|
|
cory - as early as possible please Phone #: ###-#### ok for c.c
|
BLD-Final | 6/17/2008 | 6/18/2008 | 6/19/2008 | P | NR |
Dave Hannah
|
|
|
cory Phone #: ###-####
|
DOC - Permit Finaled | | | 6/19/2008 | | DONE |
Barbara Stitt
|
|
|
Letter of compliance issued 6-19-08 see scanned documents
|
FIRE-Final Inspection | 6/11/2008 | 6/12/2008 | 6/12/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for compliance, shell life safety finaled.
|
FIRE-Final Inspection | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | FAIL |
Forrest France
|
|
|
Provide approved hardware at the north exit doors (all three), post signage at the main entry/exit doors, provide missing building address numbers on a contrasting backround as discussed, also reviewed tenant permit life safety items including EM lighting, exit signs, duct detectors, fire extinguishers, etc.
|
FIRE-Final Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | NR |
Forrest France
|
|
|
Discussed shell building requirements regarding fire life safety issues.
|
Code Occupancy Approval | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found that the complex has been completed according to approved plans/permits - PASS
|
BLD-Final | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | FAIL |
Dave Hannah
|
|
|
Corey Phone #: ###-#### needs other trades to final
|
BLD-Energy code compliance | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
BLD-Framing/Rough-in | 6/9/2008 | 6/10/2008 | 6/10/2008 | A | PASS |
Dave Hannah
|
|
|
Corey Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2008 | 5/21/2008 | 5/22/2008 | P | PART |
Dave Hannah
|
|
|
Corey; Phone #: ###-####, as early p.m. as possible Internet Inspection Request from: Cathy Weisshaupt still needs letter from engineer on connections and shell
|
BLD-Conference | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PART |
Dave Hannah
|
|
|
cory - after 3:00 please Phone #: ###-#### plans on site ok to start ti but still have issues on shell and core
|
BLD-Framing/Rough-in | 5/6/2008 | 5/7/2008 | 5/7/2008 | A | FAIL |
Jim Storey
|
|
|
cory Phone #: ###-#### - after 10:00 please no aproved plan on site/ need si reports with engineering for changes as well as insp. of bolting.
|
Inspection Record Card- Bld | | | 10/2/2007 | | DONE |
|
|
|
|
BLD-Conference | 9/4/2007 | 9/4/2007 | 9/5/2007 | P | PASS |
Dave Hannah
|
|
|
Per our conversation this morning-plumbing inspector thinks they may be lacking some inspection???
|
BLD-Foundation | 5/22/2007 | 5/23/2007 | 5/23/2007 | A | PASS |
Dave Hannah
|
|
|
Brian ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
(F) Reprint permit | | | 5/23/2007 | | |
|
|
|
|
BLD-Footing | 5/22/2007 | 5/22/2007 | 5/22/2007 | P | PASS |
Dave Hannah
|
|
|
Brian ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Issue PAID IN FULL permit | | | 5/22/2007 | | DONE |
|
|
|
|
Telephone call | | | 5/16/2007 | | |
|
|
|
lft vm with rocky ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/16/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/15/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/14/2007 | | DONE |
|
|
|
received 2 copys of sheet E-1 taken to John M.
|
Plan Reviewer's activity | | | 5/14/2007 | | PASS |
|
|
|
Inserted revised plans reviewed and approved and routed to front desk for issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/14/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/1/2007 | | 5/14/2007 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 4/9/2007 | | 5/14/2007 | | PASS |
|
|
|
5/14/2007 15:38:50 JCM - activity updated through activity BLDA022 from case BLD07-00855.
|
Plan Reviewer's activity | | | 5/2/2007 | | FAIL |
|
|
|
Inserted revised plans and reviewed structural and nonstructural revisions. I approved the structural revisions and failed the energy revisions.
|
Plan resubmittals requested | | | 5/2/2007 | | DONE |
|
|
|
E-mailed the architect with a request for additional revisions.
|
1st review completed | | | 5/1/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 4/30/2007 | | 5/1/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 4/27/2007 | | 4/30/2007 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 4/30/2007 | | |
|
|
|
received 1 -plan review comments,3 - structural calcs,1- response,
3 copys of sheets S-1,S-4,S-5 and 2 -copys of sheets COVER,A1.A2.1,A3.1,A6.1,A6.2,A6.3,A6.4,A6.5,A7.1,A7.2,EC1.1,EC1.2 taken to John M.
|
Routing - PLANNING | 4/24/2007 | | 4/27/2007 | | PASS |
|
|
|
sarah schafer drh05-00284 approved per DRH05-00284.
|
Routing - PLUMBING | 4/20/2007 | | 4/24/2007 | | PASS |
|
|
|
dcva required on the service. if a chemical station is installed at the mop sink provide a water supply for it.
|
Routing - Erosion and Sediment | 4/20/2007 | | 4/20/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 4/6/2007 | | 4/20/2007 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 4/19/2007 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 4/18/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 4/6/2007 | | 4/18/2007 | | FAIL |
|
|
|
called action courier ###-#### for pickup - Received a comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING Land Div | 4/5/2007 | | 4/6/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 4/5/2007 | | 4/6/2007 | | DONE |
|
|
|
4/6/2007 07:58:57 JCM - activity updated through activity BLDA174 from case BLD07-00855.
|
Recd Pcfee & Taken To Pln CK | | | 4/5/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/5/2007 | | |
|
|
|
|
Application received | | | 4/5/2007 | | |
|
|
|
|