Meeting | | | 2/27/2009 | | DONE |
|
|
|
no final cert of value ever received - signed off per RAD
|
Third Notice BLD | 10/30/2007 | 10/30/2007 | 2/26/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Case Summary (BLD) | | | 12/4/2008 | | |
|
|
|
|
Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 9/27/2007 | 9/27/2007 | 10/17/2007 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
DOC - Permit Finaled | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Dave Hannah
|
|
|
|
Letter of compliance | | | 9/27/2007 | | DONE |
|
|
|
Letter of compliance issued 9-27-07
|
FIRE-Final Inspection | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PASS |
Forrest France
|
|
|
Items on correction notice verified for compliance, fire life safety inspection passed, contractor to provide "door to remain unlocked while building is occupied" signage at the main entry/exit prior to structural final as discussed, PFE's to be installed at tenant occupancy.
|
Plan resubmittals received | | | 9/24/2007 | | |
|
|
|
Received 1 cover transmittal, 1 copy of sheets A0.0, A2.1, A2.2 and taken to Dan Hannah's in box
|
BLD-Conference | 9/19/2007 | 9/19/2007 | 9/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/14/2007 | 9/17/2007 | 9/17/2007 | P | FAIL |
Dave Hannah
|
|
|
jim Phone #: ###-#### needs fire signoffs
|
FIRE-Final Inspection | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | FAIL |
Forrest France
|
|
|
Missing approved door hardware at the second floor stairway exit and office doors, need to install two exit signs at the 2nd floor as red-lined per plan review, missing a fire sprinkler head in a utility closet on the second floor, remove the manual thumbturn at the main entry/exit door, provide lever hardware at all locations as indicated on plans, no fire sprinkler protection has been provided for the mech/utility room on the first floor, need to final fire sprinkler permit prior to life safety final.
|
BLD-Framing/Rough-in | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
BLD-Conference | 5/18/2007 | 5/21/2007 | 5/21/2007 | A | PART |
Dave Hannah
|
|
|
jim campbell; Phone #: ###-#### Internet Inspection Request from: Delphine Kavanaugh went over project and ada ramp
|
Issue PAID IN FULL permit | | | 4/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2007 | | DONE |
|
|
|
t/c w mark sanders ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 4/18/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 4/12/2007 | | 4/17/2007 | | PASS |
|
|
|
4/17/2007 13:42:16 RMH - activity updated through activity BLDA022 from case BLD07-00908.
|
Routing - PLAN CHECK | 4/17/2007 | | 4/17/2007 | | PASS |
|
|
|
|
Routing - FIRE | 4/17/2007 | | 4/17/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/17/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/17/2007 | | DONE |
|
|
|
|
1st review completed | | | 4/17/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/12/2007 | | |
|
|
|
|
Pending Assignment by MYS | 4/11/2007 | | 4/12/2007 | | DONE |
|
|
|
4/12/2007 09:36:25 LEG - activity updated through activity BLDA175 from case BLD07-00908.
|
Recd Pcfee & Taken To Pln CK | | | 4/11/2007 | | DONE |
|
|
|
|
Application received | | | 4/11/2007 | | |
|
|
|
|