Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD07-00917
StatusFinaled
Name BOISE HIGH SCHOOL
Site Address 1010 W WASHINGTON ST
Project NameBOISE HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
(BOISE HIGH SCHOOL - 1st, 2nd & 3rd FLR AREAS) To create a 500 sq. ft. area on the floor for a stair enclosure area to include the main entry and install new fire-rated exit doors from first floor through stair enclosure; modify 6,900 sq. ft. portion of the second floor changing storage areas into classroom usage and installing new doors across the non-rated corridor between the west & east wings and install doors to separate the auditorium exiting from the main corridor; to remodel a 4,975 sq.ft. area on the 3rd floor changing use from storage to classrooms and a floor opening for the new exit stair enclosure; to perform seismic upgrade at first, second & third floors and at the roof structure, tying the structural framing to the exterior walls; infill third floor at removed old stair between second and third floors; install new handrails at exterior stairs from second floor to grade, per approved plans. Work includes select interior demolition of portion of second and third floors in the southwest corner to allow construction of a new 1-hour enclosed stairway (does not connect to the basement). To install structural support for the new stairway enclosure walls and landings; cut a new opening in a masonry wall on the first floor as part of the 1-hour enclosure that will include the existing main floor exit leading directly to the exterior; install 60 minute fire-rated, labeled, self-closing, doors at stair enclosure entries; to upgrade the floor/ceiling area directly below the 1-hour enclosure and all support structure that will carry the new enclosure to be 1-hour floor/ceiling, beam and column systems. Individually wrap the new W12x72 steel beam and 5x5x1/4 beam support column at the west end of new beam in the basement with listed 1-hour fire-rated assemblies. To brace the parapets to the roof per plans. Upgrade electrical, mechanical, plumbing, sprinkler and alarm systems to meet tenant needs and comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice8/24/20078/24/20079/13/2007 DONE
DetailsJim Sly
BLD-Final8/23/20078/24/20078/24/2007PPASS
DetailsJim Sly
jim Phone #: 941-451
Verified affidavit from MTI and final letter from Engineer. C/C issued
DOC - Permit Finaled8/24/20078/24/20078/24/2007PPASS
DetailsJim Sly
BLD-Final8/23/20078/23/20078/23/2007PNR
DetailsJim Sly
JIM Phone #: ###-####
Need 2 HVAC permits finaled.
BLD-Final8/21/20078/22/20078/22/2007PPART
DetailsTony Young
jim Phone #: ###-####
temp occ ok,, need trades complete finals,, letter of approval for special inspections,, and any letter of approvals from architect
FIRE-Final Inspection8/21/20078/22/20078/22/2007APASS
DetailsForrest France
Required corrections have been completed, fire life safety passed inspection.
FIRE-Final Inspection8/20/20078/21/20078/21/2007AFAIL
DetailsForrest France
Missing required exit signs as indicated on approved plan set for the second floor level, also need to install one EM light and repair one existing EM light as annotated, remainder of life safety is acceptable.
BLD-Framing/Rough-in8/14/20078/14/20078/14/2007PPASS
DetailsTony Young
Ceiling grid; Jim; Phone #: ###-#### Internet Inspection Request from: Hattie James
all ceiling grid ok
FIRE-Conference8/7/20078/8/20078/8/2007ADONE
DetailsForrest France
On site visit to discuss fire code review notes and project related fire life safety issues including door hardware, exit signs/EM lighting, sprinkler coverage, fire alarm work, etc.
BLD-Other8/2/20078/3/20078/6/2007PNR
DetailsDave Hannah
jim Note: ceiling grid Late as possible Phone #: ###-####
BLD-Framing/Rough-in8/1/20078/1/20078/1/2007PPASS
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
stair tower drop ceiling ok
BLD-Framing/Rough-in7/27/20077/30/20077/30/2007APART
DetailsTony Young
Jim,, stair tower; Phone #: ###-####
stair tower frame ok,, pending ele, r/in one area
BLD-Framing/Rough-in7/26/20077/27/20077/27/2007ANR
DetailsTony Young
jim Phone #: ###-####
need u l listings,,
BLD-Framing/Rough-in7/19/20077/20/20077/20/2007PPART
DetailsTony Young
jim - sheet rock in basement; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
rock under beam ok
BLD-Other7/18/20077/18/20077/18/2007PPART
DetailsTony Young
jim Phone #: ###-####
masonary window infill ok
BLD-Other7/17/20077/17/20077/17/2007PPART
DetailsTony Young
jim - covering ceiling and fire taping Phone #: ###-####
all 4 ft areas that had been removed for seismic ties are ok now,, back to 1hr via 5/8 X sheetrock and sealed up,,
FIRE-Conference7/12/20077/12/20077/13/2007PDONE
DetailsForrest France
On site visit, discussed repair of existing emergency lighting at the stairways, project schedule, related fire sprinkler and alarm permits.
BLD-Conference7/12/20077/12/20077/13/2007APART
DetailsTony Young
Jim; Phone #: ###-####
stair beam ok w/ wrapping w/ 5/8" to make 1hr assbly,, also 4' around classrooms ok replacing lath and plaster w/ 5/8" and seal to the you can w/ firecaulk,, sprinkler system is in portions of area above and below drop ceilings
BLD-Framing/Rough-in7/13/20077/13/20077/13/2007PPART
DetailsTony Young
jim NOte: 2nd floor Phone #: ###-####
ok to cover hallway areas,,
BLD-Framing/Rough-in7/12/20077/12/20077/13/2007PCANC
DetailsTony Young
Jim; Phone #: ###-####
BLD-Conference7/11/20077/11/20077/12/2007PPASS
DetailsTony Young
JIM Phone #: ###-####
RFI#
wrap of steel beam ok
BLD-Framing/Rough-in7/6/20077/9/20077/9/2007PPART
DetailsTony Young
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
3rd floor walls as noted on plans,, pendind elec r/in on some areas
BLD-Footing6/29/20077/2/20077/2/2007APASS
DetailsTony Young
Jim; Phone #: ###-####
stair ftg ok,, also all seismic ties in place
BLD-Footing6/28/20076/29/20077/2/2007APASS
DetailsTony Young
jim Note: rebar - if possible mid morning - concrete order about 11:00 Phone #: ###-####
Telephone call  7/2/2007 DONE
Spoke with Stan Beus of Shiloh Fire Protection. Stan was inquiring whether or not the floor control valves will be required to be installed during the retorfit of the existing fire sprinkler system within the Boise high school.
Meeting  7/2/2007 DONE
Met with Dave Hanneman regarding the request by Shiloh sprinkler to eliminate the requirement to add floor control assembly valves to the existing fire protection sprinkler system at Boise High school. The fire marshal has agreed not to require the installation of new floor control valve assemblys in this existing 3 story building.
BLD-Framing/Rough-in6/27/20076/28/20076/28/2007APART
DetailsTony Young
jim Phone #: ###-####
remainder of seismic straps
BLD-Framing/Rough-in6/25/20076/26/20076/26/2007PPART
DetailsTony Young
jim Phone #: ###-####
1st floor and ceiling seismic strapping,, see inspection sheet for room #s
BLD-Other6/15/20076/22/20076/22/2007APASS
DetailsTom Arcoraci
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang 3rd floor 333 334 336 337 rms ok wip
BLD-Other6/15/20076/21/20076/21/2007APART
DetailsJim Sly
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Floor infill framing (old stairway) 2nd to 3rd floor......OK
BLD-Other6/15/20076/20/20076/20/2007ACANC
DetailsJim Storey
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Other6/15/20076/19/20076/19/2007ACANC
DetailsTony Young
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Other6/15/20076/18/20076/18/2007APART
DetailsDave Hannah
jim - seismic bracing; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang third floor seismic straping ok to cover
Issue PAID IN FULL permit  5/30/2007 DONE
Plan resubmittals received  5/21/2007  
Received 1 cover transmittal and 1 copy of Project start up for special inspections and per Dan Stuart original added to RDY plans and copy taken to records
Plan assigned to (DRS)4/19/2007 5/18/2007 PASS
5/18/2007 08:25:12 DRS - activity updated through activity BLDA022 from case BLD07-00917.
Routing - PLAN CHECK5/18/2007 5/18/2007 PASS
Outside structural review completed and approved. routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  5/18/2007 PASS
Inspection Record Card- Bld  5/18/2007 DONE
Telephone call  5/18/2007 DONE
t/c w margie kennedy at ###-#### - permit ready and fees given
Permit Ready to Issue  5/18/2007 DONE
Routing Off Site - STRUCTURAL5/16/2007 5/17/2007 PASS
Routing structural plan review response to outside engineering for re-review.//Called Action Courier for pick up--5/16/07 @ 9:07 AM BAS 5/18/07 - Received fax from structural engineering performing plan review approving thier review.
Routing - PLAN CHECK5/11/2007 5/15/2007 PEND
New plan sheets added to plans. New structural engineering data resubmitted. Routing back to structural engineering review firm.
Plan resubmittals received  5/15/2007  
Received 1 cover transmittal, 1 letter from Hummel Architects, 1 copy of project special inspections, 3 copies of Plan Review comments/responses from Lochsa Engineering, 3 copies of sheet S3.04 and taken to Dan Stuart
Plan Reviewer's activity  5/15/2007 DONE
Start Up for special Inspection form resubmitted did not have the special inspection firm specified. This firm is to be hired by the owner or the disign professional in responsible charge. The contractor cannot hire them. Sent Margie Kennedy a fax requesting this information. Response to structural review data is being sent to outsource contract structural engineering firm for re-review.
1st review completed  5/11/2007 FAIL
Routing - FIRE5/10/2007 5/11/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK4/19/2007 5/10/2007 FAIL
Resubmittals required for completed Special Inspection form and structural engineering plan review. Routing to fire code analyst for review.
Plan resubmittals requested  5/10/2007 DONE
Copy of plan review e-mailed to Margie Kennedy.
Plan resubmittals requested  5/8/2007 DONE
Copy of structural plan review faxed to Margie Kennedy for response.
Routing Off Site - STRUCTURAL4/19/2007 5/1/2007 FAIL
Received structural review corrections list and faxed copy of required corrections and cover letter to Margie Kennedy.
Routing - Addressing4/19/2007 4/19/2007 PASS
Telephone call  4/19/2007 DONE
called action couriers for pick up to off site engineering
Routing - PUBLIC WORKS4/19/2007 4/19/2007 PASS
Pending Assignment by MYS4/12/2007 4/19/2007 DONE
4/19/2007 10:12:31 MYS - activity updated through activity BLDA168 from case BLD07-00917.
Plans ACCEPTED BY PLAN TECH  4/12/2007  
Need G.C. number, did not see mech compliance
Recd Pcfee & Taken To Pln CK  4/12/2007 DONE
Application received  4/12/2007  
Third Notice BLD10/1/200710/1/2007   
Second Notice has not been responded to.