Case Summary (BLD) | | | 5/14/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/14/2008 | | DONE |
|
|
|
|
First Notice | 3/4/2008 | 3/4/2008 | 3/13/2008 | | DONE |
Dave Hannah
|
|
|
|
(F) Reprint permit | | | 3/11/2008 | | DONE |
|
|
|
|
Letter of compliance | | | 3/6/2008 | | DONE |
|
|
|
Letter of Compliance issued
|
BLD-Final | 2/21/2008 | 2/22/2008 | 3/4/2008 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/21/2008 at 11:50:34 AM. Contact: ###-####.
|
DOC - Permit Finaled | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/25/2008 | 2/25/2008 | 2/25/2008 | A | PASS |
Forrest France
|
|
|
Project related fire alarm and sprinkler permits have been finaled, life safety passed, noted construction partition to be removed when no longer necessary.
|
FIRE-Final Inspection | 2/19/2008 | 2/20/2008 | 2/20/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety per scope of permit work finaled.
|
BLD-Framing/Rough-in | 11/9/2007 | 11/9/2007 | 11/11/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/9/2007 at 10:10:40 AM. Contact: ###-####. ok to cover second lid in corrador ceiling
|
BLD-Framing/Rough-in | 11/5/2007 | 11/5/2007 | 11/6/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 8:21:10 AM. Contact: ###-####. ok to cover corrador ceiling
|
BLD-Framing/Rough-in | 10/31/2007 | 11/1/2007 | 11/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/31/2007 at 1:49:33 PM. Contact: ###-####.corrador walls ok to cover
|
BLD-Framing/Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 5:38:18 AM. Contact: ###-####. ok to cover floor on third floor
|
Issue PAID IN FULL permit | | | 7/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/26/2007 | | |
|
|
|
left mess for eric peterson at ###-#### that permit is ready & need gc & rce #
|
Routing - PLAN CHECK | 5/11/2007 | | 5/17/2007 | | PASS |
|
|
|
Completed the resubmittal review. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2007 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2007 | | |
|
|
|
|
Telephone call | | | 5/17/2007 | | |
|
|
|
Called Eric permit ready and fee given NEED G.C. number
|
CHANGE STATUS TO (RDY) | | | 5/17/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/12/2007 | | 5/17/2007 | | PASS |
|
|
|
5/17/2007 10:08:26 CJW - activity updated through activity BLDA022 from case BLD07-00898.
|
Plan resubmittals requested | | | 5/14/2007 | | DONE |
|
|
|
plan resubmittal rcvd, 3 copies of A1.1, A2.0, A2.1, A3.0, plans taken to Carl Westfall
|
Routing - FIRE | 5/10/2007 | | 5/11/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 5/11/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 4/16/2007 | | 5/10/2007 | | FAIL |
|
|
|
Completed the IBC plan review. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 4/13/2007 | | 4/16/2007 | | PASS |
|
|
|
Sarah Schafer (change out of exterior door on south side at end of the corridor extension to the outside) - Approved. Door frame color and glass shall match existing entries on structure.
|
Routing - PUBLIC WORKS | 4/12/2007 | | 4/13/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 4/11/2007 | | 4/12/2007 | | DONE |
|
|
|
4/12/2007 12:46:36 MYS - activity updated through activity BLDA172 from case BLD07-00898.
|
Plans ACCEPTED BY PLAN TECH | | | 4/11/2007 | | |
|
|
|
|
Application received | | | 4/10/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/10/2007 | | DONE |
|
|
|
|