Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-00954
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 575 S 13TH ST
Project NameBOISE RESCUE MISSION
Customer Number 
ePlanReviewNo
Description
Boise Rescue Mission River of Life - (Addition and Remodel) - Phase 1 - To demolish and remove existing interior partitions, doors and kitchen equipment to delete the existing kitchen, walls separating the small and large dining areas. To remodel these areas to create one large (1740 sq. ft.) dining room. To construct a 1,300 square foot, one story, kitchen addition on the northeast corner of the existing building. The addition is constructed of concrete foundation and slab floor, masonry exterior walls and metal roof joist framing with metal roof deck and single ply membrane roofing system. Phase 2 - To convert the existing Day Shelter into additional showers and restroom. To remove two existing exterior windows and install two new egress doors at the north and west exterior walls of large first floor west men's dormitory room. This permit also includes related site improvements. All construction per the approved plans and attached comment list. This building is being reviewed as nonseparated uses, with the A-2 Occupancy being most restrictive. The sprinkler system is used for story increase.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD11/7/200811/7/200812/3/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 10/21/200811/7/2008 DONE
FIRE-Final Inspection10/21/200810/21/200810/21/2008PNR
DetailsForrest France
Pending request for fire alarm permit doc final.
Telephone call  10/21/2008  
talked to Dave Hannah & verified that all other permits are finaled- customer had no card available-per rita deyoung ok to issue
Permanent Occupancy  10/21/2008  
ok per Dave Hannah to issue permit-- customer had no occupancy card. all trades were signed off
Telephone call  10/21/2008 DONE
talked to nan hills with the achd that everything is good to go
BLD-Final10/17/200810/20/200810/20/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/17/2008 at 2:16:00 PM. Contact: ###-####. ok for perm occ
BLD-Final10/16/200810/17/200810/20/2008PPASS
DetailsDave Hannah
Scheduled via mobile device. Phone #: 8711566
FIRE-Final Inspection10/16/200810/17/200810/17/2008APART
DetailsForrest France
Fire life safety completed acceptable, however project cannot be finaled until related fire alarm permit # FIR07-00807 is finaled.
BLD-Conference10/10/200810/10/200810/13/2008PPART
DetailsDave Hannah
John Phone #: ###-#### needs city approved plans and fire life saftey final
Telephone call  8/8/2008 DONE
DetailsJason Blais
Jim Gambrel of the Rescue Mission stated construction of Phase II under this permit has started.
Plan Reviewer's activity  5/13/2008 DONE
DetailsJason Blais
Permit-Occupancy extension approved until August 11th 2008 by Building Division Manager. Document attached to case.
BLD-Final11/16/200711/16/200711/16/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/13/2007 at 10:14:58 AM. Contact: ###-####. ok for temp occ one ph one need to complete ph two
FIRE-Final Inspection11/13/200711/16/200711/16/2007APART
DetailsForrest France
Corrections noted for phase one of the project per K. Roule have been completed, fire life safety is acceptable for the portion of permit work as indicated.
BLD-Final11/13/200711/15/200711/16/2007PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/13/2007 at 10:14:58 AM. Contact: ###-####.
FIRE-Final Inspection11/13/200711/14/200711/14/2007ANR
DetailsForrest France
Need project related fire sprinkler and hood suppression system permits finaled prior to request for a life safety inspection.
BLD-Framing/Rough-in11/9/200711/13/200711/13/2007APART
DetailsDave Hannah
john - ceiling Phone #: ###-#### ok to cover ceiling
BLD-Wall cover10/31/200711/1/200711/1/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/31/2007 at 1:53:55 PM. Contact: ###-####. ceiling grid ok to cover dinning room area
Plan Reviewer's activity  10/31/2007 DONE
Alternate Approval accepted by Building Official and Fire Marshal to install fire sprinklers above the rated suspended ceiling in lieu of the 5/8" gyp. board on the roof deck. Alternate Approval document is attached to this case under "Documents".
Code Occupancy Approval10/25/200710/25/200710/25/2007PCANC
DetailsMichael Garner
site inspection complete - addition and landscaping completed according to approved plans and DRH conditions - PASS
Telephone call  10/24/2007 DONE
Called architect, Eileen Davidson, to discuss the inspection issues concerning the 1-hr rated roof-ceiling assembly not being constructed per the approved plans. She has discussed the issue and it sounds as if the contractor was not working off the City approved plans. (The location of the plans is unknown.) She will be looking at options or solutions to address the problem.
Telephone call  10/24/2007 DONE
Called Tammie Newman, Project Director with McAlvain Construction, concerning the inspection issues with the one-hour rated roof-ceiling assembly not being constructed per the City approved plans. She said they had changed superintendents several times on the project and did not have the City approved job site plans. It appears they have been working on an older preliminary set of plans. She needs to obtain an updated set of plans to compare to construction and discuss some options or solutions to the situation.
BLD-Footing6/21/20076/22/20076/25/2007PPASS
DetailsDave Hannah
jose; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Plan resubmittals received  6/20/2007 DONE
Resubmitted Site Plan provided showing addition setback to the east property line now at 3'-3". This changed was approved by Hal Simmons, the Planning Director. Plan sheet forwarded to John Menard for the Office Copy/Records plans.
Plan resubmittals received  6/19/2007  
Received 1 cover transmittal, 3 copies of sheet A-1.0 and taken to Jason B the Project Manager for this project///6/19/07 @ 1:46pm BAS
BLD-Conference6/12/20076/12/20076/13/2007PPASS
DetailsDave Hannah
jose ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Meeting  6/13/2007 DONE
Met with Hal Simmons and Cody Riddle concerning the new addition setback now at 3'-3" versus the approved 5'-3" to the east property line. It was determined by Hal that this change will still meet the requirements of the R-ODD Zoning for interior side setback. The proposed addition construction of a CMU wall with a 30" parapet and no openings complies with Building Code with this change of a reduced setback to property line.
(F) Reprint permit  6/12/2007 DONE
Issue PAID IN FULL permit  6/11/2007 DONE
Print Occupancy Form  5/25/2007 DONE
Telephone call  5/25/2007 DONE
t/c w randy jordan at mcalvain const. ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  5/25/2007  
Routing - PLAN CHECK5/8/2007 5/24/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/24/2007 DONE
Plan assigned to (JCM)4/19/2007 5/24/2007 PASS
5/24/2007 13:38:55 JCM - activity updated through activity BLDA022 from case BLD07-00954.
Plan resubmittals received  5/23/2007  
received plan review report for the project of boise rescue mission(5 pages). also everett street from architecture interior design (2) pages. comcheck for 2003 envelope compliance cert (11) pages. "3" sets of plans with each sheet of A-3.1, A-3.2, A-5.O, & M2.O--plans taken to John Menard
1st review completed  5/8/2007 FAIL
Routing - FIRE5/7/2007 5/8/2007 PASS
Attached review comments to plans.
Routing - PUBLIC WORKS5/4/2007 5/7/2007 PASS
Plan resubmittals requested  5/4/2007 DONE
E-mailed the architect a copy of the plan review list requesting revisions. JCM
Routing PW Environmental5/4/2007 5/4/2007 PASS
Resubmittal plumbing sheets show all kitchen drainage to GI
Routing - PLAN CHECK5/3/2007 5/4/2007 FAIL
John Menard
Routing - PLANNING4/25/2007 5/3/2007 PASS
DRH07-00122 Josh Wilson; CUP07-00039 Cody Riddle-5/2/07

Construction and operation of facility must comply with the terms and conditions of the Conditional Use Permit.
Routing Off Site - STRUCTURAL4/19/2007 4/30/2007 PASS
Received letter from consulting structural engineer approving plans and calculations.
Routing - PLUMBING4/20/2007 4/25/2007 PASS
per plans and 2003 upc
Plan resubmittals received  4/25/2007  
Received 1 cover transmittal and 4 copies of sheet P2.0 and taken to
Telephone call  4/24/2007 DONE
Talked with Katie Reierson of McAlvain Construction and copies of resubmittal sheet P2.0 will be dropped off tomorrow.
Routing - PUBLIC WORKS4/20/2007 4/20/2007 FAIL
See rejection notes on 4-19-07 per Walt Baumgartner
Routing - Erosion and Sediment4/19/2007 4/20/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS4/19/2007 4/19/2007 FAIL
Scullery area not routed to grease interceptor-correction required-resubmit P2.0 sheet.
Contact Walt Baumgartner @ ###-#### Environmental
Routing - PLANNING Land Div4/19/2007 4/19/2007 PASS
Telephone call  4/19/2007  
called Action Couriers for pick up to off-site engineering
Plans ACCEPTED BY PLAN TECH  4/19/2007  
Routing - Addressing4/19/2007 4/19/2007 PASS
Pending Assignment by MYS4/17/2007 4/19/2007 DONE
4/19/2007 08:38:07 JCM - activity updated through activity BLDA166 from case BLD07-00954.
Recd Pcfee & Taken To Pln CK  4/18/2007 DONE
Application received  4/17/2007  
waiting for customer to come back to pay for plan check fee before process application and route plans